Commit initial
This commit is contained in:
@@ -0,0 +1,108 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 01
|
||||
type: execute
|
||||
wave: 1
|
||||
depends_on: []
|
||||
files_modified:
|
||||
- .planning/phases/01-foundation/01-VALIDATION.md
|
||||
autonomous: true
|
||||
requirements: [NYQ-01]
|
||||
must_haves:
|
||||
truths:
|
||||
- "Phase 1 VALIDATION.md contains a Nyquist Record with exactly one observable check per Phase 1 success criterion"
|
||||
- "Every Phase 1 Nyquist Record row cites evidence (test + file:line, commit SHA + file:line, artifact path, or dated VERIFICATION.md link)"
|
||||
- "Phase 1 frontmatter nyquist_compliant flag correctly reflects audit outcome"
|
||||
- "Gaps surfaced for Phase 1 (e.g. upload-to-real-Intune spike) are marked status=fail-fix-v1.1 with link to fixing phase, or deferred with rationale"
|
||||
artifacts:
|
||||
- path: ".planning/phases/01-foundation/01-VALIDATION.md"
|
||||
provides: "Phase 1 Nyquist Record table + updated frontmatter"
|
||||
contains: "## Nyquist Record"
|
||||
key_links:
|
||||
- from: ".planning/phases/01-foundation/01-VALIDATION.md"
|
||||
to: ".planning/milestones/v1.0-ROADMAP.md"
|
||||
via: "one row per Phase 1 success criterion"
|
||||
pattern: "## Nyquist Record"
|
||||
- from: ".planning/phases/01-foundation/01-VALIDATION.md gap rows"
|
||||
to: ".planning/phases/10-real-world-runtime-validation"
|
||||
via: "fail-fix-v1.1 link for upload-to-real-Intune spike"
|
||||
pattern: "fail-fix-v1.1.*RTVAL-01|Phase 10"
|
||||
---
|
||||
|
||||
<objective>
|
||||
Audit Phase 1 (Foundation) against Nyquist rules: every success criterion maps to exactly one observable check with cited evidence. Upgrade `01-VALIDATION.md` in place by adding a `## Nyquist Record` section and updating frontmatter.
|
||||
|
||||
Purpose: First of 7 per-phase audits that feed the v1.0-VALIDATION-INDEX.md rollup (NYQ-02) and gap triage (NYQ-03).
|
||||
Output: Upgraded `.planning/phases/01-foundation/01-VALIDATION.md` with Nyquist Record + audited frontmatter.
|
||||
</objective>
|
||||
|
||||
<execution_context>
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/workflows/execute-plan.md
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/templates/summary.md
|
||||
</execution_context>
|
||||
|
||||
<context>
|
||||
@.planning/PROJECT.md
|
||||
@.planning/ROADMAP.md
|
||||
@.planning/STATE.md
|
||||
@.planning/REQUIREMENTS.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-CONTEXT.md
|
||||
@.planning/milestones/v1.0-ROADMAP.md
|
||||
@.planning/phases/01-foundation/01-VALIDATION.md
|
||||
@.planning/phases/01-foundation/01-VERIFICATION.md
|
||||
@.planning/phases/01-foundation/01-01-SUMMARY.md
|
||||
@.planning/phases/01-foundation/01-02-SUMMARY.md
|
||||
@.planning/phases/01-foundation/01-03-SUMMARY.md
|
||||
</context>
|
||||
|
||||
<tasks>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 1: Build Phase 1 Nyquist Record and upgrade 01-VALIDATION.md</name>
|
||||
<files>.planning/phases/01-foundation/01-VALIDATION.md</files>
|
||||
<action>
|
||||
1. Read `.planning/milestones/v1.0-ROADMAP.md` and extract the full success-criterion list for Phase 1 (Foundation). These are the canonical rows (NOT the v1.1 ROADMAP.md view).
|
||||
2. For each success criterion, derive exactly ONE observable check. No hand-wavy "code looks right". Observable means: runs a test, greps a file, reads an artifact, or confirms a dated manual verification.
|
||||
3. For each observable check, locate evidence in priority order:
|
||||
a) Test evidence: `pytest <path>::<testname>` + file:line (trust recorded-green runs; do NOT re-run)
|
||||
b) Commit evidence: commit SHA + file:line (use `git log` + `git blame` as needed)
|
||||
c) File-artifact evidence: path to generated artifact
|
||||
d) Manual-check evidence: link to dated note in 01-VERIFICATION.md (ONLY if no automated path)
|
||||
4. Preserve ALL existing sections of 01-VALIDATION.md verbatim (Sampling Rate, Per-Task Verification Map, Wave 0 Requirements, Manual-Only Verifications, Validation Sign-Off). Do NOT delete historical record.
|
||||
5. Append a new top-level section `## Nyquist Record` ABOVE the Validation Sign-Off section with a table:
|
||||
`| # | Success Criterion | Observable Check | Evidence | Status | Notes |`
|
||||
Status values: `pass`, `fail-fix-v1.1`, `deferred-v1.2`, `wont-do`.
|
||||
Any `fail-fix-v1.1` row MUST cite the fixing phase (Phase 9/10/11) in the Notes column.
|
||||
Any `deferred-v1.2` / `wont-do` row MUST have written rationale in Notes.
|
||||
6. Known Phase 1 gap: the Manual-Only "Upload to real Intune tenant" row from existing 01-VALIDATION.md is a spike. Record as `fail-fix-v1.1` linking to Phase 10 / RTVAL-01 (which is now Complete per REQUIREMENTS.md) — so this can likely resolve to `pass` citing the Phase 10 RUNTIME-VALIDATION.md signoff. Auditor decides at audit time.
|
||||
7. Update frontmatter:
|
||||
- Set `nyquist_compliant: true` ONLY if every Nyquist Record row is `pass` or explicit-deferred. Otherwise leave `false` and the index plan (08-08) will confirm rollup.
|
||||
- Add `nyquist_audited: 2026-04-13` (or date of audit run).
|
||||
- Add `nyquist_auditor: Sébastien QUEROL` (or agent-recorded value; CONTEXT says Claude has discretion on wording).
|
||||
8. Do NOT touch source code. This plan writes only to `.planning/phases/01-foundation/01-VALIDATION.md`.
|
||||
</action>
|
||||
<verify>
|
||||
<automated>grep -q "^## Nyquist Record" .planning/phases/01-foundation/01-VALIDATION.md && grep -q "nyquist_audited:" .planning/phases/01-foundation/01-VALIDATION.md</automated>
|
||||
</verify>
|
||||
<done>
|
||||
01-VALIDATION.md contains a `## Nyquist Record` table with one row per Phase 1 success criterion (per milestones/v1.0-ROADMAP.md), every row has an Observable Check and cited Evidence, frontmatter has nyquist_audited date + auditor name, and any fail-fix-v1.1 row links to the fixing phase.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
</tasks>
|
||||
|
||||
<verification>
|
||||
- `## Nyquist Record` section exists in 01-VALIDATION.md
|
||||
- Row count matches Phase 1 success criteria count from milestones/v1.0-ROADMAP.md
|
||||
- Every row has non-empty Observable Check + Evidence cells
|
||||
- No row has status outside {pass, fail-fix-v1.1, deferred-v1.2, wont-do}
|
||||
- Frontmatter has nyquist_audited + nyquist_auditor keys
|
||||
</verification>
|
||||
|
||||
<success_criteria>
|
||||
Phase 1 Nyquist audit complete: 01-VALIDATION.md upgraded in place with a Nyquist Record where every success criterion has one observable check with cited evidence; gaps tracked with links to fixing phases.
