Files
ImpTune/.planning/phases/08-nyquist-validation-track/08-VERIFICATION.md
T
2026-04-15 17:57:12 +02:00

111 lines
9.5 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
phase: 08-nyquist-validation-track
verified: 2026-04-13T00:00:00Z
status: passed
score: 6/6 must-haves verified
re_verification:
previous_status: null
previous_score: null
gaps_closed: []
gaps_remaining: []
regressions: []
---
# Phase 8: Nyquist Validation Track Verification Report
**Phase Goal:** Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked.
**Verified:** 2026-04-13
**Status:** passed
**Re-verification:** No — initial verification
## Goal Achievement
### Observable Truths (derived from ROADMAP Success Criteria + user brief)
| # | Truth | Status | Evidence |
|---|-------|--------|----------|
| 1 | All 7 v1.0 phases (0107) have a `## Nyquist Record` section in their `VALIDATION.md` | VERIFIED | `grep "## Nyquist Record"` matched all 7 files (01..07-VALIDATION.md) |
| 2 | Every v1.0 `VALIDATION.md` frontmatter carries `nyquist_compliant: true` | VERIFIED | `grep "nyquist_compliant: true"` matched all 7 files |
| 3 | Every v1.0 `VALIDATION.md` frontmatter carries `nyquist_audited: 2026-04-13` | VERIFIED | `grep "nyquist_audited: 2026-04-13"` matched all 7 files |
| 4 | `.planning/milestones/v1.0-VALIDATION-INDEX.md` exists, is signed off, and shows 45/45 pass tally | VERIFIED | File read: frontmatter `status: signed-off` + `signed_off_by: Sébastien QUEROL` + `signed_off_date: 2026-04-13`; tally line 17 "45/45 pass, 0 deferred-v1.2, 0 fail-fix-v1.1, 0 wont-do"; sign-off line 124 `[x] Nyquist audit complete — 2026-04-13 — Sébastien QUEROL` |
| 5 | Roll-up links per-phase VALIDATION.md rows and flat pass/fail table totals 45 rows matching per-phase row counts 14/6/10/5/5/1/4 | VERIFIED | Tally Summary (lines 98107) matches phase-stated `Row counts per phase (14, 6, 10, 5, 5, 1, 4)` in line 19; Phase 1=14 rows validated in body |
| 6 | NYQ-01/02/03 marked Complete in REQUIREMENTS.md | VERIFIED | REQUIREMENTS.md lines 2729 show `[x] **NYQ-01**`, `[x] **NYQ-02**`, `[x] **NYQ-03**`; coverage table rows 6365 all "Complete" |
**Score:** 6/6 truths verified
### Required Artifacts
| Artifact | Expected | Status | Details |
|----------|----------|--------|---------|
| `.planning/phases/01-foundation/01-VALIDATION.md` | Nyquist Record + frontmatter flags | VERIFIED | 34 table rows, flags present, section present |
| `.planning/phases/02-driver-management/02-VALIDATION.md` | Nyquist Record + frontmatter flags | VERIFIED | 34 table rows, flags present |
| `.planning/phases/03-printer-configuration/03-VALIDATION.md` | Nyquist Record + frontmatter flags | VERIFIED | 33 table rows, flags present |
| `.planning/phases/04-script-generation/04-VALIDATION.md` | Nyquist Record + frontmatter flags + SYSTEM-context attestation notes | VERIFIED | 30 table rows; RTVAL-02/03/04 attestation-only notes present per index line 23 |
| `.planning/phases/05-package-export/05-VALIDATION.md` | Nyquist Record + RTVAL-01 byte-level evidence | VERIFIED | 24 table rows; index confirms "strongest row — only artifact-backed live-tenant runtime evidence" |
| `.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md` | Nyquist Record (single-row gap-closure) | VERIFIED | 20 rows (1 Nyquist row + auxiliaries); bidirectional loop with 05-VALIDATION row 4 |
| `.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md` | Nyquist Record | VERIFIED | 27 table rows; anchors to 07-VERIFICATION.md (REQUIREMENTS-free phase, legitimate pattern per index line 25) |
| `.planning/milestones/v1.0-VALIDATION-INDEX.md` | Signed-off 45/45 roll-up with links | VERIFIED | Exists, signed off 2026-04-13, 45/45 pass, per-phase links present, Gap Validation Block + Attestation-Gap Residual Risk blocks present |
### Key Link Verification
| From | To | Via | Status | Details |
|------|-----|-----|--------|---------|
| v1.0-VALIDATION-INDEX.md | Each 0N-VALIDATION.md#nyquist-record | Markdown anchors | WIRED | Every row in the Flat Pass/Fail Table (lines 3276) cites a per-phase file with `#nyquist-record` anchor |
| v1.0-VALIDATION-INDEX.md historical-gap rows | Fixing phases (9/10/6) SUMMARY.md | Commit hashes | WIRED | Gap Validation Block (lines 8288) cross-checks 5 rows against REQUIREMENTS.md + fixing-phase SUMMARY.md; all ✓ |
| REQUIREMENTS.md NYQ-01..03 | Phase 8 plans | requirement IDs | WIRED | 08-01..08-07 PLAN frontmatter → NYQ-01; 08-08 PLAN frontmatter → NYQ-02, NYQ-03 |
| 05-VALIDATION row 4 | 06-VALIDATION row 1 | `TestIntunewinIconInclusion` | WIRED | Bidirectional closure loop confirmed in index line 26 and Gap Validation Block row 4 |
### Requirements Coverage
| Requirement | Source Plan | Description | Status | Evidence |
|-------------|------------|-------------|--------|----------|
| NYQ-01 | 08-01..08-07 (7 plans) | All 7 v1.0 phases have Nyquist-compliant VALIDATION.md | SATISFIED | 7/7 files carry `nyquist_compliant: true` + `## Nyquist Record`; REQUIREMENTS.md line 27 `[x]` |
| NYQ-02 | 08-08 | v1.0-VALIDATION-INDEX.md aggregates per-phase status | SATISFIED | File exists at expected path, signed off, 45-row flat table with per-phase anchors; REQUIREMENTS.md line 28 `[x]` |
| NYQ-03 | 08-08 | Surfaced gaps tracked as defects or explicitly deferred with rationale | SATISFIED | Gap Validation Block documents all 5 historical-gap-closure rows; Attestation-Gap Residual Risk block explicitly records SCRPT-01..05 attestation weakness deferred to Phase 11 with written rationale and prior sign-off; REQUIREMENTS.md line 29 `[x]` |
**Orphaned requirement IDs:** none. REQUIREMENTS.md Phase 8 mapping (NYQ-01/02/03) fully accounted for by plan frontmatters (08-01..08-07 → NYQ-01; 08-08 → NYQ-02, NYQ-03).
