- STATE.md: status in-progress, stopped_at Task 2, BLOCKER-01 cleared - ROADMAP.md: phase 10 plan progress recalculated
5.4 KiB
gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
| gsd_state_version | milestone | milestone_name | status | stopped_at | last_updated | last_activity | progress | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.1 | Hardening & Validation | in-progress — plan 10-02 resumed; RTVAL-01 PASS on re-test against fixed build; paused at Task 2 (RTVAL-02 on-device install under SYSTEM) | 10-02-live-intune-runtime-validation-PLAN.md — Task 2 (RTVAL-02) human-action checkpoint awaiting technician on-device install evidence | 2026-04-13T00:00:00.000Z | 2026-04-13 — RTVAL-01 re-tested PASS against fixed .intunewin build (commit 00b709d); ISSUE-01 resolved; plan 10-02 paused at Task 2 |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-04-13 after v1.0 milestone)
Core value: Generate a complete, working printer deployment package (script + drivers + icon) in minutes instead of manually scripting each printer setup. Current focus: v1.1 Hardening & Validation — Phase 8 (Nyquist Validation Track)
Current Position
Milestone: v1.1 Hardening & Validation
Phase: 10 — Real-World Runtime Validation
Plan: 02 in progress — Task 1 PASS (RTVAL-01); paused at Task 2 (RTVAL-02) human-action checkpoint
Status: in-progress — RTVAL-01 re-tested PASS against fixed .intunewin build (commit 00b709d); awaiting on-device install evidence for RTVAL-02
Decision: Resume plan 10-02 after HMAC scope + Detection.xml generator fixes landed (commits 74535ea, 7716246); ISSUE-01 resolved
Last activity: 2026-04-13 — RTVAL-01 PASS recorded (commit cf3b86a); plan 10-02 paused at Task 2 checkpoint
Milestone History
- v1.0 — ImpTune MVP (shipped 2026-04-13) — see MILESTONES.md
Accumulated Context
v1.1 Phase Structure
- Phase 8: Nyquist Validation Track (NYQ-01..03) — parallelizable audit track
- Phase 9: UX Tech Debt Closure (UX-01..03) — must land before rollout
- Phase 10: Real-World Runtime Validation (RTVAL-01..05) — must pass before rollout
- Phase 11: Real-World Rollout & Feedback (RWR-01..04) — depends on Phases 9 + 10
Open Concerns (now owned by v1.1 phases)
- Real-world Intune tenant .intunewin acceptance → Phase 10 (RTVAL-01)
pnputil+$PSScriptRootunder SYSTEM → Phase 10 (RTVAL-02..04)- Driver dropdown refresh after upload → Phase 9 (UX-01)
- PRNT-03 Alpine.js port auto-derivation live verification → Phase 9 (UX-02)
- Individual script download links on printer detail page → Phase 9 (UX-03)
- Nyquist-compliant VALIDATION.md across v1.0 phases → Phase 8 (NYQ-01..03)
Decisions
- Phase ordering: RTVAL before RWR (cannot deploy unvalidated runtime); UX before RWR (deployed build must be polished); NYQ parallel to all (pure audit, no code dependency) — placed first so v1.0 validation evidence is fresh before runtime work begins.
- RTVAL grouping: RTVAL-01..05 combined into single Phase 10 because they share setup (same tenant, same test endpoint, same RUNTIME-VALIDATION.md report).
- NYQ as dedicated phase: Kept standalone (not absorbed) because it audits all 7 v1.0 phases and its evidence feeds defect triage into Phases 9/10.
Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions archived in milestones/v1.0-ROADMAP.md.
- [Phase 09-ux-tech-debt-closure]: 09-03: .ps1 routes added as aliases (not renames) to preserve backward compatibility
- [Phase 09-ux-tech-debt-closure]: 09-03: Shared _*_response() helper pattern used for route aliases
- [Phase 09]: Sentinel field (caller=printer_form) for OOB branching: chosen over HX-Target header for clarity and testability
- [Phase 09]: HTMX OOB template includes primary fragment + OOB select sibling in driver_upload_with_oob.html
- [Phase 09-ux-tech-debt-closure]: 09-02: /printers route used for e2e test (full-page with Alpine.js) — no new /printers/new route needed
- [Phase 09-ux-tech-debt-closure]: 09-02: conftest.py adapted — imptune.config uses string paths, init_db() takes no args
- [Phase 10-real-world-runtime-validation]: 10-01: Package under test is Ricoh PCL6 Universal Print (Copieur_2eme.intunewin), ImpTune commit
1c3f458, committed to evidence/ for traceability - [Phase 10-real-world-runtime-validation]: 10-01: Commit SHA locked before runtime testing — all RTVAL results reference this exact build
- [Phase 10-real-world-runtime-validation]: 10-02: RTVAL-01 FAIL — Stop plan 10-02; surface .intunewin structure defect as gap; use /gsd:debug on generator or /gsd:plan-phase 10 --gaps before retesting
- [Phase 10-real-world-runtime-validation]: 10-02: RTVAL-01 PASS on re-test (2026-04-13) — ISSUE-01 resolved by commits
74535ea(HMAC over IV+ciphertext) and7716246(Detection.xml alignment with IntuneWinAppUtil.exe reference format); plan resumed at Task 2
Active Blockers
None. BLOCKER-01 resolved 2026-04-13 via commits 74535ea (HMAC over IV+ciphertext) and 7716246 (Detection.xml aligned with IntuneWinAppUtil.exe reference format); RTVAL-01 re-tested PASS on fixed build.
Pending Todos
- Run
/gsd:plan-phase 8to draft plans for Nyquist Validation Track - Schedule real Intune tenant + test endpoint access for Phase 10
- Identify target MSP environment for Phase 11 rollout
Session Continuity
Last session: 2026-04-13T00:00:00.000Z Stopped at: 10-02-live-intune-runtime-validation — Task 2 (RTVAL-02) human-action checkpoint; awaiting on-device install evidence Resume file: .planning/phases/10-real-world-runtime-validation/10-02-live-intune-runtime-validation-PLAN.md