|
||||
</success_criteria>
|
||||
|
||||
<output>
|
||||
After completion, create `.planning/phases/08-nyquist-validation-track/08-01-SUMMARY.md`
|
||||
</output>
|
||||
@@ -0,0 +1,85 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 01
|
||||
subsystem: validation-audit
|
||||
tags: [nyquist, audit, phase-1, validation]
|
||||
requires: []
|
||||
provides:
|
||||
- "Phase 1 Nyquist Record (14 rows, all pass) in .planning/phases/01-foundation/01-VALIDATION.md"
|
||||
- "Phase 1 nyquist_compliant=true audited 2026-04-13"
|
||||
affects:
|
||||
- .planning/phases/01-foundation/01-VALIDATION.md
|
||||
tech_stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Nyquist Record audit table: # | Criterion | Observable Check | Evidence | Status | Notes"
|
||||
key_files:
|
||||
created: []
|
||||
modified:
|
||||
- .planning/phases/01-foundation/01-VALIDATION.md
|
||||
decisions:
|
||||
- "Derived 14 success criteria from v1.0-ROADMAP.md Phase 1 goal + plan outcomes (no explicit SC list in ROADMAP). Cross-checked 1:1 against 01-VERIFICATION.md's 13 observable truths and added row 14 for the real-Intune tenant spike."
|
||||
- "Row 14 (upload-to-real-Intune) resolved PASS rather than fail-fix-v1.1: Phase 10 RTVAL-01 was re-tested and signed off 2026-04-13 (artifact evidence), so the spike is closed."
|
||||
- "nyquist_compliant flipped to true because all 14 rows are pass; no deferred/wont-do/fail rows."
|
||||
metrics:
|
||||
tasks_completed: 1
|
||||
tasks_total: 1
|
||||
duration_minutes: 5
|
||||
completed_date: 2026-04-13
|
||||
requirements_completed: [NYQ-01]
|
||||
---
|
||||
|
||||
# Phase 08 Plan 01: Phase 1 Nyquist Audit Summary
|
||||
|
||||
**One-liner:** Audited Phase 1 (Foundation) against Nyquist rules and upgraded `01-VALIDATION.md` in place with a 14-row Nyquist Record where every success criterion maps to exactly one observable check with committed evidence.
|
||||
|
||||
## What Shipped
|
||||
|
||||
- `.planning/phases/01-foundation/01-VALIDATION.md` now contains a `## Nyquist Record` section (placed above Validation Sign-Off, below Manual-Only Verifications).
|
||||
- 14 rows, one per Phase 1 success criterion derived from `milestones/v1.0-ROADMAP.md` Phase 1 goal + the outcomes of plans 01-01, 01-02, 01-03.
|
||||
- Every row has a non-empty Observable Check cell (pytest invocation, grep, or dated VERIFICATION.md reference) and a non-empty Evidence cell citing committed tests, source `file:line`, commit SHAs, or 01-VERIFICATION.md rows.
|
||||
- Row 14 is the former "Upload to real Intune tenant" spike that lived in the Manual-Only Verifications table — now closed as `pass` citing Phase 10 RTVAL-01 re-test sign-off (2026-04-13).
|
||||
- Frontmatter updated: `nyquist_compliant: true`, `nyquist_audited: 2026-04-13`, `nyquist_auditor: Claude (gsd-executor, plan 08-01)`.
|
||||
- All historical sections (Test Infrastructure, Sampling Rate, Per-Task Verification Map, Wave 0 Requirements, Manual-Only Verifications, Validation Sign-Off) preserved verbatim.
|
||||
|
||||
## Audit Outcome
|
||||
|
||||
| Status | Count |
|
||||
|--------|-------|
|
||||
| pass | 14 |
|
||||
| fail-fix-v1.1 | 0 |
|
||||
| deferred-v1.2 | 0 |
|
||||
| wont-do | 0 |
|
||||
|
||||
Phase 1 is Nyquist-compliant. Zero gaps carry forward into 08-08 (rollup).
|
||||
|
||||
## Evidence Strategy Used
|
||||
|
||||
Priority order from the plan was honored:
|
||||
1. **Test evidence** (preferred): used for 10/14 rows — `tests/test_health.py`, `tests/test_static.py`, `tests/test_db.py` (4 tests), `tests/test_intunewin.py` (8 tests).
|
||||
2. **File-line / commit evidence**: used for Dockerfile rows (rows 2, 5), `base.html` nav sidebar (row 4), and `database.py` / `docker-compose.yml` wiring (row 8). Commits cited include 34c7cb3, 88d9c5f, 25f82e6, 74535ea, 7716246.
|
||||
3. **Dated manual-check evidence**: row 14 cites Phase 10 `RUNTIME-VALIDATION.md` RTVAL-01 PASS (2026-04-13) and the committed evidence artifact `evidence/Copieur_2eme.intunewin`.
|
||||
|
||||
No row relied on "code looks right" — every check is observable.
|
||||
|
||||
## Cross-Reference with 01-VERIFICATION.md
|
||||
|
||||
`01-VERIFICATION.md` (dated 2026-04-10) already enumerated 13 observable truths grouped by sub-plan. The Nyquist Record adopts those 13 as rows 1–13 with their exact evidence and adds row 14 for the runtime upload gate. This keeps the two documents 1:1 alignable: rows 1–13 of Nyquist Record = truths 1–13 of 01-VERIFICATION.md.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
**None.** Plan 08-01 executed exactly as written. Single task, single file edit.
|
||||
|
||||
Minor interpretive choice (within plan latitude): row 14 was originally expected to be `fail-fix-v1.1` at audit time per the plan's Task 1 step 6. However, because Phase 10 RTVAL-01 is already **Complete** in REQUIREMENTS.md (resolved 2026-04-13 with artifact), the plan itself says "this can likely resolve to `pass`". Auditor chose `pass` on that basis, with a Notes cell documenting the would-be-gap and the fixing phase reference.
|
||||
|
||||
## Authentication Gates
|
||||
|
||||
None.
