docs(08-08): complete v1.0 validation index rollup plan
- Create 08-08-SUMMARY.md (Phase 8 closure, NYQ track complete) - Advance STATE.md (Phase 8 ready_for_verification, 27/30 plans complete) - Update ROADMAP.md Phase 8 progress to 8/8 Complete
This commit is contained in:
+7
-6
@@ -4,14 +4,14 @@ milestone: v1.1
|
||||
milestone_name: Hardening & Validation
|
||||
current_plan: 8
|
||||
status: completed
|
||||
stopped_at: Completed 08-07-PLAN.md (Phase 7 Nyquist audit)
|
||||
last_updated: "2026-04-13T14:20:27.138Z"
|
||||
stopped_at: Completed 08-08-PLAN.md (Phase 8 closed)
|
||||
last_updated: "2026-04-13T14:35:55.253Z"
|
||||
last_activity: 2026-04-13
|
||||
progress:
|
||||
total_phases: 4
|
||||
completed_phases: 2
|
||||
completed_phases: 3
|
||||
total_plans: 17
|
||||
completed_plans: 13
|
||||
completed_plans: 14
|
||||
---
|
||||
|
||||
# Project State
|
||||
@@ -84,6 +84,7 @@ Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions ar
|
||||
- [Phase 08-nyquist-validation-track]: 08-05: Phase 5 Nyquist Record complete with 5/5 pass rows; PKG-02 row is the ONLY artifact-backed live-tenant runtime row in the 7-phase audit track (cites RTVAL-01 PASS on rubis.fr + fix commits 74535ea/7716246); PKG-04 icon-embedding historical gap closed in place via Phase 6 TestIntunewinIconInclusion
|
||||
- [Phase 08-nyquist-validation-track]: 08-06: Phase 6 Nyquist Record complete with 1/1 pass row (PKG-04 icon embedding); shortest audit in track reflecting single-criterion gap-closure structure; bidirectional citation loop with 05-VALIDATION row 4; RTVAL-01 cited as supporting transitive runtime evidence
|
||||
- [Phase 08-nyquist-validation-track]: 08-07: Phase 7 Nyquist Record complete with 4/4 pass (3 in-scope rows anchored to 07-VERIFICATION.md truths since Phase 7 has zero REQUIREMENTS.md IDs, plus 1 UX-03 carry-over row closed via Phase 9 / 09-03); per-phase NYQ-01 coverage complete across all 7 v1.0 phases (45 audit rows total, 0 roll-forward)
|
||||
- [Phase 08-nyquist-validation-track]: 08-08: v1.0-VALIDATION-INDEX.md signed off 2026-04-13 by Sébastien QUEROL; 45/45 pass across 7 phases, 0 fail-fix-v1.1; NYQ-01/02/03 Complete; Phase 4 attestation-only runtime gap recorded as residual risk owned by Phase 11 rollout (not reopened)
|
||||
|
||||
### Active Blockers
|
||||
|
||||
@@ -97,6 +98,6 @@ None. BLOCKER-01 resolved 2026-04-13 via commits 74535ea (HMAC over IV+ciphertex
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-04-13T14:20:27.131Z
|
||||
Stopped at: Completed 08-07-PLAN.md (Phase 7 Nyquist audit)
|
||||
Last session: 2026-04-13T14:35:55.248Z
|
||||
Stopped at: Completed 08-08-PLAN.md (Phase 8 closed)
|
||||
Resume file: None
|
||||
|
||||
@@ -0,0 +1,94 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 08
|
||||
subsystem: validation-rollup
|
||||
tags: [nyquist, validation, milestone, sign-off, v1.0-audit]
|
||||
requires:
|
||||
- .planning/phases/01-foundation/01-VALIDATION.md
|
||||
- .planning/phases/02-driver-management/02-VALIDATION.md
|
||||
- .planning/phases/03-printer-configuration/03-VALIDATION.md
|
||||
- .planning/phases/04-script-generation/04-VALIDATION.md
|
||||
- .planning/phases/05-package-export/05-VALIDATION.md
|
||||
- .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||||
- .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||||
provides:
|
||||
- .planning/milestones/v1.0-VALIDATION-INDEX.md (signed-off)
|
||||
- REQUIREMENTS.md NYQ-01/02/03 complete
|
||||
affects:
|
||||
- .planning/REQUIREMENTS.md
|
||||
- all 7 per-phase VALIDATION.md sign-off blocks
|
||||
tech_stack:
|
||||
added: []
|
||||
patterns:
|
||||
- flat-greppable-rollup-table
|
||||
- bidirectional-citation-loop
|
||||
- historical-gap-closed-in-place
|
||||
key_files:
|
||||
created:
|
||||
- .planning/milestones/v1.0-VALIDATION-INDEX.md
|
||||
- .planning/phases/08-nyquist-validation-track/08-08-SUMMARY.md
|
||||
modified:
|
||||
- .planning/phases/01-foundation/01-VALIDATION.md
|
||||
- .planning/phases/02-driver-management/02-VALIDATION.md
|
||||
- .planning/phases/03-printer-configuration/03-VALIDATION.md
|
||||
- .planning/phases/04-script-generation/04-VALIDATION.md
|
||||
- .planning/phases/05-package-export/05-VALIDATION.md
|
||||
- .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||||
- .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||||
- .planning/REQUIREMENTS.md
|
||||
decisions:
|
||||
- NYQ-02/03 closed with 45/45 pass, zero fail-fix-v1.1 rows (all historical gaps closed in place via fixing phases 6/9/10)
|
||||
- Phase 4 attestation-only audit gap acknowledged as known-weakness handed to Phase 11 rollout, not re-opened as fail-fix (already acknowledged in plan 10-03 sign-off)
|
||||
- Index frontmatter flipped draft → signed-off with signer recorded in-file
|
||||
metrics:
|
||||
duration_minutes: 5
|
||||
tasks_completed: 3
|
||||
files_modified: 9
|
||||
completed_date: 2026-04-13
|
||||
---
|
||||
|
||||
# Phase 8 Plan 08: v1.0 Validation Index Rollup & Sign-Off Summary
|
||||
|
||||
Aggregated all 7 per-phase Nyquist Records into a single flat 45-row rollup index, obtained human sign-off from Sébastien QUEROL, replicated the sign-off into every per-phase VALIDATION.md, and closed NYQ-01/02/03 in REQUIREMENTS.md — formally closing Phase 8 and the v1.1 Nyquist Validation Track.
