Files
ImpTune/.planning/STATE.md
T
kawa 93a4e30bd4 docs(10-01): complete preflight-package-and-scaffold plan
- Add 10-01-preflight-package-and-scaffold-SUMMARY.md
- Update STATE.md: position moved to Phase 10 plan 01 complete
- Update ROADMAP.md: Phase 10 shows 1/3 summaries (In Progress)
- Mark RTVAL-05 complete in REQUIREMENTS.md
2026-04-13 11:33:23 +02:00

82 lines
4.2 KiB
Markdown

---
gsd_state_version: 1.0
milestone: v1.1
milestone_name: Hardening & Validation
status: Pending (roadmap approved, plans not yet drafted)
stopped_at: Completed 10-01-preflight-package-and-scaffold-PLAN.md
last_updated: "2026-04-13T11:30:00.000Z"
last_activity: 2026-04-13 — Phase 10 plan 01 complete; RUNTIME-VALIDATION.md populated, Copieur_2eme.intunewin committed to evidence/
progress:
total_phases: 4
completed_phases: 1
total_plans: 4
completed_plans: 4
---
# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-04-13 after v1.0 milestone)
**Core value:** Generate a complete, working printer deployment package (script + drivers + icon) in minutes instead of manually scripting each printer setup.
**Current focus:** v1.1 Hardening & Validation — Phase 8 (Nyquist Validation Track)
## Current Position
Milestone: v1.1 Hardening & Validation
Phase: 10 — Real-World Runtime Validation
Plan: 01 complete (10-01-preflight-package-and-scaffold)
Status: In progress — plan 10-02 (Tenant Ingestion) is next
Last activity: 2026-04-13 — Phase 10 plan 01 complete; RUNTIME-VALIDATION.md populated, Copieur_2eme.intunewin committed to evidence/
## Milestone History
- **v1.0** — ImpTune MVP (shipped 2026-04-13) — see [MILESTONES.md](MILESTONES.md)
## Accumulated Context
### v1.1 Phase Structure
- Phase 8: Nyquist Validation Track (NYQ-01..03) — parallelizable audit track
- Phase 9: UX Tech Debt Closure (UX-01..03) — must land before rollout
- Phase 10: Real-World Runtime Validation (RTVAL-01..05) — must pass before rollout
- Phase 11: Real-World Rollout & Feedback (RWR-01..04) — depends on Phases 9 + 10
### Open Concerns (now owned by v1.1 phases)
- Real-world Intune tenant .intunewin acceptance → Phase 10 (RTVAL-01)
- `pnputil` + `$PSScriptRoot` under SYSTEM → Phase 10 (RTVAL-02..04)
- Driver dropdown refresh after upload → Phase 9 (UX-01)
- PRNT-03 Alpine.js port auto-derivation live verification → Phase 9 (UX-02)
- Individual script download links on printer detail page → Phase 9 (UX-03)
- Nyquist-compliant VALIDATION.md across v1.0 phases → Phase 8 (NYQ-01..03)
### Decisions
- **Phase ordering:** RTVAL before RWR (cannot deploy unvalidated runtime); UX before RWR (deployed build must be polished); NYQ parallel to all (pure audit, no code dependency) — placed first so v1.0 validation evidence is fresh before runtime work begins.
- **RTVAL grouping:** RTVAL-01..05 combined into single Phase 10 because they share setup (same tenant, same test endpoint, same RUNTIME-VALIDATION.md report).
- **NYQ as dedicated phase:** Kept standalone (not absorbed) because it audits all 7 v1.0 phases and its evidence feeds defect triage into Phases 9/10.
Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions archived in `milestones/v1.0-ROADMAP.md`.
- [Phase 09-ux-tech-debt-closure]: 09-03: .ps1 routes added as aliases (not renames) to preserve backward compatibility
- [Phase 09-ux-tech-debt-closure]: 09-03: Shared _*_response() helper pattern used for route aliases
- [Phase 09]: Sentinel field (caller=printer_form) for OOB branching: chosen over HX-Target header for clarity and testability
- [Phase 09]: HTMX OOB template includes primary fragment + OOB select sibling in driver_upload_with_oob.html
- [Phase 09-ux-tech-debt-closure]: 09-02: /printers route used for e2e test (full-page with Alpine.js) — no new /printers/new route needed
- [Phase 09-ux-tech-debt-closure]: 09-02: conftest.py adapted — imptune.config uses string paths, init_db() takes no args
- [Phase 10-real-world-runtime-validation]: 10-01: Package under test is Ricoh PCL6 Universal Print (Copieur_2eme.intunewin), ImpTune commit 1c3f458, committed to evidence/ for traceability
- [Phase 10-real-world-runtime-validation]: 10-01: Commit SHA locked before runtime testing — all RTVAL results reference this exact build
### Pending Todos
- Run `/gsd:plan-phase 8` to draft plans for Nyquist Validation Track
- Schedule real Intune tenant + test endpoint access for Phase 10
- Identify target MSP environment for Phase 11 rollout
## Session Continuity
Last session: 2026-04-13T08:58:40.331Z
Stopped at: Completed 09-02-playwright-port-autofill-PLAN.md
Resume file: None