### Anti-Patterns Found
None material. Row-count heterogeneity (14/6/10/5/5/1/4) is legitimate per index line 19 — "a function of scope, single-criterion gap-closure phases legitimately produce single-row audits." No TODO/FIXME/placeholder stubs in the VALIDATION.md outputs.
### Known Deviations (user-flagged, verifier judgment)
**Deviation 1 — Historical-gap rows recorded as `pass` rather than `fail-fix-v1.1` (08-02 DRV upload-500 + 4 more).**
Judgment: **Acceptable.** Rationale:
- The Phase 8 goal is to produce a signed-off Nyquist record reflecting the **current state of the tree**, not to retro-actively re-open gaps whose fixes are already shipped and merged.
- All 5 historical-gap-closure rows cite concrete fix commits in fixing phases that have their own signed-off SUMMARY/VERIFICATION artifacts. REQUIREMENTS.md independently confirms UX-01, UX-02, UX-03, PKG-04, RTVAL-01 as Complete.
- The index's Gap Validation Block (lines 8090) explicitly cross-checks each of the 5 rows against REQUIREMENTS.md + fixing-phase SUMMARY.md with a "Confirmed?" column, then states: "Zero rows inflated to `fail-fix-v1.1` because every historical gap is already closed in the tree." This is defensible Nyquist-compliant reasoning, not a cover-up.
- The pattern is consistently applied (5/5 rows, same pattern, explicit rationale), mirrors the 08-01 row 14 precedent the user cited, and satisfies NYQ-03 ("tracked as defects and either fixed in v1.1 or explicitly deferred with rationale") — "fixed in v1.1" is satisfied by "fixed in tree at the time of audit." Marking `fail-fix-v1.1` on already-fixed items would be misleading.
- **Not a gap.**
**Deviation 2 — 08-07 UX-03 provenance mismatch (v1.0-ROADMAP says Phase 5-origin, STATE.md restatement says Phase 7 carry-over).**
Judgment: **Informational only, no action required.** The index row (Phase 7 row 4, line 76) explicitly flags this in its Gap Link cell: "Provenance note: v1.0-ROADMAP.md lists UX-03 as Phase 5 deferral, not Phase 7 — STATE.md restatement imprecise; resolution unaffected." The closure citation (Phase 9 plan 09-03 commits d359001 + 68a2935) is correct regardless of origin-phase labeling. Downstream auditors can reconcile. **Not a gap.**
### Additional Observations (informational)
- **Roadmap tick lag:** `.planning/ROADMAP.md` line 27 still shows Phase 8 as `[ ]` while REQUIREMENTS.md already marks NYQ-01/02/03 as `[x] Complete` and downstream phases 9/10/11 as `[x]`. This is a ROADMAP bookkeeping lag, not a goal failure. Recommend the orchestrator tick Phase 8 in ROADMAP.md when closing the phase. Does not block passing verification.
- **Attestation-gap residual risk (SCRPT-01..05):** Documented in index lines 9294 with explicit ownership by Phase 11 rollout and prior written user sign-off (cd2df1e). Correctly NYQ-03-compliant — explicit deferral with rationale.
### Human Verification Required
None. All goal truths are verifiable via file inspection and cross-reference. The phase is a pure audit deliverable; no runtime behavior to exercise.
### Gaps Summary
No gaps. The phase has delivered:
1. Seven Nyquist-compliant `VALIDATION.md` files with frontmatter flags and `## Nyquist Record` sections.
2. A signed-off `.planning/milestones/v1.0-VALIDATION-INDEX.md` with a 45/45 pass tally, per-phase anchors, a Gap Validation Block cross-checking all 5 historical-gap-closure rows, and an explicit Attestation-Gap Residual Risk block for SCRPT-01..05.
3. NYQ-01/02/03 ticked Complete in REQUIREMENTS.md with Phase 8 ownership.
Both user-flagged deviations have been reviewed and judged acceptable — deviation 1 is consistent with NYQ-03's "fixed in v1.1 OR explicitly deferred" wording applied to "already fixed in tree," and deviation 2 is a self-documented informational note with no downstream impact.
**Recommendation:** Orchestrator can close Phase 8 and tick ROADMAP.md line 27 from `[ ]` to `[x]`.
---
_Verified: 2026-04-13_
_Verifier: Claude (gsd-verifier)_