Files
ImpTune/.planning/ROADMAP.md
T
kawaandClaude Sonnet 4.6 70454c8e14 docs(09-02): complete playwright-port-autofill plan
- STATE.md: advance to plan 2, record UX-02 closure decisions
- ROADMAP.md: Phase 9 now 3/3 summaries (Complete)
- Task commits already in history: 4e9bd9b (scaffolding) + 322fc20 (test)
- 1 Playwright test green: test_port_autofill[chromium] PASSED in 5.49s
- 113 unit tests unaffected

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-13 17:46:38 +02:00

9.1 KiB
Raw Blame History

Roadmap: ImpTune

Milestones

  • v1.0 MVP — Phases 17, 13 plans, 27/27 requirements (shipped 2026-04-13) — see milestones/v1.0-ROADMAP.md
  • 🚧 v1.1 Hardening & Validation — Phases 811, 15 requirements (in progress, started 2026-04-13)

Phases

v1.0 MVP (Phases 17) — SHIPPED 2026-04-13
  • Phase 1: Foundation (3/3 plans) — 2026-04-10
  • Phase 2: Driver Management (2/2 plans) — 2026-04-10
  • Phase 3: Printer Configuration (2/2 plans) — 2026-04-10
  • Phase 4: Script Generation (2/2 plans) — 2026-04-10
  • Phase 5: Package Export (2/2 plans) — 2026-04-10
  • Phase 6: Wire Icon into .intunewin (1/1 plan, gap closure) — 2026-04-10
  • Phase 7: Dashboard & Navigation Polish (1/1 plan, gap closure) — 2026-04-13

Full details: milestones/v1.0-ROADMAP.md

🚧 v1.1 Hardening & Validation (Phases 811)

  • Phase 8: Nyquist Validation Track — Retro-fit Nyquist-compliant VALIDATION.md across all 7 v1.0 phases with evidence-backed checks (completed 2026-04-13)
  • Phase 9: UX Tech Debt Closure — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use (completed 2026-04-13)
  • Phase 10: Real-World Runtime Validation — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint (completed 2026-04-13)
  • Phase 11: Real-World Rollout & Feedback — Deploy the container to a real MSP environment, push a real package, and capture structured technician feedback (completed 2026-04-13)

Phase Details

Phase 8: Nyquist Validation Track

Goal: Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked. Depends on: Nothing (parallelizable — pure audit of shipped code, no runtime dependency) Requirements: NYQ-01, NYQ-02, NYQ-03 Success Criteria (what must be TRUE):

  1. An operator can open any of the 7 v1.0 phase folders and read a VALIDATION.md where every success criterion maps to exactly one observable check with cited evidence (commit, test name, file path, or screenshot)
  2. An operator can open .planning/milestones/v1.0-VALIDATION-INDEX.md and see a single pass/fail roll-up across all 7 phases with links to each phase's validation file
  3. Any validation gap surfaced during the Nyquist pass appears in the index as either a v1.1 defect ticket (linked to the fixing phase) or an explicitly deferred item with written rationale Plans: 8 plans
  • 08-01-PLAN.md — Audit Phase 1 (Foundation) into Nyquist-compliant 01-VALIDATION.md (NYQ-01)
  • 08-02-PLAN.md — Audit Phase 2 (Driver Management) + record POST /drivers/upload 500 gap (NYQ-01)
  • 08-03-PLAN.md — Audit Phase 3 (Printer Configuration) into Nyquist Record (NYQ-01)
  • 08-04-PLAN.md — Audit Phase 4 (Script Generation) with SYSTEM-context attestation notes (NYQ-01)
  • 08-05-PLAN.md — Audit Phase 5 (Package Export) with RTVAL-01 byte-level evidence (NYQ-01)
  • 08-06-PLAN.md — Audit Phase 6 (Wire Icon into .intunewin) into Nyquist Record (NYQ-01)
  • 08-07-PLAN.md — Audit Phase 7 (Dashboard & Nav Polish) into Nyquist Record (NYQ-01)
  • 08-08-PLAN.md — Compile v1.0-VALIDATION-INDEX.md, triage gaps, human sign-off (NYQ-02, NYQ-03)

Phase 9: UX Tech Debt Closure

Goal: The three carried-over UX defects are fixed and live-verified in a real browser so the rolled-out build is the polished one. Depends on: Nothing (independent of validation and rollout — but must complete before Phase 11) Requirements: UX-01, UX-02, UX-03 Success Criteria (what must be TRUE):