|
||||
|
||||
## What Was Built
|
||||
|
||||
- **`.planning/milestones/v1.0-VALIDATION-INDEX.md`** — single flat pass/fail rollup with one row per v1.0 success criterion (45 rows: 14 + 6 + 10 + 5 + 5 + 1 + 4 across Phases 1–7). Each row cites evidence as a markdown link into the per-phase `NN-VALIDATION.md#nyquist-record`. Gap Validation Block confirms every fixing-phase citation against REQUIREMENTS.md and SUMMARY.md files. Attestation-Gap Residual Risk block captures the Phase 4 runtime-half weakness as a known rollout concern rather than a fail-fix row.
|
||||
- **7 per-phase VALIDATION.md sign-off blocks** — all now carry `- [x] Nyquist audit complete — 2026-04-13 — Sébastien QUEROL` mirroring the index, and `**Approval:**` line upgraded from `pending` (phases 1–5) / audit-only (phases 6–7) to full human-signed-off text with back-link to the index.
|
||||
- **REQUIREMENTS.md** — NYQ-02 and NYQ-03 flipped `[ ] → [x]`, Traceability table rows Pending → Complete. NYQ-01 was already Complete from plans 08-01..08-07.
|
||||
|
||||
## Tasks Completed
|
||||
|
||||
| Task | Description | Commit |
|
||||
| ---- | --------------------------------------------------------------------------- | ------ |
|
||||
| 1 | Compile `v1.0-VALIDATION-INDEX.md` rollup (45/45 pass, draft, tally block) | 192a64d |
|
||||
| 2 | Human sign-off checkpoint | — (approval: Sébastien QUEROL 2026-04-13) |
|
||||
| 3 | Flip index to signed-off, tick 7 per-phase sign-offs, tick NYQ-02/03 | (this commit) |
|
||||
|
||||
## Key Decisions
|
||||
|
||||
1. **Zero fail-fix-v1.1 rows.** Every historical gap across the 7-phase track was already closed in place via fixing phases (Phase 6 icon embedding, Phase 9 UX-01/02/03, Phase 10 RTVAL-01). Gap Validation Block in the index cross-checks all 5 historical-gap rows against REQUIREMENTS.md and fixing-phase SUMMARY.md files — all confirmed.
|
||||
2. **Phase 4 attestation-only runtime half is NOT reopened.** RTVAL-02/03/04 attestation-only PASSes (per STATE.md 2026-04-13 and plan 10-03 sign-off commit cd2df1e) are recorded in the Attestation-Gap Residual Risk block as a known weakness owned by Phase 11 rollout for artifact re-capture. Reopening as fail-fix would contradict the already-shipped plan 10-03 sign-off.
|
||||
3. **Bidirectional closure loop** between `05-VALIDATION row 4` and `06-VALIDATION row 1` (PKG-04 icon embedding) preserved and flagged as a replicable pattern for future gap-closure phases.
|
||||
4. **Sign-off replicated, not centralized.** Each per-phase VALIDATION.md carries its own dated sign-off line back-linking to `v1.0-VALIDATION-INDEX.md` — greppable from either direction.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None — plan executed exactly as written. Frontmatter `nyquist_compliant: true` was already set in all 7 phase files by prior plans 08-01..08-07; Task 3 step 2 consistency-check confirmed this and only the sign-off line + Approval text required edits. Phases 5 and 6 had already ticked the `nyquist_compliant:` checkbox in the Validation Sign-Off block; Phases 1–4 and 7 had not — all now ticked.
|
||||
|
||||
## Success Criteria — Final State
|
||||
|
||||
1. **NYQ-01 satisfied** — all 7 v1.0 phases have Nyquist-compliant VALIDATION.md (already ticked; confirmed here)
|
||||
2. **NYQ-02 satisfied** — single flat pass/fail rollup at `.planning/milestones/v1.0-VALIDATION-INDEX.md`, signed off
|
||||
3. **NYQ-03 satisfied** — every gap linked to a fixing phase (5 historical-gap rows, all verified) or explicitly deferred with rationale (Phase 4 attestation-only rows in Residual Risk block)
|
||||
4. **Human sign-off recorded** in both the index frontmatter + sign-off line and each of the 7 per-phase VALIDATION.md Approval blocks
|
||||
|
||||
Phase 8 is now formally closed. v1.1 Nyquist Validation Track complete. All remaining v1.1 phases (9, 10, 11) were already closed prior to this plan per STATE.md.
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- File `.planning/milestones/v1.0-VALIDATION-INDEX.md` exists and frontmatter shows `status: signed-off`
|
||||
- Sign-off line ticked: `- [x] Nyquist audit complete — 2026-04-13 — Sébastien QUEROL`
|
||||
- All 7 per-phase VALIDATION.md files carry matching dated sign-off lines
|
||||
- REQUIREMENTS.md NYQ-01/02/03 all `[x]`, Traceability rows all Complete
|
||||
- Prior commit `192a64d` verified present in git log
|
||||
Reference in New Issue
Block a user