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- `.planning/phases/01-foundation/01-VALIDATION.md` — FOUND (modified)
|
||||
- `## Nyquist Record` heading — FOUND in file
|
||||
- `nyquist_audited:` frontmatter key — FOUND in file
|
||||
- Commit `d37a196` — FOUND in `git log`
|
||||
- No source code files touched (plan constraint) — verified via `git show --stat d37a196` (only `01-VALIDATION.md`)
|
||||
@@ -0,0 +1,91 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 02
|
||||
type: execute
|
||||
wave: 2
|
||||
depends_on: [08-01]
|
||||
files_modified:
|
||||
- .planning/phases/02-driver-management/02-VALIDATION.md
|
||||
autonomous: true
|
||||
requirements: [NYQ-01]
|
||||
must_haves:
|
||||
truths:
|
||||
- "Phase 2 VALIDATION.md contains a Nyquist Record with exactly one observable check per Phase 2 success criterion"
|
||||
- "Every Phase 2 Nyquist Record row cites evidence (test + file:line, commit SHA + file:line, artifact path, or dated VERIFICATION.md link)"
|
||||
- "POST /drivers/upload 500 gap is recorded as fail-fix-v1.1 linked to Phase 9 / UX-01"
|
||||
- "Phase 2 frontmatter has nyquist_audited + nyquist_auditor"
|
||||
artifacts:
|
||||
- path: ".planning/phases/02-driver-management/02-VALIDATION.md"
|
||||
provides: "Phase 2 Nyquist Record table + updated frontmatter"
|
||||
contains: "## Nyquist Record"
|
||||
key_links:
|
||||
- from: ".planning/phases/02-driver-management/02-VALIDATION.md gap row"
|
||||
to: ".planning/phases/09-ux-tech-debt-closure"
|
||||
via: "fail-fix-v1.1 link for POST /drivers/upload 500"
|
||||
pattern: "fail-fix-v1.1.*UX-01|Phase 9"
|
||||
---
|
||||
|
||||
<objective>
|
||||
Audit Phase 2 (Driver Management, DRV-01..05) against Nyquist rules. Upgrade `02-VALIDATION.md` in place with a `## Nyquist Record` section and updated frontmatter. Must record the pre-surfaced `POST /drivers/upload` 500 gap as `fail-fix-v1.1` → Phase 9 / UX-01 (per CONTEXT.md deferred-ideas block).
|
||||
|
||||
Purpose: Second of 7 per-phase audits feeding the milestone index.
|
||||
Output: Upgraded `.planning/phases/02-driver-management/02-VALIDATION.md`.
|
||||
</objective>
|
||||
|
||||
<execution_context>
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/workflows/execute-plan.md
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/templates/summary.md
|
||||
</execution_context>
|
||||
|
||||
<context>
|
||||
@.planning/ROADMAP.md
|
||||
@.planning/STATE.md
|
||||
@.planning/REQUIREMENTS.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-CONTEXT.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-01-SUMMARY.md
|
||||
@.planning/milestones/v1.0-ROADMAP.md
|
||||
@.planning/phases/02-driver-management/02-VALIDATION.md
|
||||
@.planning/phases/02-driver-management/02-VERIFICATION.md
|
||||
@.planning/phases/02-driver-management/02-01-SUMMARY.md
|
||||
@.planning/phases/02-driver-management/02-02-SUMMARY.md
|
||||
</context>
|
||||
|
||||
<tasks>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 1: Build Phase 2 Nyquist Record and upgrade 02-VALIDATION.md</name>
|
||||
<files>.planning/phases/02-driver-management/02-VALIDATION.md</files>
|
||||
<action>
|
||||
Follow the exact methodology established in 08-01 (see 08-01-SUMMARY.md for the evidence-lookup pattern used):
|
||||
1. Extract Phase 2 success criteria from `.planning/milestones/v1.0-ROADMAP.md` (DRV-01..05 scope).
|
||||
2. Derive one observable check per criterion.
|
||||
3. Locate evidence (test > commit > artifact > manual), preserving the priority order from CONTEXT.md.
|
||||
4. Preserve all existing sections of 02-VALIDATION.md verbatim.
|
||||
5. Append `## Nyquist Record` with rows `| # | Success Criterion | Observable Check | Evidence | Status | Notes |`.
|
||||
6. **MANDATORY:** Add a `fail-fix-v1.1` row for `POST /drivers/upload` HTTP 500 (reported 2026-04-13 during Phase 8 kickoff — see CONTEXT.md deferred-ideas). Link to Phase 9 / UX-01. This is non-negotiable per the locked decision in CONTEXT.md. Even if UX-01 is now marked Complete in REQUIREMENTS.md, the historical gap against Phase 2 must be recorded; if UX-01 is complete, cite the fixing commit and flip status accordingly (e.g. `pass` with a Notes pointer: "fixed in Phase 9 commit <SHA>").
|
||||
7. Update frontmatter: `nyquist_audited: <date>`, `nyquist_auditor: <name>`. Set `nyquist_compliant: true` only if all rows resolve.
|
||||
</action>
|
||||
<verify>
|
||||
<automated>grep -q "^## Nyquist Record" .planning/phases/02-driver-management/02-VALIDATION.md && grep -qi "drivers/upload" .planning/phases/02-driver-management/02-VALIDATION.md && grep -q "nyquist_audited:" .planning/phases/02-driver-management/02-VALIDATION.md</automated>
|
||||
</verify>
|
||||
<done>
|
||||
02-VALIDATION.md has a complete Nyquist Record, the POST /drivers/upload 500 gap is recorded with a link to Phase 9 / UX-01, and frontmatter is updated.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
</tasks>
|
||||
|
||||
<verification>
|
||||
- `## Nyquist Record` section exists in 02-VALIDATION.md
|
||||
- Row count matches Phase 2 success criteria from milestones/v1.0-ROADMAP.md
|
||||
- A row referencing `POST /drivers/upload` and Phase 9 / UX-01 exists
|
||||
- Frontmatter has nyquist_audited + nyquist_auditor keys
|
||||
</verification>
|
||||
|
||||
<success_criteria>
|
||||
Phase 2 Nyquist audit complete with the driver-upload 500 gap formally tracked.
|
||||
</success_criteria>
|
||||
|
||||
<output>
|
||||
After completion, create `.planning/phases/08-nyquist-validation-track/08-02-SUMMARY.md`
|
||||
</output>
|
||||
@@ -0,0 +1,101 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 02
|
||||
subsystem: validation-audit
|
||||
tags: [nyquist, audit, phase-2, driver-management, validation]
|
||||
requires:
|
||||
- phase: 08-01
|
||||
provides: "Phase 1 Nyquist Record pattern + evidence-lookup methodology"
|
||||
provides:
|
||||
- "Phase 2 Nyquist Record (6 rows, all pass) in .planning/phases/02-driver-management/02-VALIDATION.md"
|
||||
- "Phase 2 nyquist_compliant=true audited 2026-04-13"
|
||||
- "Formal closure of POST /drivers/upload 500 historical gap via Phase 9 / UX-01 fixing commits"
|
||||
affects:
|
||||
- .planning/phases/02-driver-management/02-VALIDATION.md
|
||||
tech_stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Nyquist Record audit table reused from 08-01: # | Criterion | Observable Check | Evidence | Status | Notes"
|
||||
- "Historical gap-closure citation pattern: record fail-fix-v1.1 gap but resolve as pass when fixing phase has already shipped"
|
||||
key_files:
|
||||
created:
|
||||
- .planning/phases/08-nyquist-validation-track/08-02-SUMMARY.md
|
||||
modified:
|
||||
- .planning/phases/02-driver-management/02-VALIDATION.md
|
||||
decisions:
|
||||
- "Derived 6 rows: one per DRV-0x success criterion from v1.0-ROADMAP.md Phase 2 (DRV-01..05 = rows 1-5), plus row 6 for the mandatory POST /drivers/upload 500 historical gap per CONTEXT.md locked decision."
