Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-04-13 after v1.0 milestone)
Core value: Generate a complete, working printer deployment package (script + drivers + icon) in minutes instead of manually scripting each printer setup. Current focus: v1.1 Hardening & Validation — Phase 8 (Nyquist Validation Track)
Current Position
Milestone: v1.1 Hardening & Validation Phase: 10 — Real-World Runtime Validation Plan: 01 complete (10-01-preflight-package-and-scaffold) Status: In progress — plan 10-02 (Tenant Ingestion) is next Last activity: 2026-04-13 — Phase 10 plan 01 complete; RUNTIME-VALIDATION.md populated, Copieur_2eme.intunewin committed to evidence/
Milestone History
- v1.0 — ImpTune MVP (shipped 2026-04-13) — see MILESTONES.md
Accumulated Context
v1.1 Phase Structure
- Phase 8: Nyquist Validation Track (NYQ-01..03) — parallelizable audit track
- Phase 9: UX Tech Debt Closure (UX-01..03) — must land before rollout
- Phase 10: Real-World Runtime Validation (RTVAL-01..05) — must pass before rollout
- Phase 11: Real-World Rollout & Feedback (RWR-01..04) — depends on Phases 9 + 10
Open Concerns (now owned by v1.1 phases)
- Real-world Intune tenant .intunewin acceptance → Phase 10 (RTVAL-01)
pnputil+$PSScriptRootunder SYSTEM → Phase 10 (RTVAL-02..04)- Driver dropdown refresh after upload → Phase 9 (UX-01)
- PRNT-03 Alpine.js port auto-derivation live verification → Phase 9 (UX-02)
- Individual script download links on printer detail page → Phase 9 (UX-03)
- Nyquist-compliant VALIDATION.md across v1.0 phases → Phase 8 (NYQ-01..03)
Decisions
- Phase ordering: RTVAL before RWR (cannot deploy unvalidated runtime); UX before RWR (deployed build must be polished); NYQ parallel to all (pure audit, no code dependency) — placed first so v1.0 validation evidence is fresh before runtime work begins.
- RTVAL grouping: RTVAL-01..05 combined into single Phase 10 because they share setup (same tenant, same test endpoint, same RUNTIME-VALIDATION.md report).
- NYQ as dedicated phase: Kept standalone (not absorbed) because it audits all 7 v1.0 phases and its evidence feeds defect triage into Phases 9/10.
Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions archived in milestones/v1.0-ROADMAP.md.
- [Phase 09-ux-tech-debt-closure]: 09-03: .ps1 routes added as aliases (not renames) to preserve backward compatibility
- [Phase 09-ux-tech-debt-closure]: 09-03: Shared _*_response() helper pattern used for route aliases
- [Phase 09]: Sentinel field (caller=printer_form) for OOB branching: chosen over HX-Target header for clarity and testability
- [Phase 09]: HTMX OOB template includes primary fragment + OOB select sibling in driver_upload_with_oob.html
- [Phase 09-ux-tech-debt-closure]: 09-02: /printers route used for e2e test (full-page with Alpine.js) — no new /printers/new route needed
- [Phase 09-ux-tech-debt-closure]: 09-02: conftest.py adapted — imptune.config uses string paths, init_db() takes no args
- [Phase 10-real-world-runtime-validation]: 10-01: Package under test is Ricoh PCL6 Universal Print (Copieur_2eme.intunewin), ImpTune commit
1c3f458, committed to evidence/ for traceability - [Phase 10-real-world-runtime-validation]: 10-01: Commit SHA locked before runtime testing — all RTVAL results reference this exact build
Pending Todos
- Run
/gsd:plan-phase 8to draft plans for Nyquist Validation Track - Schedule real Intune tenant + test endpoint access for Phase 10
- Identify target MSP environment for Phase 11 rollout
Session Continuity
Last session: 2026-04-13T08:58:40.331Z Stopped at: Completed 09-02-playwright-port-autofill-PLAN.md Resume file: None