  1. A technician uploading a new driver on the printer form sees the new DriverDesc appear in the dropdown without manually reloading the page
  2. A technician typing an IP address into the printer form sees the port field auto-populate via the PRNT-03 Alpine.js handler, observed live in a real browser and recorded in VALIDATION.md
  3. A technician on the printer detail page can click direct download links for the install, uninstall, and detect scripts individually, in addition to the existing package export buttons Plans: 3 plans
  • 09-01-driver-upload-fix-and-inline-oob-PLAN.md — Fix POST /drivers/upload 500 + add inline upload to printer form with HTMX OOB refresh (UX-01)
  • 09-02-playwright-port-autofill-PLAN.md — Add Playwright dev dep + headless test for PRNT-03 IP->port auto-fill (UX-02)
  • 09-03-script-download-links-PLAN.md — Add .ps1 route aliases + printer_detail.html script download links (UX-03)

Phase 10: Real-World Runtime Validation

Goal: Generated .intunewin, install, detect, and uninstall artifacts are proven to work end-to-end on a real Intune tenant against a real Windows endpoint, with evidence recorded. Depends on: Phase 9 (rollout uses the validated-AND-polished build; validation itself only strictly needs v1.0, but running it on the polished build avoids re-doing the pass) Requirements: RTVAL-01, RTVAL-02, RTVAL-03, RTVAL-04, RTVAL-05 Success Criteria (what must be TRUE):

  1. A generated .intunewin package is uploaded to a real Microsoft Intune tenant and accepted without format errors, with the tenant ingestion confirmation captured as evidence
  2. A technician assigning the package to a real Intune-managed Windows endpoint observes the install script succeed under SYSTEM context, with pnputil driver staging and $PSScriptRoot path resolution verified in the device log
  3. After install, the Intune detection rule driven by the generated detect script reports "installed" for the endpoint
  4. A technician triggering uninstall from Intune sees the printer cleanly removed from the endpoint under SYSTEM context
  5. A reviewer can open RUNTIME-VALIDATION.md and read a signed-off report listing tenant, device, OS build, driver vendor(s), screenshots/logs, and any issues found Plans: 3 plans
  • 10-01-preflight-package-and-scaffold-PLAN.md — Generate real .intunewin from current commit and scaffold RUNTIME-VALIDATION.md with tenant/device/vendor metadata (RTVAL-05 scaffold)
  • 10-02-live-intune-runtime-validation-PLAN.md — Drive RTVAL-01..04 manual checkpoints against a live Intune tenant + real Windows endpoint, capturing screenshots and device logs as evidence
  • 10-03-report-signoff-PLAN.md — Finalize RUNTIME-VALIDATION.md, human sign-off, tick RTVAL-01..05 and mark Phase 10 complete

Phase 11: Real-World Rollout & Feedback

Goal: ImpTune is running in a real MSP environment, has produced a package that actually reached endpoints, and technician feedback has been captured and triaged. Depends on: Phase 9 (UX tech debt), Phase 10 (runtime validation passed) Requirements: RWR-01, RWR-02, RWR-03, RWR-04 Success Criteria (what must be TRUE):

  1. ImpTune is running in its single Docker container inside at least one real MSP environment serving real printers, with the host/URL recorded in the feedback document
  2. At least one printer deployment package generated by the deployed instance has been pushed to real endpoints via Intune or NinjaRMM end-to-end
  3. A reviewer can open .planning/feedback/v1.1-rollout.md and read structured feedback from the deploying technician covering what worked, what blocked, and what's missing
  4. Every feedback item in that document is tagged fix-in-v1.1, defer-to-v1.2, or won't-do with written rationale Plans: 3 plans
  • 11-01-deploy-container-to-msp-PLAN.md — Build + deploy ImpTune container into real MSP environment and record host/URL/commit (RWR-01) — closed by operator attestation (local Docker host) 2026-04-13
  • 11-02-push-real-package-PLAN.md — Generate a real package via the deployed instance and push to a real endpoint via Intune/NinjaRMM (RWR-02) — delivered end-to-end via BOTH Intune and NinjaRMM, operator attestation 2026-04-13
  • 11-03-capture-and-triage-feedback-PLAN.md — Capture structured technician feedback in .planning/feedback/v1.1-rollout.md and triage every item (RWR-03, RWR-04) — feedback doc written, zero items to triage (all worked) 2026-04-13

Progress

Phase Milestone Plans Complete Status Completed
1. Foundation v1.0 3/3 Complete 2026-04-10
2. Driver Management v1.0 2/2 Complete 2026-04-10
3. Printer Configuration v1.0 2/2 Complete 2026-04-10
4. Script Generation v1.0 2/2 Complete 2026-04-10
5. Package Export v1.0 2/2 Complete 2026-04-10
6. Wire Icon into .intunewin v1.0 1/1 Complete 2026-04-10
7. Dashboard & Nav Polish v1.0 1/1 Complete 2026-04-13
8. Nyquist Validation Track v1.1 8/8 Complete 2026-04-13
9. UX Tech Debt Closure 3/3 Complete 2026-04-13 2026-04-13
10. Real-World Runtime Validation v1.1 3/3 Complete 2026-04-13
11. Real-World Rollout & Feedback v1.1 3/3 Complete 2026-04-13