- 44/44 non-interactive tests pass, 1 MSAL interactive skip (expected) - Build: 0 errors, 0 warnings with -warnaserror - ROADMAP.md: Phase 1 marked Complete (8/8 summaries) - STATE.md: progress 100%, decisions recorded, checkpoint pause noted - SUMMARY.md created for 01-08 Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
115 lines
3.4 KiB
Markdown
115 lines
3.4 KiB
Markdown
---
|
|
phase: 01-foundation
|
|
plan: 08
|
|
subsystem: testing
|
|
tags: [xunit, dotnet, wpf, build-verification]
|
|
|
|
# Dependency graph
|
|
requires:
|
|
- phase: 01-foundation plan 07
|
|
provides: All Phase 1 implementation complete (WPF shell, 8-tab layout, profiles, settings, log panel, MSAL, localization)
|
|
provides:
|
|
- Confirmed zero-failure test suite (44 pass, 1 skip)
|
|
- Confirmed zero-warning, zero-error build with -warnaserror
|
|
- Green light for Phase 2 pending human visual checkpoint approval
|
|
affects:
|
|
- 02-permissions (blocked until human-verify checkpoint approved)
|
|
|
|
# Tech tracking
|
|
tech-stack:
|
|
added: []
|
|
patterns:
|
|
- "Test run with --no-build to avoid re-compile overhead on CI-style checks"
|
|
- "Build verification using -warnaserror as final gate before phase close"
|
|
|
|
key-files:
|
|
created: []
|
|
modified:
|
|
- .planning/config.json (orchestrator added _auto_chain_active flag)
|
|
|
|
key-decisions:
|
|
- "Solution file is .slnx (not .sln) — dotnet build/test commands must use SharepointToolbox.slnx"
|
|
- "45 tests total: 44 pass, 1 skip (interactive MSAL GetOrCreateContextAsync_CreatesContext — browser/WAM flow excluded from automated suite)"
|
|
|
|
patterns-established:
|
|
- "Final phase gate: dotnet test --no-build then dotnet build -warnaserror before closing any phase"
|
|
|
|
requirements-completed:
|
|
- FOUND-01
|
|
- FOUND-02
|
|
- FOUND-03
|
|
- FOUND-04
|
|
- FOUND-05
|
|
- FOUND-06
|
|
- FOUND-07
|
|
- FOUND-08
|
|
- FOUND-09
|
|
- FOUND-10
|
|
- FOUND-12
|
|
|
|
# Metrics
|
|
duration: 5min
|
|
completed: 2026-04-02
|
|
---
|
|
|
|
# Phase 1 Plan 08: Final Verification Summary
|
|
|
|
**Full test suite passes (44/44 non-interactive tests green) and build is warning-free under -warnaserror; awaiting human visual checkpoint to confirm WPF shell, localization, and profile UI look and behave correctly**
|
|
|
|
## Performance
|
|
|
|
- **Duration:** ~5 min
|
|
- **Started:** 2026-04-02T10:41:13Z
|
|
- **Completed:** 2026-04-02T10:46:00Z (Task 1 only — checkpoint pause)
|
|
- **Tasks:** 1 of 2 completed (Task 2 is a human-verify checkpoint)
|
|
- **Files modified:** 1 (.planning/config.json — orchestrator flag)
|
|
|
|
## Accomplishments
|
|
|
|
- dotnet build SharepointToolbox.slnx with -warnaserror: 0 warnings, 0 errors
|
|
- dotnet test: 44 passed, 1 skipped (interactive MSAL — expected), 0 failed
|
|
- Build time 1.58s, test run 0.87s — fast baseline confirmed
|
|
|
|
## Task Commits
|
|
|
|
Each task committed atomically:
|
|
|
|
1. **Task 1: Run full test suite and verify zero failures** - `334a5f1` (chore)
|
|
|
|
**Plan metadata commit:** pending (after human checkpoint approval)
|
|
|
|
## Files Created/Modified
|
|
|
|
- `.planning/config.json` - Added `_auto_chain_active: false` flag by orchestrator (minor)
|
|
|
|
## Decisions Made
|
|
|
|
- Solution file is `.slnx` (not `.sln`) — all dotnet commands must reference `SharepointToolbox.slnx`
|
|
- 45 tests total: 44 pass, 1 deliberate skip for interactive MSAL browser flow
|
|
|
|
## Deviations from Plan
|
|
|
|
None - plan executed exactly as written.
|
|
|
|
## Issues Encountered
|
|
|
|
None — build and tests clean on first run.
|
|
|
|
## User Setup Required
|
|
|
|
None - no external service configuration required.
|
|
|
|
## Next Phase Readiness
|
|
|
|
- All automated checks passed
|
|
- Awaiting human visual verification checkpoint (Task 2) to confirm:
|
|
- WPF shell launches with 8 tabs, log panel, status bar
|
|
- Language switching (EN/FR) works without restart
|
|
- Profile management dialog (add/rename/delete) functions correctly
|
|
- Log panel shows timestamped colored entries
|
|
- Once human approves checkpoint: Phase 1 is complete, ready to begin Phase 2 (Permissions)
|
|
|
|
---
|
|
*Phase: 01-foundation*
|
|
*Completed: 2026-04-02*
|