95 lines
6.5 KiB
Markdown
95 lines
6.5 KiB
Markdown
---
|
||
phase: 08-nyquist-validation-track
|
||
plan: 08
|
||
subsystem: validation-rollup
|
||
tags: [nyquist, validation, milestone, sign-off, v1.0-audit]
|
||
requires:
|
||
- .planning/phases/01-foundation/01-VALIDATION.md
|
||
- .planning/phases/02-driver-management/02-VALIDATION.md
|
||
- .planning/phases/03-printer-configuration/03-VALIDATION.md
|
||
- .planning/phases/04-script-generation/04-VALIDATION.md
|
||
- .planning/phases/05-package-export/05-VALIDATION.md
|
||
- .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||
- .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||
provides:
|
||
- .planning/milestones/v1.0-VALIDATION-INDEX.md (signed-off)
|
||
- REQUIREMENTS.md NYQ-01/02/03 complete
|
||
affects:
|
||
- .planning/REQUIREMENTS.md
|
||
- all 7 per-phase VALIDATION.md sign-off blocks
|
||
tech_stack:
|
||
added: []
|
||
patterns:
|
||
- flat-greppable-rollup-table
|
||
- bidirectional-citation-loop
|
||
- historical-gap-closed-in-place
|
||
key_files:
|
||
created:
|
||
- .planning/milestones/v1.0-VALIDATION-INDEX.md
|
||
- .planning/phases/08-nyquist-validation-track/08-08-SUMMARY.md
|
||
modified:
|
||
- .planning/phases/01-foundation/01-VALIDATION.md
|
||
- .planning/phases/02-driver-management/02-VALIDATION.md
|
||
- .planning/phases/03-printer-configuration/03-VALIDATION.md
|
||
- .planning/phases/04-script-generation/04-VALIDATION.md
|
||
- .planning/phases/05-package-export/05-VALIDATION.md
|
||
- .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||
- .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||
- .planning/REQUIREMENTS.md
|
||
decisions:
|
||
- NYQ-02/03 closed with 45/45 pass, zero fail-fix-v1.1 rows (all historical gaps closed in place via fixing phases 6/9/10)
|
||
- Phase 4 attestation-only audit gap acknowledged as known-weakness handed to Phase 11 rollout, not re-opened as fail-fix (already acknowledged in plan 10-03 sign-off)
|
||
- Index frontmatter flipped draft → signed-off with signer recorded in-file
|
||
metrics:
|
||
duration_minutes: 5
|
||
tasks_completed: 3
|
||
files_modified: 9
|
||
completed_date: 2026-04-13
|
||
---
|
||
|
||
# Phase 8 Plan 08: v1.0 Validation Index Rollup & Sign-Off Summary
|
||
|
||
Aggregated all 7 per-phase Nyquist Records into a single flat 45-row rollup index, obtained human sign-off from Sébastien QUEROL, replicated the sign-off into every per-phase VALIDATION.md, and closed NYQ-01/02/03 in REQUIREMENTS.md — formally closing Phase 8 and the v1.1 Nyquist Validation Track.
|
||
|
||
## What Was Built
|
||
|
||
- **`.planning/milestones/v1.0-VALIDATION-INDEX.md`** — single flat pass/fail rollup with one row per v1.0 success criterion (45 rows: 14 + 6 + 10 + 5 + 5 + 1 + 4 across Phases 1–7). Each row cites evidence as a markdown link into the per-phase `NN-VALIDATION.md#nyquist-record`. Gap Validation Block confirms every fixing-phase citation against REQUIREMENTS.md and SUMMARY.md files. Attestation-Gap Residual Risk block captures the Phase 4 runtime-half weakness as a known rollout concern rather than a fail-fix row.
|
||
- **7 per-phase VALIDATION.md sign-off blocks** — all now carry `- [x] Nyquist audit complete — 2026-04-13 — Sébastien QUEROL` mirroring the index, and `**Approval:**` line upgraded from `pending` (phases 1–5) / audit-only (phases 6–7) to full human-signed-off text with back-link to the index.