|
||||
- "Row 6 resolved PASS (not fail-fix-v1.1) because Phase 9 Plan 01 UX-01 was already Complete in REQUIREMENTS.md at audit time — the plan explicitly permits this closure pattern. Cited fixing commits d1de839 (RED tests), 10ee09a (handler fix), 72c6a98 (printer_form wiring)."
|
||||
- "nyquist_compliant flipped to true because all 6 rows are pass; no deferred/wont-do/fail rows."
|
||||
- "Cross-referenced all 5 DRV-0x criteria against 02-VERIFICATION.md's 14 observable truths (14/14 verified 2026-04-10) to keep evidence traceable to the original verifier run."
|
||||
metrics:
|
||||
tasks_completed: 1
|
||||
tasks_total: 1
|
||||
duration_minutes: 4
|
||||
completed_date: 2026-04-13
|
||||
requirements_completed: []
|
||||
---
|
||||
|
||||
# Phase 08 Plan 02: Phase 2 Nyquist Audit Summary
|
||||
|
||||
**One-liner:** Audited Phase 2 (Driver Management, DRV-01..05) against Nyquist rules and upgraded `02-VALIDATION.md` in place with a 6-row Nyquist Record where every DRV-0x success criterion maps to exactly one observable pytest check, plus a formal row closing the Phase 8 kickoff-surfaced `POST /drivers/upload` HTTP 500 historical gap via Phase 9 / UX-01 fixing commits.
|
||||
|
||||
## What Shipped
|
||||
|
||||
- `.planning/phases/02-driver-management/02-VALIDATION.md` now contains a `## Nyquist Record` section (placed above Validation Sign-Off, below Manual-Only Verifications).
|
||||
- 6 rows: one per DRV-0x success criterion (5) + one historical-gap closure row for the POST /drivers/upload 500 defect.
|
||||
- Every row has a non-empty Observable Check cell (pytest invocation) and a non-empty Evidence cell citing committed tests, source paths, commit SHAs, and the dated 02-VERIFICATION.md run.
|
||||
- Row 6 formally records the POST /drivers/upload 500 defect reported 2026-04-13 during Phase 8 kickoff, links it to Phase 9 / UX-01, and closes it as `pass` citing the fixing commits `d1de839` (RED tests), `10ee09a` (handler caller-branch fix), and `72c6a98` (printer_form.html wiring).
|
||||
- Frontmatter updated: `nyquist_compliant: false → true`, added `nyquist_audited: 2026-04-13`, `nyquist_auditor: Claude (gsd-executor, plan 08-02)`.
|
||||
- All historical sections (Test Infrastructure, Sampling Rate, Per-Task Verification Map, Wave 0 Requirements, Manual-Only Verifications, Validation Sign-Off) preserved verbatim.
|
||||
|
||||
## Audit Outcome
|
||||
|
||||
| Status | Count |
|
||||
|--------|-------|
|
||||
| pass | 6 |
|
||||
| fail-fix-v1.1 | 0 |
|
||||
| deferred-v1.2 | 0 |
|
||||
| wont-do | 0 |
|
||||
|
||||
Phase 2 is Nyquist-compliant. Zero gaps carry forward into 08-08 (rollup). The POST /drivers/upload 500 is recorded as a historical-gap row resolved in Phase 9.
|
||||
|
||||
## Evidence Strategy Used
|
||||
|
||||
Priority order from CONTEXT.md was honored:
|
||||
1. **Test evidence** (preferred): used for all 6 rows — `tests/test_driver_upload.py` (test_upload_valid_zip, test_upload_non_zip, test_upload_no_inf, test_drivers_page, test_upload_returns_select, test_driver_persisted, test_dedup_upload, test_unused_files_in_response, test_upload_500_regression, test_upload_oob_*) and `tests/test_inf_parser.py` (16 tests).
|
||||
2. **Commit/file-line evidence**: cited alongside tests for source-of-truth — `imptune/api/drivers.py`, `imptune/services/inf_parser.py`, `imptune/storage/driver_store.py`, `imptune/templates/partials/driver_list.html`. Commits cited: 290106d, 5056922 (02-01 RED/GREEN), c648fc5 (02-02), and d1de839 + 10ee09a + 72c6a98 (Phase 9 / UX-01 fix).
|
||||
3. **Dated manual-check evidence**: 02-VERIFICATION.md (2026-04-10, 14/14 observable truths verified) referenced in Notes columns for cross-traceability.
|
||||
|
||||
No row relied on "code looks right" — every check is an actual pytest invocation.
|
||||
|
||||
## Cross-Reference with 02-VERIFICATION.md
|
||||
|
||||
`02-VERIFICATION.md` (dated 2026-04-10) already enumerated 14 observable truths split across plans 02-01 (7 truths on the INF parser) and 02-02 (7 truths on the upload endpoint + UI). The Nyquist Record maps:
|
||||
|
||||
- Row 1 (DRV-01) ← 02-VERIFICATION.md rows 8 + 10
|
||||
- Row 2 (DRV-02) ← 02-VERIFICATION.md rows 1-7
|
||||
- Row 3 (DRV-03) ← 02-VERIFICATION.md rows 9 + 14
|
||||
- Row 4 (DRV-04) ← 02-VERIFICATION.md rows 11 + 12
|
||||
- Row 5 (DRV-05) ← 02-VERIFICATION.md rows 5 + 13
|
||||
- Row 6 (historical gap) ← Phase 9 / UX-01 09-01-SUMMARY.md (new evidence, post-dates 02-VERIFICATION.md)
|
||||
|
||||
This keeps the two documents 1:1 alignable for rows 1-5.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
**None.** Plan 08-02 executed exactly as written. Single task, single file edit.
|
||||
|
||||
Minor interpretive choice (within plan latitude, step 6 explicitly allowing this): row 6 was recorded as `pass` citing Phase 9 UX-01 fixing commits rather than `fail-fix-v1.1`. The plan's Task 1 step 6 anticipates this exact case — "if UX-01 is complete, cite the fixing commit and flip status accordingly". UX-01 is marked Complete in REQUIREMENTS.md, so the historical gap is recorded in the Notes column but closed as `pass`. Same precedent established in 08-01 row 14 (Phase 1 spike → Phase 10 RTVAL-01 close).
|
||||
|
||||
## Authentication Gates
|
||||
|
||||
None.
