- SUMMARY.md documents all 4 RTVAL runtime checks recorded on rubis.fr / ARES-5CG5220YTM - RTVAL-01 artifact-backed PASS (after fixing HMAC scope + Detection.xml defects) - RTVAL-02/03/04 attestation-only PASSes — three consecutive; user warned twice, approved - SUMMARY.md flags attestation-only audit-trail damage prominently for wave-3 + phase verifiers - STATE.md advanced; next plan is 10-03 (sign-off and phase closure) - ROADMAP.md plan progress updated for phase 10 - REQUIREMENTS.md: RTVAL-01..04 marked complete
93 lines
7.5 KiB
Markdown
93 lines
7.5 KiB
Markdown
---
|
|
gsd_state_version: 1.0
|
|
milestone: v1.1
|
|
milestone_name: Hardening & Validation
|
|
status: in-progress — plan 10-02 COMPLETE; all four RTVAL runtime checks recorded (RTVAL-01 artifact-backed PASS, RTVAL-02/03/04 attestation-only PASSes — 3 consecutive, audit trail weakened); ready for plan 10-03 (sign-off)
|
|
stopped_at: 10-02 complete — next is 10-03 sign-off and phase closure
|
|
last_updated: "2026-04-13T00:00:00.000Z"
|
|
last_activity: 2026-04-13 — Plan 10-02 completed. RTVAL-04 recorded PASS (attestation-only, 3rd consecutive; user warned twice about weakened audit trail and approved). SUMMARY.md created with prominent attestation-only debt section for wave-3 verifier and phase verifier.
|
|
progress:
|
|
total_phases: 4
|
|
completed_phases: 1
|
|
total_plans: 4
|
|
completed_plans: 4
|
|
---
|
|
|
|
# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-04-13 after v1.0 milestone)
|
|
|
|
**Core value:** Generate a complete, working printer deployment package (script + drivers + icon) in minutes instead of manually scripting each printer setup.
|
|
**Current focus:** v1.1 Hardening & Validation — Phase 8 (Nyquist Validation Track)
|
|
|
|
## Current Position
|
|
|
|
Milestone: v1.1 Hardening & Validation
|
|
Phase: 10 — Real-World Runtime Validation
|
|
Plan: 02 COMPLETE — all 4 tasks recorded (RTVAL-01 artifact-backed PASS; RTVAL-02/03/04 attestation-only PASSes, 3 consecutive). Next plan: 10-03 (sign-off and phase closure).
|
|
Status: in-progress — plan 10-02 done, plan 10-03 ready to start
|
|
Decision: Plan 10-02 complete with a structurally weakened runtime audit trail. RTVAL-02/03/04 all accepted as attestation-only PASSes per explicit, repeated user approval. User was warned twice (on RTVAL-03 and again on RTVAL-04) that consecutive attestation-only checks damage the audit trail and chose to proceed both times. Plan 10-03 sign-off must explicitly address whether to re-run RTVAL-02/03/04 with full artifact capture before closing the phase.
|
|
Last activity: 2026-04-13 — RTVAL-04 PASS (attestation-only, commit 2c912ca); plan 10-02 SUMMARY.md created with prominent attestation-only debt section; plan 10-02 closed
|
|
|
|
## Milestone History
|
|
|
|
- **v1.0** — ImpTune MVP (shipped 2026-04-13) — see [MILESTONES.md](MILESTONES.md)
|
|
|
|
## Accumulated Context
|
|
|
|
### v1.1 Phase Structure
|
|
|
|
- Phase 8: Nyquist Validation Track (NYQ-01..03) — parallelizable audit track
|
|
- Phase 9: UX Tech Debt Closure (UX-01..03) — must land before rollout
|
|
- Phase 10: Real-World Runtime Validation (RTVAL-01..05) — must pass before rollout
|
|
- Phase 11: Real-World Rollout & Feedback (RWR-01..04) — depends on Phases 9 + 10
|
|
|
|
### Open Concerns (now owned by v1.1 phases)
|
|
|
|
- Real-world Intune tenant .intunewin acceptance → Phase 10 (RTVAL-01)
|
|
- `pnputil` + `$PSScriptRoot` under SYSTEM → Phase 10 (RTVAL-02..04)
|
|
- Driver dropdown refresh after upload → Phase 9 (UX-01)
|
|
- PRNT-03 Alpine.js port auto-derivation live verification → Phase 9 (UX-02)
|
|
- Individual script download links on printer detail page → Phase 9 (UX-03)
|
|
- Nyquist-compliant VALIDATION.md across v1.0 phases → Phase 8 (NYQ-01..03)
|
|
|
|
### Decisions
|
|
|
|
- **Phase ordering:** RTVAL before RWR (cannot deploy unvalidated runtime); UX before RWR (deployed build must be polished); NYQ parallel to all (pure audit, no code dependency) — placed first so v1.0 validation evidence is fresh before runtime work begins.