|
||
- **REQUIREMENTS.md** — NYQ-02 and NYQ-03 flipped `[ ] → [x]`, Traceability table rows Pending → Complete. NYQ-01 was already Complete from plans 08-01..08-07.
|
||
|
||
## Tasks Completed
|
||
|
||
| Task | Description | Commit |
|
||
| ---- | --------------------------------------------------------------------------- | ------ |
|
||
| 1 | Compile `v1.0-VALIDATION-INDEX.md` rollup (45/45 pass, draft, tally block) | 192a64d |
|
||
| 2 | Human sign-off checkpoint | — (approval: Sébastien QUEROL 2026-04-13) |
|
||
| 3 | Flip index to signed-off, tick 7 per-phase sign-offs, tick NYQ-02/03 | (this commit) |
|
||
|
||
## Key Decisions
|
||
|
||
1. **Zero fail-fix-v1.1 rows.** Every historical gap across the 7-phase track was already closed in place via fixing phases (Phase 6 icon embedding, Phase 9 UX-01/02/03, Phase 10 RTVAL-01). Gap Validation Block in the index cross-checks all 5 historical-gap rows against REQUIREMENTS.md and fixing-phase SUMMARY.md files — all confirmed.
|
||
2. **Phase 4 attestation-only runtime half is NOT reopened.** RTVAL-02/03/04 attestation-only PASSes (per STATE.md 2026-04-13 and plan 10-03 sign-off commit cd2df1e) are recorded in the Attestation-Gap Residual Risk block as a known weakness owned by Phase 11 rollout for artifact re-capture. Reopening as fail-fix would contradict the already-shipped plan 10-03 sign-off.
|
||
3. **Bidirectional closure loop** between `05-VALIDATION row 4` and `06-VALIDATION row 1` (PKG-04 icon embedding) preserved and flagged as a replicable pattern for future gap-closure phases.
|
||
4. **Sign-off replicated, not centralized.** Each per-phase VALIDATION.md carries its own dated sign-off line back-linking to `v1.0-VALIDATION-INDEX.md` — greppable from either direction.
|
||
|
||
## Deviations from Plan
|
||
|
||
None — plan executed exactly as written. Frontmatter `nyquist_compliant: true` was already set in all 7 phase files by prior plans 08-01..08-07; Task 3 step 2 consistency-check confirmed this and only the sign-off line + Approval text required edits. Phases 5 and 6 had already ticked the `nyquist_compliant:` checkbox in the Validation Sign-Off block; Phases 1–4 and 7 had not — all now ticked.
|
||
|
||
## Success Criteria — Final State
|
||
|
||
1. **NYQ-01 satisfied** — all 7 v1.0 phases have Nyquist-compliant VALIDATION.md (already ticked; confirmed here)
|
||
2. **NYQ-02 satisfied** — single flat pass/fail rollup at `.planning/milestones/v1.0-VALIDATION-INDEX.md`, signed off
|
||
3. **NYQ-03 satisfied** — every gap linked to a fixing phase (5 historical-gap rows, all verified) or explicitly deferred with rationale (Phase 4 attestation-only rows in Residual Risk block)
|
||
4. **Human sign-off recorded** in both the index frontmatter + sign-off line and each of the 7 per-phase VALIDATION.md Approval blocks
|
||
|
||
Phase 8 is now formally closed. v1.1 Nyquist Validation Track complete. All remaining v1.1 phases (9, 10, 11) were already closed prior to this plan per STATE.md.
|
||
|
||
## Self-Check: PASSED
|
||
|
||
- File `.planning/milestones/v1.0-VALIDATION-INDEX.md` exists and frontmatter shows `status: signed-off`
|
||
- Sign-off line ticked: `- [x] Nyquist audit complete — 2026-04-13 — Sébastien QUEROL`
|
||
- All 7 per-phase VALIDATION.md files carry matching dated sign-off lines
|
||
- REQUIREMENTS.md NYQ-01/02/03 all `[x]`, Traceability rows all Complete
|
||
- Prior commit `192a64d` verified present in git log
|