18 KiB
milestone, audited, status, scores, gaps, tech_debt, nyquist
| milestone | audited | status | scores | gaps | tech_debt | nyquist | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| v1.1 | 2026-04-15T14:53:14Z | gaps_found |
|
|
|
|
v1.1 Milestone Audit — Hardening & Validation
Milestone: v1.1 Hardening & Validation
Phases: 8–12 (5 v1.1 phases; 12 total phases audited)
Audited: 2026-04-15T14:53:14Z
Auditor: Claude (gsd-verifier via audit-milestone workflow)
Status: gaps_found
Executive Summary
The v1.1 milestone delivered its core technical goals: Nyquist validation track (Phase 8), UX tech debt closure (Phase 9), real-world Intune runtime validation (Phase 10), UI enhancements including printer edit, theme toggle, and FR/EN i18n (Phase 11), and full i18n template coverage (Phase 12). However, the milestone closes with two structural gaps that trigger the FAIL gate:
-
RWR requirements orphaned — RWR-01 through RWR-04 (Real-World Rollout) are in REQUIREMENTS.md mapped to Phase 11 but appear in no phase VERIFICATION.md. The
v1.1-rollout.mdfeedback document provides evidence for RWR-03 and RWR-04, but the verification chain is broken for all four. -
RTVAL-02/03/04 attestation-only — Phase 10's SYSTEM-context install, detect, and uninstall validations lack artifact evidence (no device logs or portal screenshots captured). The reviewer explicitly accepted this gap; the verifier recorded
gaps_foundfor audit-trail integrity.
Phase Verification Roll-Up
| Phase | Name | Status | Score | Critical Gaps |
|---|---|---|---|---|
| 01 | Foundation | ✅ passed | 13/13 | None |
| 02 | Driver Management | ✅ passed | 16/16 | None |
| 03 | Printer Configuration | ⚠️ human_needed | 9/10 | PRNT-03 (browser confirmation pending) |
| 04 | Script Generation | ✅ passed | 12/12 | None |
| 05 | Package Export | ✅ passed | 11/11 | None |
| 06 | Wire Icon into .intunewin | ✅ passed | 2/2 | None |
| 07 | Dashboard & Nav Polish | ✅ passed | 4/4 | None |
| 08 | Nyquist Validation Track | ✅ passed | 6/6 | None (NYQ-01/02/03 SATISFIED) |
| 09 | UX Tech Debt Closure | ⚠️ human_needed | 11/11 | UX-01/02/03 need live browser confirmation |
| 10 | Real-World Runtime Validation | ❌ gaps_found | 2/5 | RTVAL-02/03/04 attestation-only |
| 11 | UI Enhancements | ✅ passed | 15/15 | None (UIE-01..05 satisfied) |
| 12 | i18n Bugfixes | ✅ passed | 8/8 | None |
Phase pass rate: 10/12 (Phases 10 and 03 have open items; all others clean)
Requirements Coverage (3-Source Cross-Reference)
v1.1 Formal Requirements (REQUIREMENTS.md)
| REQ-ID | Description | VERIFICATION.md | SUMMARY Frontmatter | REQUIREMENTS.md | → Final Status |
|---|---|---|---|---|---|
| NYQ-01 | All 7 v1.0 phases have Nyquist VALIDATION.md | passed (Phase 08) | missing (all 08 SUMMARYs empty) | [x] | partial → effectively satisfied (strong VERIFICATION evidence) |
| NYQ-02 | v1.0-VALIDATION-INDEX.md aggregates status | passed (Phase 08) | missing | [x] | partial → effectively satisfied |
| NYQ-03 | Gaps tracked as defects or deferred with rationale | passed (Phase 08) | missing | [x] | partial → effectively satisfied |
| UX-01 | Driver dropdown refreshes without manual reload | passed (Phase 09) | listed (09-01) | [x] | satisfied |
| UX-02 | PRNT-03 IP→port verified live in browser | passed/human_needed (Phase 09) | listed (09-02) | [x] | satisfied (Playwright test exists; live confirmation deferred) |
| UX-03 | Direct .ps1 download links on printer detail | passed (Phase 09) | listed (09-03) | [x] | satisfied |
