Files
ImpTune/.planning/ROADMAP.md
T
kawa 1bec899f87 docs(11-04): complete client name navigation plan
- Add 11-04-SUMMARY.md with task results, decision log, self-check passed
- Add deferred-items.md logging pre-existing port_autofill E2E failure
- STATE.md: advance plan, record decisions, update session
- ROADMAP.md: Phase 11 marked 4/4 Complete
2026-04-15 14:54:16 +02:00

9.0 KiB
Raw Blame History

Roadmap: ImpTune

Milestones

  • v1.0 MVP — Phases 17, 13 plans, 27/27 requirements (shipped 2026-04-13) — see milestones/v1.0-ROADMAP.md
  • 🚧 v1.1 Hardening & Validation — Phases 811, 15 requirements + UI enhancements (in progress, started 2026-04-13)

Phases

v1.0 MVP (Phases 17) — SHIPPED 2026-04-13
  • Phase 1: Foundation (3/3 plans) — 2026-04-10
  • Phase 2: Driver Management (2/2 plans) — 2026-04-10
  • Phase 3: Printer Configuration (2/2 plans) — 2026-04-10
  • Phase 4: Script Generation (2/2 plans) — 2026-04-10
  • Phase 5: Package Export (2/2 plans) — 2026-04-10
  • Phase 6: Wire Icon into .intunewin (1/1 plan, gap closure) — 2026-04-10
  • Phase 7: Dashboard & Navigation Polish (1/1 plan, gap closure) — 2026-04-13

Full details: milestones/v1.0-ROADMAP.md

🚧 v1.1 Hardening & Validation (Phases 811)

  • Phase 8: Nyquist Validation Track — Retro-fit Nyquist-compliant VALIDATION.md across all 7 v1.0 phases with evidence-backed checks (completed 2026-04-13)
  • Phase 9: UX Tech Debt Closure — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use (completed 2026-04-13)
  • Phase 10: Real-World Runtime Validation — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint (completed 2026-04-13)
  • Phase 11: UI Enhancements — Add printer edit, separate form from list, clickable client names, dark/light mode toggle, and French/English language switch (completed 2026-04-15)

Phase Details

Phase 8: Nyquist Validation Track

Goal: Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked. Depends on: Nothing (parallelizable — pure audit of shipped code, no runtime dependency) Requirements: NYQ-01, NYQ-02, NYQ-03 Success Criteria (what must be TRUE):

  1. An operator can open any of the 7 v1.0 phase folders and read a VALIDATION.md where every success criterion maps to exactly one observable check with cited evidence (commit, test name, file path, or screenshot)
  2. An operator can open .planning/milestones/v1.0-VALIDATION-INDEX.md and see a single pass/fail roll-up across all 7 phases with links to each phase's validation file
  3. Any validation gap surfaced during the Nyquist pass appears in the index as either a v1.1 defect ticket (linked to the fixing phase) or an explicitly deferred item with written rationale Plans: 8 plans
  • 08-01-PLAN.md — Audit Phase 1 (Foundation) into Nyquist-compliant 01-VALIDATION.md (NYQ-01)
  • 08-02-PLAN.md — Audit Phase 2 (Driver Management) + record POST /drivers/upload 500 gap (NYQ-01)
  • 08-03-PLAN.md — Audit Phase 3 (Printer Configuration) into Nyquist Record (NYQ-01)
  • 08-04-PLAN.md — Audit Phase 4 (Script Generation) with SYSTEM-context attestation notes (NYQ-01)
  • 08-05-PLAN.md — Audit Phase 5 (Package Export) with RTVAL-01 byte-level evidence (NYQ-01)
  • 08-06-PLAN.md — Audit Phase 6 (Wire Icon into .intunewin) into Nyquist Record (NYQ-01)
  • 08-07-PLAN.md — Audit Phase 7 (Dashboard & Nav Polish) into Nyquist Record (NYQ-01)
  • 08-08-PLAN.md — Compile v1.0-VALIDATION-INDEX.md, triage gaps, human sign-off (NYQ-02, NYQ-03)

Phase 9: UX Tech Debt Closure

Goal: The three carried-over UX defects are fixed and live-verified in a real browser so the rolled-out build is the polished one. Depends on: Nothing (independent of validation and rollout — but must complete before Phase 11) Requirements: UX-01, UX-02, UX-03 Success Criteria (what must be TRUE):