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- `.planning/phases/02-driver-management/02-VALIDATION.md` — FOUND (modified)
|
||||
- `## Nyquist Record` heading — FOUND in file
|
||||
- `nyquist_audited:` frontmatter key — FOUND in file
|
||||
- `drivers/upload` reference — FOUND in file (row 6 of Nyquist Record)
|
||||
- Commit `dff5a9c` — FOUND in `git log`
|
||||
- No source code files touched (plan constraint) — only `.planning/phases/02-driver-management/02-VALIDATION.md` modified
|
||||
@@ -0,0 +1,89 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 03
|
||||
type: execute
|
||||
wave: 3
|
||||
depends_on: [08-02]
|
||||
files_modified:
|
||||
- .planning/phases/03-printer-configuration/03-VALIDATION.md
|
||||
autonomous: true
|
||||
requirements: [NYQ-01]
|
||||
must_haves:
|
||||
truths:
|
||||
- "Phase 3 VALIDATION.md contains a Nyquist Record with exactly one observable check per Phase 3 success criterion"
|
||||
- "Every Phase 3 row cites evidence from the accepted evidence types"
|
||||
- "PRNT-03 Alpine.js IP->port verification gap is tracked (resolved via Phase 9 / UX-02 or deferred)"
|
||||
- "Phase 3 frontmatter has nyquist_audited + nyquist_auditor"
|
||||
artifacts:
|
||||
- path: ".planning/phases/03-printer-configuration/03-VALIDATION.md"
|
||||
provides: "Phase 3 Nyquist Record table + updated frontmatter"
|
||||
contains: "## Nyquist Record"
|
||||
key_links:
|
||||
- from: ".planning/phases/03-printer-configuration/03-VALIDATION.md"
|
||||
to: ".planning/milestones/v1.0-ROADMAP.md"
|
||||
via: "one row per Phase 3 success criterion"
|
||||
pattern: "## Nyquist Record"
|
||||
---
|
||||
|
||||
<objective>
|
||||
Audit Phase 3 (Printer Configuration, PRNT-01..05) against Nyquist rules. Upgrade `03-VALIDATION.md` in place.
|
||||
|
||||
Purpose: Third of 7 per-phase audits feeding the milestone index.
|
||||
Output: Upgraded `.planning/phases/03-printer-configuration/03-VALIDATION.md`.
|
||||
</objective>
|
||||
|
||||
<execution_context>
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/workflows/execute-plan.md
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/templates/summary.md
|
||||
</execution_context>
|
||||
|
||||
<context>
|
||||
@.planning/ROADMAP.md
|
||||
@.planning/STATE.md
|
||||
@.planning/REQUIREMENTS.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-CONTEXT.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-02-SUMMARY.md
|
||||
@.planning/milestones/v1.0-ROADMAP.md
|
||||
@.planning/phases/03-printer-configuration/03-VALIDATION.md
|
||||
@.planning/phases/03-printer-configuration/03-VERIFICATION.md
|
||||
@.planning/phases/03-printer-configuration/03-01-SUMMARY.md
|
||||
@.planning/phases/03-printer-configuration/03-02-SUMMARY.md
|
||||
</context>
|
||||
|
||||
<tasks>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 1: Build Phase 3 Nyquist Record and upgrade 03-VALIDATION.md</name>
|
||||
<files>.planning/phases/03-printer-configuration/03-VALIDATION.md</files>
|
||||
<action>
|
||||
Apply the same methodology as 08-01 and 08-02:
|
||||
1. Extract Phase 3 (PRNT-01..05) success criteria from `.planning/milestones/v1.0-ROADMAP.md`.
|
||||
2. One observable check per criterion; evidence in priority order (test > commit > artifact > manual).
|
||||
3. Preserve all existing sections verbatim; append `## Nyquist Record` above the sign-off section.
|
||||
4. Record the PRNT-03 Alpine.js IP->port live-browser verification item. Per CONTEXT.md this was a known UX gap absorbed into Phase 9 / UX-02 (now Complete). Cite the Phase 9 fix commit if available, or mark `fail-fix-v1.1` → Phase 9 / UX-02 with resolution note.
|
||||
5. Update frontmatter (`nyquist_audited`, `nyquist_auditor`, `nyquist_compliant` if fully resolved).
|
||||
</action>
|
||||
<verify>
|
||||
<automated>grep -q "^## Nyquist Record" .planning/phases/03-printer-configuration/03-VALIDATION.md && grep -q "nyquist_audited:" .planning/phases/03-printer-configuration/03-VALIDATION.md</automated>
|
||||
</verify>
|
||||
<done>
|
||||
03-VALIDATION.md has a complete Nyquist Record with one row per Phase 3 success criterion, evidence cited, PRNT-03 gap status recorded, and frontmatter updated.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
</tasks>
|
||||
|
||||
<verification>
|
||||
- `## Nyquist Record` section exists in 03-VALIDATION.md
|
||||
- Row count matches Phase 3 success criteria from milestones/v1.0-ROADMAP.md
|
||||
- PRNT-03 IP->port row exists with either pass+citation or fail-fix-v1.1 → Phase 9
|
||||
- Frontmatter has nyquist_audited + nyquist_auditor keys
|
||||
</verification>
|
||||
|
||||
<success_criteria>
|
||||
Phase 3 Nyquist audit complete.
|
||||
</success_criteria>
|
||||
|
||||
<output>
|
||||
After completion, create `.planning/phases/08-nyquist-validation-track/08-03-SUMMARY.md`
|
||||
</output>
|
||||
@@ -0,0 +1,106 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 03
|
||||
subsystem: validation-audit
|
||||
tags: [nyquist, audit, phase-3, printer-configuration, validation]
|
||||
requires:
|
||||
- phase: 08-02
|
||||
provides: "Phase 2 Nyquist Record pattern + historical-gap closure methodology"
|
||||
provides:
|
||||
- "Phase 3 Nyquist Record (10 rows, all pass) in .planning/phases/03-printer-configuration/03-VALIDATION.md"
|
||||
- "Phase 3 nyquist_compliant=true audited 2026-04-13"
|
||||
- "Formal closure of PRNT-03 Alpine.js IP->port live-browser gap via Phase 9 / UX-02 fixing commits"
|
||||
affects:
|
||||
- .planning/phases/03-printer-configuration/03-VALIDATION.md
|
||||
tech_stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Nyquist Record audit table reused from 08-01 / 08-02: # | Criterion | Observable Check | Evidence | Status | Notes"
|
||||
- "Historical gap-closure citation pattern: third application (Phase 1 spike->RTVAL-01, drivers/upload 500->UX-01, PRNT-03 Alpine->UX-02)"
|
||||
key_files:
|
||||
created:
|
||||
- .planning/phases/08-nyquist-validation-track/08-03-SUMMARY.md
|
||||
modified:
|
||||
- .planning/phases/03-printer-configuration/03-VALIDATION.md
|
||||
decisions:
|
||||
- "Derived 10 rows: one per PRNT-0x success criterion from v1.0-ROADMAP.md Phase 3 (PRNT-01..10). No extra historical-gap rows beyond the PRNT-03 criterion itself (no new kickoff-surfaced defects for Phase 3)."
|
||||
- "Row 3 (PRNT-03) resolved PASS (not fail-fix-v1.1) because Phase 9 Plan 02 UX-02 was already Complete in REQUIREMENTS.md at audit time. Cited fixing commits 322fc20 (Playwright e2e test) and 37a06da (plan 09-02 completion docs). Precedent from 08-01 row 14 and 08-02 row 6."
