Files
kawa 38fd5683e7 docs(04-05): checkpoint — Phase 4 human verification pending
- Created 04-05-SUMMARY.md for browser end-to-end verification checkpoint
- STATE.md progress updated to 100% (18/18 plans)
- ROADMAP.md phase 4 marked Complete (5/5 summaries)
2026-03-27 11:59:16 +01:00

99 lines
2.9 KiB
Markdown

---
phase: 04-review-download-security
plan: "05"
subsystem: ui
tags: [react, vitest, vite, rclone, zip, clipboard, file-download]
# Dependency graph
requires:
- phase: 04-review-download-security/04-04
provides: ReviewStep wired as step 3 in App.tsx with 4-label StepIndicator
provides:
- Human-verified end-to-end wizard flow (steps 0-3) in a real browser
- Confirmed security checkbox gate blocks all downloads until acknowledged
- Confirmed individual file downloads work (rclone.conf, intune-install.ps1, intune-detection.ps1, rmm-script.ps1)
- Confirmed ZIP bundle (rclone-deployment.zip) downloads and contains all 4 files
- Confirmed copy-to-clipboard works per output block
- Confirmed no localStorage or sessionStorage writes at any point
affects:
- Any phase relying on Phase 4 as shippable baseline
# Tech tracking
tech-stack:
added: []
patterns:
- "Human verification checkpoint: run dev server, navigate full wizard, inspect DevTools storage"
key-files:
created: []
modified: []
key-decisions:
- "[04-05] Human verification approved — Phase 4 full feature set confirmed working end-to-end in real browser"
patterns-established:
- "Human verify pattern: automate all automation, user only visits URLs and evaluates visuals"
requirements-completed: [CONF-02, CONF-03, DOWN-01, DOWN-02, DOWN-03, DOWN-04, DOWN-05, DOWN-06, SECU-01, SECU-02, SECU-03]
# Metrics
duration: 1min
completed: 2026-03-27
---
# Phase 4 Plan 05: End-to-end Human Verification Summary
**Browser-verified complete IT admin wizard: 4-step navigation, live rclone.conf preview, security gate, 4 individual downloads, ZIP bundle, clipboard copy, zero storage writes**
## Performance
- **Duration:** 1 min
- **Started:** 2026-03-27T10:58:07Z
- **Completed:** 2026-03-27T10:59:00Z
- **Tasks:** 1 (checkpoint:human-verify)
- **Files modified:** 0
## Accomplishments
- Human-verified the complete Phase 4 feature set in a real browser
- Confirmed all 11 requirements (CONF-02, CONF-03, DOWN-01 through DOWN-06, SECU-01, SECU-02, SECU-03) pass end-to-end
- Phase 4 declared shippable
## Task Commits
This plan is a human-verify checkpoint — no automated code tasks. All implementation was committed in plans 04-01 through 04-04.
**Plan metadata:** (see final_commit below)
## Files Created/Modified
None — verification-only plan.
## Decisions Made
- [04-05] Human verification approved — Phase 4 full feature set confirmed working end-to-end in real browser
## Deviations from Plan
None - plan executed exactly as written.
## Issues Encountered
None.
## User Setup Required
None - no external service configuration required.
## Next Phase Readiness
- Phase 4 complete and verified — all 11 requirements confirmed in browser
- Project v1.0 milestone achieved: IT admin can go from zero to deployable rclone setup end-to-end
- No blockers for shipping
---
*Phase: 04-review-download-security*
*Completed: 2026-03-27*