  1. A technician uploading a new driver on the printer form sees the new DriverDesc appear in the dropdown without manually reloading the page
  2. A technician typing an IP address into the printer form sees the port field auto-populate via the PRNT-03 Alpine.js handler, observed live in a real browser and recorded in VALIDATION.md
  3. A technician on the printer detail page can click direct download links for the install, uninstall, and detect scripts individually, in addition to the existing package export buttons Plans: 3 plans
  • 09-01-driver-upload-fix-and-inline-oob-PLAN.md — Fix POST /drivers/upload 500 + add inline upload to printer form with HTMX OOB refresh (UX-01)
  • 09-02-playwright-port-autofill-PLAN.md — Add Playwright dev dep + headless test for PRNT-03 IP->port auto-fill (UX-02)
  • 09-03-script-download-links-PLAN.md — Add .ps1 route aliases + printer_detail.html script download links (UX-03)

Phase 10: Real-World Runtime Validation

Goal: Generated .intunewin, install, detect, and uninstall artifacts are proven to work end-to-end on a real Intune tenant against a real Windows endpoint, with evidence recorded. Depends on: Phase 9 (rollout uses the validated-AND-polished build; validation itself only strictly needs v1.0, but running it on the polished build avoids re-doing the pass) Requirements: RTVAL-01, RTVAL-02, RTVAL-03, RTVAL-04, RTVAL-05 Success Criteria (what must be TRUE):

  1. A generated .intunewin package is uploaded to a real Microsoft Intune tenant and accepted without format errors, with the tenant ingestion confirmation captured as evidence
  2. A technician assigning the package to a real Intune-managed Windows endpoint observes the install script succeed under SYSTEM context, with pnputil driver staging and $PSScriptRoot path resolution verified in the device log
  3. After install, the Intune detection rule driven by the generated detect script reports "installed" for the endpoint
  4. A technician triggering uninstall from Intune sees the printer cleanly removed from the endpoint under SYSTEM context
  5. A reviewer can open RUNTIME-VALIDATION.md and read a signed-off report listing tenant, device, OS build, driver vendor(s), screenshots/logs, and any issues found Plans: 3 plans
  • 10-01-preflight-package-and-scaffold-PLAN.md — Generate real .intunewin from current commit and scaffold RUNTIME-VALIDATION.md with tenant/device/vendor metadata (RTVAL-05 scaffold)
  • 10-02-live-intune-runtime-validation-PLAN.md — Drive RTVAL-01..04 manual checkpoints against a live Intune tenant + real Windows endpoint, capturing screenshots and device logs as evidence
  • 10-03-report-signoff-PLAN.md — Finalize RUNTIME-VALIDATION.md, human sign-off, tick RTVAL-01..05 and mark Phase 10 complete

Phase 11: UI Enhancements

Goal: Improve the daily usability of ImpTune with printer editing, better form/list layout, client-scoped navigation, dark/light theme, and bilingual (FR/EN) support. Depends on: Phase 9 (polished base build), Phase 10 (runtime validation passed) Requirements: UIE-01, UIE-02, UIE-03, UIE-04, UIE-05 Success Criteria (what must be TRUE):

  1. Every printer in the list has an Edit button that opens a pre-filled form and saves changes in-place without losing other printer data
  2. The new-printer form is visually separated from the printer list (distinct section, card, or page) so adding a printer doesn't feel buried in the list
  3. Every client name in the interface is a clickable link that navigates to a filtered page showing only that client's printers
  4. A toggle lets the user switch between Dark mode, Light mode, and Follow system — the chosen preference persists across page reloads
  5. A toggle lets the user switch the UI language between French and English — all labels, buttons, and messages update immediately and the choice persists Plans: 4 plans
  • 11-01-PLAN.md — Wave 0 test scaffolds + UIE-02: dedicated /printers/new page + POST redirect (UIE-02)
  • 11-02-PLAN.md — Printer edit modal: PATCH /printers/{id} + native dialog + Edit button per row (UIE-01)
  • 11-03-PLAN.md — Theme toggle + FR/EN language toggle in base.html via Alpine.js stores (UIE-04, UIE-05)
  • 11-04-PLAN.md — Client detail page /clients/{id} + clickable client names everywhere (UIE-03)

Progress

Phase Milestone Plans Complete Status Completed
1. Foundation v1.0 3/3 Complete 2026-04-10
2. Driver Management v1.0 2/2 Complete 2026-04-10
3. Printer Configuration v1.0 2/2 Complete 2026-04-10
4. Script Generation v1.0 2/2 Complete 2026-04-10
5. Package Export v1.0 2/2 Complete 2026-04-10
6. Wire Icon into .intunewin v1.0 1/1 Complete 2026-04-10
7. Dashboard & Nav Polish v1.0 1/1 Complete 2026-04-13
8. Nyquist Validation Track v1.1 8/8 Complete 2026-04-13
9. UX Tech Debt Closure 3/3 Complete 2026-04-13 2026-04-13
10. Real-World Runtime Validation v1.1 3/3 Complete 2026-04-13
11. UI Enhancements 4/4 Complete 2026-04-15