|
|
- **RTVAL grouping:** RTVAL-01..05 combined into single Phase 10 because they share setup (same tenant, same test endpoint, same RUNTIME-VALIDATION.md report).
|
|
- **NYQ as dedicated phase:** Kept standalone (not absorbed) because it audits all 7 v1.0 phases and its evidence feeds defect triage into Phases 9/10.
|
|
|
|
Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions archived in `milestones/v1.0-ROADMAP.md`.
|
|
- [Phase 09-ux-tech-debt-closure]: 09-03: .ps1 routes added as aliases (not renames) to preserve backward compatibility
|
|
- [Phase 09-ux-tech-debt-closure]: 09-03: Shared _*_response() helper pattern used for route aliases
|
|
- [Phase 09]: Sentinel field (caller=printer_form) for OOB branching: chosen over HX-Target header for clarity and testability
|
|
- [Phase 09]: HTMX OOB template includes primary fragment + OOB select sibling in driver_upload_with_oob.html
|
|
- [Phase 09-ux-tech-debt-closure]: 09-02: /printers route used for e2e test (full-page with Alpine.js) — no new /printers/new route needed
|
|
- [Phase 09-ux-tech-debt-closure]: 09-02: conftest.py adapted — imptune.config uses string paths, init_db() takes no args
|
|
- [Phase 10-real-world-runtime-validation]: 10-01: Package under test is Ricoh PCL6 Universal Print (Copieur_2eme.intunewin), ImpTune commit 1c3f458, committed to evidence/ for traceability
|
|
- [Phase 10-real-world-runtime-validation]: 10-01: Commit SHA locked before runtime testing — all RTVAL results reference this exact build
|
|
- [Phase 10-real-world-runtime-validation]: 10-02: RTVAL-01 FAIL — Stop plan 10-02; surface .intunewin structure defect as gap; use /gsd:debug on generator or /gsd:plan-phase 10 --gaps before retesting
|
|
- [Phase 10-real-world-runtime-validation]: 10-02: RTVAL-01 PASS on re-test (2026-04-13) — ISSUE-01 resolved by commits 74535ea (HMAC over IV+ciphertext) and 7716246 (Detection.xml alignment with IntuneWinAppUtil.exe reference format); plan resumed at Task 2
|
|
- [Phase 10-real-world-runtime-validation]: 10-02: RTVAL-02 accepted as attestation-only PASS (2026-04-13) — technician verbally confirmed install succeeded on ARES-5CG5220YTM but did NOT provide IntuneManagementExtension.log excerpt or portal screenshot; user explicitly approved "Pass without evidence"; audit trail weakened for this check and flagged in RUNTIME-VALIDATION.md Notes
|
|
- [Phase 10-real-world-runtime-validation]: 10-02: RTVAL-03 accepted as attestation-only PASS (2026-04-13) — second consecutive attestation-only check; no rtval-03-detection.png and no rtval-03-detect-manual.txt captured; user was explicitly warned that a second consecutive attestation-only check further weakens the audit trail and still chose to proceed; flagged in RUNTIME-VALIDATION.md Notes as soft PASS requiring re-run with full artifact capture before phase sign-off
|
|
- [Phase 10-real-world-runtime-validation]: 10-02: RTVAL-04 accepted as attestation-only PASS (2026-04-13) — **third consecutive attestation-only check**; no rtval-04-uninstall-log.txt and no rtval-04-uninstall-status.png captured; user was warned a SECOND time about cumulative audit trail damage and still chose to proceed. Together, RTVAL-02/03/04 constitute an attestation-only runtime half for Phase 10: only RTVAL-01 (tenant ingestion) is artifact-backed. Plan 10-03 sign-off must explicitly address whether to re-run RTVAL-02/03/04 with full evidence before closing the phase.
|
|
- [Phase 10-real-world-runtime-validation]: 10-02: Plan 10-02 COMPLETE (2026-04-13) — SUMMARY.md created with prominent "Attestation-Only Audit Trail Damage" section for the wave-3 verifier and phase verifier
|
|
|
|
### Active Blockers
|
|
|
|
None. BLOCKER-01 resolved 2026-04-13 via commits 74535ea (HMAC over IV+ciphertext) and 7716246 (Detection.xml aligned with IntuneWinAppUtil.exe reference format); RTVAL-01 re-tested PASS on fixed build.
|
|
|
|
### Pending Todos
|
|
|
|
- Run `/gsd:plan-phase 8` to draft plans for Nyquist Validation Track
|
|
- Schedule real Intune tenant + test endpoint access for Phase 10
|
|
- Identify target MSP environment for Phase 11 rollout
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-04-13T00:00:00.000Z
|
|
Stopped at: Completed 10-02-live-intune-runtime-validation-PLAN.md — next is plan 10-03 (sign-off and phase closure)
|
|
Resume file: .planning/phases/10-real-world-runtime-validation/10-03-*-PLAN.md (to be drafted or existing)
|