docs(12-02): complete full i18n template coverage plan — human verification approved

- 12-02-SUMMARY.md: updated Task 3 to approved; 3/3 tasks complete
- STATE.md: session updated, plan advanced, progress 100%, decisions recorded
- ROADMAP.md: phase 12 updated to 2/2 plans complete

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
2026-04-15 16:13:56 +02:00
co-authored by Claude Sonnet 4.6
parent 3b12b0d506
commit ac0dc38efc
2 changed files with 9 additions and 8 deletions
+5 -4
View File
@@ -4,8 +4,8 @@ milestone: v1.1
milestone_name: Hardening & Validation
current_plan: 3
status: verifying
stopped_at: "checkpoint:12-02-task3-human-verify"
last_updated: "2026-04-15T13:51:39.954Z"
stopped_at: Completed 12-i18n-bugfixes/12-02-PLAN.md
last_updated: "2026-04-15T14:13:39.433Z"
last_activity: 2026-04-15
progress:
total_phases: 5
@@ -131,6 +131,7 @@ Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions ar
- [Phase 12-i18n-bugfixes]: IIFE pattern chosen for Alpine store lang init — evaluates at store creation time (inside alpine:init), before any hydration
- [Phase 12-i18n-bugfixes]: playwright browser.new_context(locale=...) used for navigator.language tests — isolates locale per test without global fixture contamination
- [Phase 12-i18n-bugfixes]: Span-wrapper pattern for label text: <label><span x-text>Label</span><input></label> since x-text replaces all child nodes
- [Phase 12-i18n-bugfixes]: Span-wrapper pattern for label text: <label><span x-text>Label</span><input></label> since x-text replaces all child nodes
### Active Blockers
@@ -144,6 +145,6 @@ None. BLOCKER-01 resolved 2026-04-13 via commits 74535ea (HMAC over IV+ciphertex
## Session Continuity
Last session: 2026-04-15T13:51:35.981Z
Stopped at: checkpoint:12-02-task3-human-verify
Last session: 2026-04-15T14:13:39.425Z
Stopped at: Completed 12-i18n-bugfixes/12-02-PLAN.md
Resume file: None
@@ -71,7 +71,7 @@ completed: 2026-04-15
- **Duration:** ~25 min
- **Started:** 2026-04-15T13:48:00Z
- **Completed:** 2026-04-15T14:13:00Z
- **Tasks:** 2/3 complete (Task 3 = human-verify checkpoint)
- **Tasks:** 3/3 complete
- **Files modified:** 15
## Accomplishments
@@ -87,7 +87,7 @@ Each task was committed atomically:
1. **Task 1: Add missing translation keys to base.html dictionary** - `e8801ec` (feat)
2. **Task 2: Wire all template strings to i18n store** - `59fc8b1` (feat)
3. **Task 3: Human verification** - checkpoint (awaiting user)
3. **Task 3: Human verification — full i18n coverage on all pages** - approved by user (2026-04-15)
## Files Created/Modified
- `imptune/templates/base.html` - Extended translations.fr and translations.en with 60+ new keys
@@ -144,8 +144,8 @@ None - no external service configuration required.
## Next Phase Readiness
- All template strings are wired; FR/EN toggle will update all visible UI text
- Human verification checkpoint (Task 3) is pending — user must confirm all strings switch correctly on each page
- After checkpoint approval, plan 12-02 is complete and phase 12 can proceed to 12-03 (if any) or close
- Human verification (Task 3) approved 2026-04-15 — user confirmed all strings switch correctly between FR and EN on every page
- Plan 12-02 is complete; phase 12 can proceed to 12-03 (if any) or close
---
*Phase: 12-i18n-bugfixes*