|
||||
- "nyquist_compliant flipped to true because all 10 rows are pass; no deferred/wont-do/fail rows."
|
||||
- "Cross-referenced all 10 PRNT-0x criteria against 03-VERIFICATION.md's 10 observable truths (9 VERIFIED + 1 NEEDS HUMAN on Truth 2 which maps to PRNT-03) — the only 'needs human' truth from v1.0 is precisely the one resolved via Phase 9 / UX-02 Playwright."
|
||||
- "PRNT-10 row recorded as pass citing the Phase-3-scoped deliverable (detail page + driver FK intact + placeholder button). Full regeneration workflow is a Phase 4 deliverable and out of scope for Phase 3 Nyquist."
|
||||
metrics:
|
||||
tasks_completed: 1
|
||||
tasks_total: 1
|
||||
duration_minutes: 5
|
||||
completed_date: 2026-04-13
|
||||
requirements_completed: []
|
||||
---
|
||||
|
||||
# Phase 08 Plan 03: Phase 3 Nyquist Audit Summary
|
||||
|
||||
**One-liner:** Audited Phase 3 (Printer Configuration, PRNT-01..10) against Nyquist rules and upgraded `03-VALIDATION.md` in place with a 10-row Nyquist Record where every PRNT-0x success criterion maps to exactly one observable check, including the PRNT-03 Alpine.js IP->port criterion whose live-browser verification gap is closed via Phase 9 / UX-02 Playwright fixing commits.
|
||||
|
||||
## What Shipped
|
||||
|
||||
- `.planning/phases/03-printer-configuration/03-VALIDATION.md` now contains a `## Nyquist Record` section (placed above Validation Sign-Off, below Manual-Only Verifications).
|
||||
- 10 rows: one per PRNT-0x success criterion. No extra historical-gap rows needed for Phase 3 — the PRNT-03 Alpine.js gap is not separate from PRNT-03 itself, so it is recorded as the PRNT-03 row's status + Notes rather than a bonus row (compare 08-02 which needed a row-6 bonus for the `POST /drivers/upload` 500 defect that wasn't a DRV-0x criterion).
|
||||
- Every row has a non-empty Observable Check cell (pytest invocation or Playwright e2e invocation) and a non-empty Evidence cell citing committed tests, source paths, commit SHAs, and the dated 03-VERIFICATION.md run.
|
||||
- Row 3 (PRNT-03) formally records the Alpine.js IP->port live-browser verification gap flagged 2026-04-10 in 03-VERIFICATION.md as `NEEDS HUMAN`, links it to Phase 9 / UX-02, and closes it as `pass` citing fixing commits `322fc20` (Playwright e2e test) and `37a06da` (plan 09-02 completion docs).
|
||||
- Frontmatter updated: `nyquist_compliant: false -> true`, added `nyquist_audited: 2026-04-13`, `nyquist_auditor: Claude (gsd-executor, plan 08-03)`.
|
||||
- All historical sections (Test Infrastructure, Sampling Rate, Per-Task Verification Map, Wave 0 Requirements, Manual-Only Verifications, Validation Sign-Off) preserved verbatim.
|
||||
|
||||
## Audit Outcome
|
||||
|
||||
| Status | Count |
|
||||
|--------|-------|
|
||||
| pass | 10 |
|
||||
| fail-fix-v1.1 | 0 |
|
||||
| deferred-v1.2 | 0 |
|
||||
| wont-do | 0 |
|
||||
|
||||
Phase 3 is Nyquist-compliant. Zero gaps carry forward into 08-08 (rollup). The PRNT-03 live-browser verification gap is recorded as a historical gap resolved in Phase 9 / UX-02.
|
||||
|
||||
## Evidence Strategy Used
|
||||
|
||||
Priority order from CONTEXT.md was honored:
|
||||
1. **Test evidence** (preferred): used for 9 of 10 rows via `tests/test_printer_crud.py` (test_create_printer_persisted, test_create_printer_duplex, test_create_printer_color_mode, test_create_printer_paper_size, test_create_printer_collate, test_printer_survives_page_refresh, test_printer_grouped_by_client, test_printer_detail_shows_driver, test_printer_detail_no_driver). Row 3 uses e2e evidence via `tests/e2e/test_port_autofill.py` (Playwright headless chromium).
|
||||
2. **Commit/file-line evidence**: cited alongside tests for source-of-truth — `imptune/api/printers.py`, `imptune/api/pages.py`, `imptune/templates/partials/printer_form.html`, `imptune/templates/partials/printer_list.html`, `imptune/templates/printer_detail.html`, `imptune/db/models.py`. Commits cited: 356c2ee (03-01 Phase 3 CRUD), 322fc20 + 37a06da (Phase 9 UX-02 Playwright fix).
|
||||
3. **Dated manual-check evidence**: 03-VERIFICATION.md (2026-04-10, 9/10 VERIFIED + 1 NEEDS HUMAN on PRNT-03) referenced in Notes columns for cross-traceability. The single NEEDS HUMAN row is exactly the one resolved via row 3's Phase 9 / UX-02 closure.
|
||||
|
||||
No row relied on "code looks right" — every check is an actual pytest or Playwright invocation.
|
||||
|
||||
## Cross-Reference with 03-VERIFICATION.md
|
||||
|
||||
`03-VERIFICATION.md` (dated 2026-04-10) enumerated 10 observable truths covering PRNT-01..10. The Nyquist Record maps:
|
||||
|
||||
- Row 1 (PRNT-01) <- 03-VERIFICATION.md Truth 1 (form fields + persistence)
|
||||
- Row 2 (PRNT-02) <- 03-VERIFICATION.md Truth 1 (ip_address field)
|
||||
- Row 3 (PRNT-03) <- 03-VERIFICATION.md Truth 2 (NEEDS HUMAN -> resolved via Phase 9 / UX-02 Playwright)
|
||||
- Row 4 (PRNT-04) <- 03-VERIFICATION.md PRNT-04 coverage row
|
||||
- Row 5 (PRNT-05) <- 03-VERIFICATION.md PRNT-05 coverage row
|
||||
- Row 6 (PRNT-06) <- 03-VERIFICATION.md PRNT-06 coverage row
|
||||
- Row 7 (PRNT-07) <- 03-VERIFICATION.md PRNT-07 coverage row
|
||||
- Row 8 (PRNT-08) <- 03-VERIFICATION.md Truth 3 + 4 (grouped-by-client)
|
||||
- Row 9 (PRNT-09) <- 03-VERIFICATION.md Truth 4 (persistence across refresh)
|
||||
- Row 10 (PRNT-10) <- 03-VERIFICATION.md Truths 6 + 7 + 8 (detail page + driver FK + placeholder button)
|
||||
|
||||
This keeps the two documents 1:1 alignable — and notably the single v1.0-era `NEEDS HUMAN` truth is exactly the PRNT-03 row that Phase 9 / UX-02 closed.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
**None.** Plan 08-03 executed exactly as written. Single task, single file edit.
|
||||
|
||||
Minor interpretive choice (within plan latitude, Task 1 step 4 explicitly allowing this): row 3 was recorded as `pass` citing Phase 9 UX-02 fixing commits rather than `fail-fix-v1.1`. The plan's Task 1 step 4 anticipates this exact case — "Per CONTEXT.md this was a known UX gap absorbed into Phase 9 / UX-02 (now Complete). Cite the Phase 9 fix commit if available". UX-02 is marked Complete in REQUIREMENTS.md, so the historical gap is recorded in the Notes column but closed as `pass`. Third application of the precedent established in 08-01 (row 14 Phase 1 spike -> Phase 10 RTVAL-01) and 08-02 (row 6 drivers/upload 500 -> Phase 9 UX-01).
|
||||
|
||||
## Authentication Gates
|
||||
|
||||
None.
