- Mark Phase 10 complete in ROADMAP.md (3/3 plans, 2026-04-13) - Create 10-03-report-signoff-SUMMARY.md with attestation-gap closure note - Update STATE.md: plan 10-03 complete, Phase 10 closed, next is phase 8 or 11 - REQUIREMENTS.md RTVAL-01..05 ticks already landed in 10-02 completion commit (idempotent)
5.2 KiB
phase, plan, subsystem, tags, requirements, dependency_graph, tech_stack, key_files, decisions, metrics
| phase | plan | subsystem | tags | requirements | dependency_graph | tech_stack | key_files | decisions | metrics | |||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 10-real-world-runtime-validation | 03 | validation/reporting |
|
|
|
|
|
|
|
Phase 10 Plan 03: Report Sign-off Summary
Finalized RUNTIME-VALIDATION.md, obtained human sign-off with explicit attestation-gap acknowledgement, and flipped Phase 10 tracking docs to complete.
What Was Done
Task 1 — Finalize RUNTIME-VALIDATION.md report body
Completed in the 10-02 → 10-03 handoff window: all RTVAL-01..04 sections carry concrete PASS/FAIL verdicts, evidence links, and notes; top-level Status was flipped to READY FOR SIGN-OFF by the prior agent.
Task 2 — Human review and sign-off (checkpoint)
Reviewer Sébastien QUEROL read the report, acknowledged the attestation-only audit-trail gap for RTVAL-02/03/04, and signed off on 2026-04-13:
- Top-level Status: flipped to
SIGNED OFF - Signed off by: Sébastien QUEROL
- Signed off date: 2026-04-13
- All three sign-off checkboxes ticked
[x] - Reviewer explicitly accepted that only RTVAL-01 is artifact-backed; RTVAL-02/03/04 rest on technician verbal attestation. Compensating controls listed in the report (known device, known tenant, single session, known-good generator) stand in for missing log/screenshot evidence.
Commit: 5685fd9 — docs(phase-10): human sign-off on RUNTIME-VALIDATION.md (attestation gap acknowledged)
Task 3 — Tick requirements, mark Phase 10 complete
.planning/REQUIREMENTS.mdalready had RTVAL-01..05 ticked[x]and the Traceability table showingCompletefor each (landed in the 10-02 completion commit206648c). Idempotent confirmation only — no edits needed..planning/ROADMAP.md:- Phase 10 entry flipped from
[ ]to[x]with(completed 2026-04-13)appended. - Progress table row for Phase 10 set to
v1.1 | 3/3 | Complete | 2026-04-13.
- Phase 10 entry flipped from
Verification
grep "^\*\*Status:\*\* SIGNED OFF" RUNTIME-VALIDATION.md→ hitgrep "Signed off by:\*\* Sébastien QUEROL" RUNTIME-VALIDATION.md→ hit- Zero
Status: PENDINGlines in the report grep "\[x\] \*\*RTVAL-05\*\*" REQUIREMENTS.md→ hitgrep "\[x\] \*\*Phase 10" ROADMAP.md→ hit- ROADMAP.md Progress row for Phase 10 shows
3/3 | Complete | 2026-04-13
All verification checks from the plan pass.
Deviations from Plan
None. Task 3 REQUIREMENTS.md edits were already present from plan 10-02's completion commit, making that step a no-op confirmation rather than a mutation. No deviation rules (1-4) triggered.
Phase 10 Closure Note — Attestation-Only Audit Trail
Phase 10 closes with a structurally weakened runtime audit trail that downstream consumers must be aware of:
- RTVAL-01 (tenant ingestion): PASS, artifact-backed (screenshots + exact .intunewin package committed under
evidence/), re-tested on the fixed build after ISSUE-01 was resolved (commits74535ea+7716246). - RTVAL-02 (install under SYSTEM): PASS, attestation-only — no
IntuneManagementExtension.logexcerpt, no portal screenshot. - RTVAL-03 (detection rule): PASS, attestation-only, 2nd consecutive — no portal screenshot, no manual detect transcript.
- RTVAL-04 (uninstall under SYSTEM): PASS, attestation-only, 3rd consecutive — no uninstall log, no portal screenshot.
RTVAL-02/03/04 together form an attestation-only runtime half for the phase. The user was warned twice during plan 10-02 (on RTVAL-03 and again on RTVAL-04) that consecutive attestation-only checks damage the audit trail, and chose to proceed both times. At sign-off the user again explicitly acknowledged the gap and accepted Phase 10 closure on that basis.
Implication for future work: If a regression, incident, or customer escalation touches SYSTEM-context install, detection, or uninstall, RTVAL-02/03/04 must be treated as soft PASSes — the "it worked once" claim for this build cannot be independently re-derived from evidence files and must be re-validated with full artifact capture. Phase 11 rollout proceeds at the reviewer's risk.
Self-Check: PASSED
- FOUND:
.planning/phases/10-real-world-runtime-validation/RUNTIME-VALIDATION.md(SIGNED OFF) - FOUND:
.planning/phases/10-real-world-runtime-validation/10-03-report-signoff-SUMMARY.md - FOUND: REQUIREMENTS.md RTVAL-01..05 ticked + Traceability Complete
- FOUND: ROADMAP.md Phase 10 ticked with 3/3 Complete 2026-04-13
- FOUND commit:
5685fd9(Task 2 sign-off)