| RTVAL-01 | .intunewin accepted by live tenant, evidence captured | passed (Phase 10) | listed (10-02) | [x] | satisfied |
| RTVAL-02 | Install under SYSTEM, pnputil+$PSScriptRoot in device log | gaps_found (Phase 10) | listed (10-02) | [x] | partial (attestation-only; reviewer accepted) |
| RTVAL-03 | Detect reports Installed on real endpoint | gaps_found (Phase 10) | listed (10-02) | [x] | partial (attestation-only; reviewer accepted) |
| RTVAL-04 | Uninstall removes printer under SYSTEM | gaps_found (Phase 10) | listed (10-02) | [x] | partial (attestation-only; reviewer accepted) |
| RTVAL-05 | Signed-off RUNTIME-VALIDATION.md | passed/structural (Phase 10) | listed (10-01) | [x] | satisfied |
| RWR-01 | ImpTune deployed in Docker to real MSP env | MISSING (no VERIFICATION.md) | missing (no SUMMARY) | [x] | orphaned |
| RWR-02 | Real printer package pushed to endpoints | MISSING (no VERIFICATION.md) | missing (no SUMMARY) | [x] | orphaned |
| RWR-03 | Structured technician feedback in v1.1-rollout.md | MISSING (no VERIFICATION.md) | missing (no SUMMARY) | [x] | orphaned (evidence exists in rollout.md) |
| RWR-04 | Feedback items triaged in rollout.md | MISSING (no VERIFICATION.md) | missing (no SUMMARY) | [x] | orphaned (evidence exists in rollout.md) |
Score: 9/15 requirements fully satisfied (6 satisfied + 3 partial-but-strong NYQ = 9; 3 accepted-RTVAL + 4 orphaned-RWR = 6 gaps)
UIE Requirements (ROADMAP.md only — not in REQUIREMENTS.md)
| REQ-ID | Description | VERIFICATION.md | Status |
|---|---|---|---|
| UIE-01 | Printer edit modal with PATCH route | passed (Phase 11) | satisfied |
| UIE-02 | Dedicated /printers/new page with 303 redirect | passed (Phase 11) | satisfied |
| UIE-03 | Client detail page + clickable client names | passed (Phase 11) | satisfied |
| UIE-04 | Theme toggle with localStorage | passed (Phase 11) | satisfied |
| UIE-05 | FR/EN language toggle with localStorage | passed (Phase 11) | satisfied |
All 5 UIE requirements satisfied. These are outside the REQUIREMENTS.md scope but delivered correctly.
Orphaned Requirements Detail
The following REQ-IDs appear in REQUIREMENTS.md traceability but are absent from ALL phase VERIFICATION.md files:
RWR-01: ImpTune deployed in Docker to real MSP environment
- Evidence available: v1.1-rollout.md sign-off: "✓ ImpTune running in its Docker container (local/internal host)"
- Evidence missing: Referenced DEPLOYMENT.md (
.planning/phases/11-real-world-rollout-feedback/deploy/DEPLOYMENT.md) does not exist - Root cause: Rollout was executed as an operational task, not a GSD plan phase with SUMMARY/VERIFICATION artifacts
RWR-02: Real printer package pushed to endpoints end-to-end
- Evidence available: v1.1-rollout.md sign-off: "✓ Packages pushed end-to-end via Intune and NinjaRMM to real endpoints"
- Evidence missing: Referenced ROLLOUT-RUN.md does not exist
- Root cause: Same as RWR-01
RWR-03: Structured technician feedback captured in v1.1-rollout.md
- Evidence available:
.planning/feedback/v1.1-rollout.mdexists, is signed by "Kawa", lists requirement IDs explicitly - Gap: No phase VERIFICATION.md links to or verifies this document
- Root cause: Document created outside GSD phase execution; Phase 11 VERIFICATION.md covers only UIE requirements
RWR-04: Feedback items triaged in rollout.md
- Evidence available: v1.1-rollout.md triage table present (zero items — no outstanding issues)
- Gap: Same as RWR-03 — no VERIFICATION.md coverage
- Root cause: Same as RWR-03
Cross-Phase Integration
| Check | Status | Detail |
|---|---|---|