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- `.planning/phases/03-printer-configuration/03-VALIDATION.md` — FOUND (modified)
|
||||
- `## Nyquist Record` heading — FOUND in file
|
||||
- `nyquist_audited:` frontmatter key — FOUND in file
|
||||
- `PRNT-03` Alpine.js row present with Phase 9 / UX-02 citation — FOUND in file
|
||||
- Commit `3f03b35` — FOUND in `git log`
|
||||
- No source code files touched (plan constraint) — only `.planning/phases/03-printer-configuration/03-VALIDATION.md` modified
|
||||
@@ -0,0 +1,89 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 04
|
||||
type: execute
|
||||
wave: 4
|
||||
depends_on: [08-03]
|
||||
files_modified:
|
||||
- .planning/phases/04-script-generation/04-VALIDATION.md
|
||||
autonomous: true
|
||||
requirements: [NYQ-01]
|
||||
must_haves:
|
||||
truths:
|
||||
- "Phase 4 VALIDATION.md contains a Nyquist Record with exactly one observable check per Phase 4 success criterion"
|
||||
- "Every Phase 4 row cites evidence from the accepted evidence types"
|
||||
- "SYSTEM-context / pnputil / $PSScriptRoot checks resolved via Phase 10 RTVAL-02..04 attestation (or tracked as fail-fix)"
|
||||
- "Phase 4 frontmatter has nyquist_audited + nyquist_auditor"
|
||||
artifacts:
|
||||
- path: ".planning/phases/04-script-generation/04-VALIDATION.md"
|
||||
provides: "Phase 4 Nyquist Record table + updated frontmatter"
|
||||
contains: "## Nyquist Record"
|
||||
key_links:
|
||||
- from: ".planning/phases/04-script-generation/04-VALIDATION.md runtime rows"
|
||||
to: ".planning/phases/10-real-world-runtime-validation/10-RUNTIME-VALIDATION.md"
|
||||
via: "attestation-only PASS for RTVAL-02/03/04 (per STATE.md note)"
|
||||
pattern: "RTVAL-0[234]|attestation"
|
||||
---
|
||||
|
||||
<objective>
|
||||
Audit Phase 4 (Script Generation, SCR-01..05) against Nyquist rules. Upgrade `04-VALIDATION.md` in place. Pay special attention to SYSTEM-context claims (pnputil, $PSScriptRoot) — per STATE.md these are attestation-only PASSes from Phase 10 and the audit must reflect that weakened audit trail in the Notes column.
|
||||
|
||||
Purpose: Fourth of 7 per-phase audits feeding the milestone index.
|
||||
Output: Upgraded `.planning/phases/04-script-generation/04-VALIDATION.md`.
|
||||
</objective>
|
||||
|
||||
<execution_context>
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/workflows/execute-plan.md
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/templates/summary.md
|
||||
</execution_context>
|
||||
|
||||
<context>
|
||||
@.planning/ROADMAP.md
|
||||
@.planning/STATE.md
|
||||
@.planning/REQUIREMENTS.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-CONTEXT.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-03-SUMMARY.md
|
||||
@.planning/milestones/v1.0-ROADMAP.md
|
||||
@.planning/phases/04-script-generation/04-VALIDATION.md
|
||||
@.planning/phases/04-script-generation/04-VERIFICATION.md
|
||||
@.planning/phases/04-script-generation/04-01-SUMMARY.md
|
||||
@.planning/phases/04-script-generation/04-02-SUMMARY.md
|
||||
</context>
|
||||
|
||||
<tasks>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 1: Build Phase 4 Nyquist Record and upgrade 04-VALIDATION.md</name>
|
||||
<files>.planning/phases/04-script-generation/04-VALIDATION.md</files>
|
||||
<action>
|
||||
Apply the established methodology:
|
||||
1. Extract Phase 4 (SCR-01..05) success criteria from `.planning/milestones/v1.0-ROADMAP.md`.
|
||||
2. One observable check per criterion; evidence in priority order.
|
||||
3. Preserve all existing sections; append `## Nyquist Record`.
|
||||
4. For any criterion that requires runtime SYSTEM-context proof (pnputil staging, $PSScriptRoot resolution, detect/uninstall under SYSTEM): evidence is the Phase 10 RUNTIME-VALIDATION.md report. **Mark Notes explicitly that RTVAL-02/03/04 are attestation-only PASSes per STATE.md** — the audit records this weakened audit trail faithfully, it does not hide it. Status may still be `pass` since Phase 10 signed off with explicit acknowledgement, but Notes must say "attestation-only per STATE.md 2026-04-13".
|
||||
5. Update frontmatter.
|
||||
</action>
|
||||
<verify>
|
||||
<automated>grep -q "^## Nyquist Record" .planning/phases/04-script-generation/04-VALIDATION.md && grep -q "nyquist_audited:" .planning/phases/04-script-generation/04-VALIDATION.md</automated>
|
||||
</verify>
|
||||
<done>
|
||||
04-VALIDATION.md has a complete Nyquist Record, SYSTEM-context rows cite Phase 10 with the attestation-only caveat in Notes, and frontmatter is updated.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
</tasks>
|
||||
|
||||
<verification>
|
||||
- `## Nyquist Record` section exists in 04-VALIDATION.md
|
||||
- Row count matches Phase 4 success criteria
|
||||
- Any row citing SYSTEM-context / pnputil / $PSScriptRoot has the "attestation-only" note
|
||||
- Frontmatter has nyquist_audited + nyquist_auditor keys
|
||||
</verification>
|
||||
|
||||
<success_criteria>
|
||||
Phase 4 Nyquist audit complete with honest recording of the attestation-only runtime evidence.
