Files
ImpTune/.planning/phases/10-real-world-runtime-validation/10-03-report-signoff-SUMMARY.md
T
2026-04-15 17:57:12 +02:00

5.2 KiB

phase, plan, subsystem, tags, requirements, dependency_graph, tech_stack, key_files, decisions, metrics
phase plan subsystem tags requirements dependency_graph tech_stack key_files decisions metrics
10-real-world-runtime-validation 03 validation/reporting
runtime-validation
sign-off
phase-closure
rtval
RTVAL-05
requires provides affects
10-01
10-02
signed-off RUNTIME-VALIDATION.md
Phase 10 closure
.planning/REQUIREMENTS.md
.planning/ROADMAP.md
.planning/STATE.md
added patterns
human sign-off checkpoint
attestation gap acknowledgement
created modified
.planning/phases/10-real-world-runtime-validation/10-03-report-signoff-SUMMARY.md
.planning/phases/10-real-world-runtime-validation/RUNTIME-VALIDATION.md
.planning/ROADMAP.md
.planning/REQUIREMENTS.md
Phase 10 closed with RTVAL-02/03/04 as attestation-only PASSes (only RTVAL-01 artifact-backed); reviewer explicitly acknowledged the audit-trail gap at sign-off rather than blocking closure for a re-run.
completed_date
2026-04-13

Phase 10 Plan 03: Report Sign-off Summary

Finalized RUNTIME-VALIDATION.md, obtained human sign-off with explicit attestation-gap acknowledgement, and flipped Phase 10 tracking docs to complete.

What Was Done

Task 1 — Finalize RUNTIME-VALIDATION.md report body

Completed in the 10-02 → 10-03 handoff window: all RTVAL-01..04 sections carry concrete PASS/FAIL verdicts, evidence links, and notes; top-level Status was flipped to READY FOR SIGN-OFF by the prior agent.

Task 2 — Human review and sign-off (checkpoint)

Reviewer Sébastien QUEROL read the report, acknowledged the attestation-only audit-trail gap for RTVAL-02/03/04, and signed off on 2026-04-13:

  • Top-level Status: flipped to SIGNED OFF
  • Signed off by: Sébastien QUEROL
  • Signed off date: 2026-04-13
  • All three sign-off checkboxes ticked [x]
  • Reviewer explicitly accepted that only RTVAL-01 is artifact-backed; RTVAL-02/03/04 rest on technician verbal attestation. Compensating controls listed in the report (known device, known tenant, single session, known-good generator) stand in for missing log/screenshot evidence.

Commit: 5685fd9docs(phase-10): human sign-off on RUNTIME-VALIDATION.md (attestation gap acknowledged)

Task 3 — Tick requirements, mark Phase 10 complete

  • .planning/REQUIREMENTS.md already had RTVAL-01..05 ticked [x] and the Traceability table showing Complete for each (landed in the 10-02 completion commit 206648c). Idempotent confirmation only — no edits needed.
  • .planning/ROADMAP.md:
    • Phase 10 entry flipped from [ ] to [x] with (completed 2026-04-13) appended.
    • Progress table row for Phase 10 set to v1.1 | 3/3 | Complete | 2026-04-13.

Verification

  • grep "^\*\*Status:\*\* SIGNED OFF" RUNTIME-VALIDATION.md → hit
  • grep "Signed off by:\*\* Sébastien QUEROL" RUNTIME-VALIDATION.md → hit
  • Zero Status: PENDING lines in the report
  • grep "\[x\] \*\*RTVAL-05\*\*" REQUIREMENTS.md → hit
  • grep "\[x\] \*\*Phase 10" ROADMAP.md → hit
  • ROADMAP.md Progress row for Phase 10 shows 3/3 | Complete | 2026-04-13

All verification checks from the plan pass.

Deviations from Plan

None. Task 3 REQUIREMENTS.md edits were already present from plan 10-02's completion commit, making that step a no-op confirmation rather than a mutation. No deviation rules (1-4) triggered.

Phase 10 Closure Note — Attestation-Only Audit Trail

Phase 10 closes with a structurally weakened runtime audit trail that downstream consumers must be aware of:

  • RTVAL-01 (tenant ingestion): PASS, artifact-backed (screenshots + exact .intunewin package committed under evidence/), re-tested on the fixed build after ISSUE-01 was resolved (commits 74535ea + 7716246).
  • RTVAL-02 (install under SYSTEM): PASS, attestation-only — no IntuneManagementExtension.log excerpt, no portal screenshot.
  • RTVAL-03 (detection rule): PASS, attestation-only, 2nd consecutive — no portal screenshot, no manual detect transcript.
  • RTVAL-04 (uninstall under SYSTEM): PASS, attestation-only, 3rd consecutive — no uninstall log, no portal screenshot.

RTVAL-02/03/04 together form an attestation-only runtime half for the phase. The user was warned twice during plan 10-02 (on RTVAL-03 and again on RTVAL-04) that consecutive attestation-only checks damage the audit trail, and chose to proceed both times. At sign-off the user again explicitly acknowledged the gap and accepted Phase 10 closure on that basis.

Implication for future work: If a regression, incident, or customer escalation touches SYSTEM-context install, detection, or uninstall, RTVAL-02/03/04 must be treated as soft PASSes — the "it worked once" claim for this build cannot be independently re-derived from evidence files and must be re-validated with full artifact capture. Phase 11 rollout proceeds at the reviewer's risk.

Self-Check: PASSED

  • FOUND: .planning/phases/10-real-world-runtime-validation/RUNTIME-VALIDATION.md (SIGNED OFF)
  • FOUND: .planning/phases/10-real-world-runtime-validation/10-03-report-signoff-SUMMARY.md
  • FOUND: REQUIREMENTS.md RTVAL-01..05 ticked + Traceability Complete
  • FOUND: ROADMAP.md Phase 10 ticked with 3/3 Complete 2026-04-13
  • FOUND commit: 5685fd9 (Task 2 sign-off)