Files
Sharepoint-Toolbox/.planning/ROADMAP.md
Dev fd442f3b4c
Some checks failed
Release SharePoint Toolbox v2 / release (push) Failing after 14s
chore: archive v1.1 Enhanced Reports milestone
v1.1 shipped with 4 phases (25 plans), 10/10 requirements complete:
- Global site selection (toolbar picker, all tabs consume)
- User access audit (Graph people-picker, direct/group/inherited)
- Simplified permissions (plain-language labels, risk levels, detail toggle)
- Storage visualization (LiveCharts2 pie/donut + bar charts)

Post-phase polish: centralized site selection (removed per-tab pickers),
claims prefix stripping, StorageMetrics backfill, chart tooltip fix,
summary stats in app + HTML exports.

205 tests passing, 10,484 LOC.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-08 10:21:02 +02:00

1.3 KiB

Roadmap: SharePoint Toolbox v2

Milestones

  • v1.0 MVP — Phases 1-5 (shipped 2026-04-07) — archive
  • v1.1 Enhanced Reports — Phases 6-9 (shipped 2026-04-08) — archive

Phases

v1.0 MVP (Phases 1-5) — SHIPPED 2026-04-07
  • Phase 1: Foundation (8/8 plans) — completed 2026-04-02
  • Phase 2: Permissions (7/7 plans) — completed 2026-04-02
  • Phase 3: Storage and File Operations (8/8 plans) — completed 2026-04-02
  • Phase 4: Bulk Operations and Provisioning (10/10 plans) — completed 2026-04-03
  • Phase 5: Distribution and Hardening (3/3 plans) — completed 2026-04-03
v1.1 Enhanced Reports (Phases 6-9) — SHIPPED 2026-04-08
  • Phase 6: Global Site Selection (5/5 plans) — completed 2026-04-07
  • Phase 7: User Access Audit (10/10 plans) — completed 2026-04-07
  • Phase 8: Simplified Permissions (6/6 plans) — completed 2026-04-07
  • Phase 9: Storage Visualization (4/4 plans) — completed 2026-04-07

Progress

Phase Milestone Plans Status Completed
1-5 v1.0 36/36 Shipped 2026-04-07
6-9 v1.1 25/25 Shipped 2026-04-08