| Phase 09 OOB driver select → Phase 11 /printers/new | ⚠️ partial | OOB #printer-form-driver-select swap works correctly. Primary hx-target="#driver-list" points to a hidden div — upload success feedback invisible on /printers/new. Critical user path (dropdown updated, form usable) is intact. |
| Phase 11 PATCH /printers/{id} → all 9 fields preserved | ✅ wired | All form fields including driver FK and client FK are parsed and saved correctly. |
| Phase 12 Alpine i18n store init → /printers/new (Phase 11) | ✅ wired | alpine:init listener runs synchronously before Alpine defer load — x-text bindings on all 13 templates resolve correctly. |
| Phase 09 .ps1 routes → Phase 11 printer_detail.html links | ✅ wired | All three .ps1 URL aliases wired to correct template hrefs in printer_detail.html lines 53–61. |
| Full E2E: upload driver → create printer → download package | ✅ complete | Every step has a live handler. Degraded UX on upload feedback (Finding 1), but no broken flow. |
Nyquist Compliance Discovery
| Phase | VALIDATION.md | nyquist_compliant | wave_0_complete | Status | Action |
|---|---|---|---|---|---|
| 08-nyquist-validation-track | MISSING | N/A | N/A | MISSING | Phase 08 is the Nyquist audit — no self-VALIDATION.md expected |
| 09-ux-tech-debt-closure | EXISTS (09-VALIDATION.md) | true | false | COMPLIANT | — |
| 10-real-world-runtime-validation | RUNTIME-VALIDATION.md (non-standard) | N/A | N/A | MISSING | /gsd:validate-phase 10 |
| 11-ui-enhancements | EXISTS (11-VALIDATION.md) | false | false | PARTIAL | /gsd:validate-phase 11 |
| 12-i18n-bugfixes | MISSING | N/A | N/A | MISSING | /gsd:validate-phase 12 |
Overall: 1/5 compliant, 1/5 partial, 3/5 missing
Tech Debt Register
Phase 10 (RTVAL attestation gaps):
- RTVAL-02: Missing
evidence/rtval-02-install-log.txtandevidence/rtval-02-install-status.png - RTVAL-03: Missing
evidence/rtval-03-detection.pngandevidence/rtval-03-detect-manual.txt - RTVAL-04: Missing
evidence/rtval-04-uninstall-log.txtandevidence/rtval-04-uninstall-status.png - Reviewer explicitly accepted; re-run only if SYSTEM-context install regresses
Phase 11 (validation and documentation):
11-VALIDATION.mdhasnyquist_compliant: false— Nyquist audit not completed for Phase 11- SUMMARY frontmatters for 11-01, 11-02, 11-04 have empty
requirements_completed(UIE-01/02/03 not listed) - Inline driver upload on
/printers/new: OOB primary swap target#driver-listis hidden — upload feedback invisible (dropdown refresh works)
Phase 12:
- No
12-VALIDATION.mdcreated — phase hadRequirements: TBD
Cross-cutting:
- RWR-01..04 delivered operationally, not via GSD plan execution → no VERIFICATION.md coverage
- Referenced deployment artifacts (DEPLOYMENT.md, ROLLOUT-RUN.md) do not exist in repository
Recommendations
For closing the milestone as passed:
Blocker — RWR verification coverage (options, pick one):
- Add RWR-01..04 coverage to Phase 11 VERIFICATION.md (re-open and re-verify, adding a requirements table entry for each RWR ID citing v1.1-rollout.md as evidence)
- OR create a minimal Phase 13 gap-closure plan that formalizes the rollout evidence
Non-blocking items to track:
- RTVAL-02/03/04: Gather 6 evidence files in a single endpoint session when next touching SYSTEM-context install — ~30 minutes total
- Run
/gsd:validate-phase 11and/gsd:validate-phase 12to complete Nyquist validation - Fix hidden
#driver-listtarget on/printers/newinline driver upload (cosmetic UX fix — one-linerstyleremoval ordisplay:blockoverride)
Audit completed: 2026-04-15T14:53:14Z
Auditor: Claude (gsd-verifier via audit-milestone workflow)