|
||||
</success_criteria>
|
||||
|
||||
<output>
|
||||
After completion, create `.planning/phases/08-nyquist-validation-track/08-04-SUMMARY.md`
|
||||
</output>
|
||||
@@ -0,0 +1,115 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 04
|
||||
subsystem: validation-audit
|
||||
tags: [nyquist, audit, phase-4, script-generation, validation, attestation-gap]
|
||||
requires:
|
||||
- phase: 08-03
|
||||
provides: "Phase 3 Nyquist Record pattern + historical-gap closure methodology"
|
||||
provides:
|
||||
- "Phase 4 Nyquist Record (5 rows, all pass) in .planning/phases/04-script-generation/04-VALIDATION.md"
|
||||
- "Phase 4 nyquist_compliant=true audited 2026-04-13"
|
||||
- "Faithful recording of Phase 10 RTVAL-02/03/04 attestation-only audit-trail damage as Notes on SYSTEM-context rows (no hiding, no upgrade to fail-fix)"
|
||||
affects:
|
||||
- .planning/phases/04-script-generation/04-VALIDATION.md
|
||||
tech_stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Nyquist Record audit table reused from 08-01/02/03: # | Criterion | Observable Check | Evidence | Status | Notes"
|
||||
- "Attestation-gap citation pattern: pass row + explicit Notes clause citing STATE.md 2026-04-13 + RTVAL-02/03/04"
|
||||
key_files:
|
||||
created:
|
||||
- .planning/phases/08-nyquist-validation-track/08-04-SUMMARY.md
|
||||
modified:
|
||||
- .planning/phases/04-script-generation/04-VALIDATION.md
|
||||
decisions:
|
||||
- "Derived 5 rows: one per SCRPT-0x success criterion from v1.0-ROADMAP.md Phase 4 (SCRPT-01..05). No extra historical-gap rows — Phase 4 shipped with 12/12 truths VERIFIED in 04-VERIFICATION.md and no kickoff-surfaced defects of its own."
|
||||
- "All 5 rows pass because Phase 10 signed off the runtime half with explicit attestation-gap acknowledgement (plan 10-03 commit cd2df1e). Per plan 08-04 directive, audit faithfully records the weakened audit trail in Notes rather than inflating to fail-fix-v1.1 — this mirrors the locked decision in STATE.md and the user's explicit approval of the attestation pattern."
|
||||
- "Rows 1/2/3 (SCRPT-01/02/03) each cite Phase 10 RTVAL-02/03/04 respectively, with Notes explicitly stating 'attestation-only per STATE.md 2026-04-13' and naming the missing artifacts (IntuneManagementExtension.log excerpt, rtval-03-detection.png, rtval-04-uninstall-log.txt, rtval-04-uninstall-status.png)."
|
||||
- "Row 4 (SCRPT-04 UAC) scoped narrowly: the SYSTEM-branch (skip elevation) was exercised in RTVAL-02 attestation-only; the user-interactive UAC dialog branch is NOT covered by Phase 10 at all and remains a Manual-Only Verification. Notes state this delineation explicitly."
|
||||
- "Row 5 (SCRPT-05 WOW64) recorded pass with Note that the relaunch branch itself is not directly observable from the RTVAL-02 attestation (technician only attested install succeeded, not that SysNative relaunch was taken). Template-level positional correctness (guard before pnputil) is fully pytest-automated. Phase 11 rollout owns the full WOW64 trace."
|
||||
- "No historical-gap bonus rows (unlike 08-02 row 6 drivers/upload 500). Phase 4 had no kickoff-surfaced defects beyond its own SCRPT-0x criteria."
|
||||
metrics:
|
||||
tasks_completed: 1
|
||||
tasks_total: 1
|
||||
duration_minutes: 7
|
||||
completed_date: 2026-04-13
|
||||
requirements_completed: []
|
||||
---
|
||||
|
||||
# Phase 08 Plan 04: Phase 4 Nyquist Audit Summary
|
||||
|
||||
**One-liner:** Audited Phase 4 (Script Generation, SCRPT-01..05) against Nyquist rules and upgraded `04-VALIDATION.md` in place with a 5-row Nyquist Record where every SCRPT-0x criterion maps to exactly one observable check, with all three Phase 10 attestation-only RTVAL checks (RTVAL-02/03/04) faithfully recorded in the Notes column as weakened-audit-trail PASSes per STATE.md 2026-04-13.
|
||||
|
||||
## What Shipped
|
||||
|
||||
- `.planning/phases/04-script-generation/04-VALIDATION.md` now contains a `## Nyquist Record` section (placed above Validation Sign-Off, below Manual-Only Verifications).
|
||||
- 5 rows: one per SCRPT-0x success criterion from `milestones/v1.0-ROADMAP.md` Phase 4 goal block.
|
||||
- Every row has a non-empty Observable Check (pytest invocation) and a non-empty Evidence cell citing committed tests, source paths, commit SHAs, 04-VERIFICATION.md truths, and — for SYSTEM-context rows — Phase 10 `RUNTIME-VALIDATION.md` with explicit RTVAL sub-check names.
|
||||
- **Attestation gap is faithfully recorded, not hidden.** A preamble paragraph above the table states: "Phase 10 RTVAL-02/03/04 were accepted as attestation-only PASSes — the technician verbally confirmed success but did not produce IntuneManagementExtension.log excerpts, portal screenshots, or status captures. The user was warned twice about cumulative audit-trail damage and explicitly approved proceeding." Each affected row's Notes column repeats the caveat in context.
|
||||
- Frontmatter updated: `nyquist_compliant: false -> true`, added `nyquist_audited: 2026-04-13`, `nyquist_auditor: Claude (gsd-executor, plan 08-04)`.
|
||||
- All historical sections (Test Infrastructure, Sampling Rate, Per-Task Verification Map, Wave 0 Requirements, Manual-Only Verifications, Validation Sign-Off) preserved verbatim.
|
||||
|
||||
## Audit Outcome
|
||||
|
||||
| Status | Count |
|
||||
|---------------|-------|
|
||||
| pass | 5 |
|
||||
| fail-fix-v1.1 | 0 |
|
||||
| deferred-v1.2 | 0 |
|
||||
| wont-do | 0 |
|
||||
|
||||
Phase 4 is Nyquist-compliant at the template level. The runtime-half weakness (SYSTEM-context proof via attestation only) is recorded in Notes and owned by Phase 11 rollout for artifact re-capture.
|
||||
|
||||
## Evidence Strategy Used
|
||||
|
||||
Priority order from CONTEXT.md was honored:
|
||||
1. **Test evidence** (preferred): 5/5 rows cite `tests/test_script_generator.py` invocations — `test_render_install_contains_pnputil`, `test_render_install_print_config`, `test_install_endpoint`, `test_render_uninstall`, `test_uninstall_endpoint`, `test_render_detect`, `test_detect_endpoint`, `test_render_install_uac_guard`, `test_render_install_wow64_guard`. All 14 script-generator tests passed in 04-VERIFICATION.md.
|
||||
2. **Commit/file-line evidence**: `imptune/templates/scripts/install.ps1.j2` (lines 12-16 WOW64, 22-33 UAC, 40-67 pnputil+print-config), `uninstall.ps1.j2` (lines 2-4), `detect.ps1.j2` (lines 2-8), `imptune/generators/script_generator.py` (`_duplex_map`, `render_install`, `render_uninstall` line 70, `render_detect` line 92), `imptune/api/scripts.py` (lines 38-59 install, 63-78 uninstall, 82-94 detect). Commits cited: b4f2c64 (04-01 RED), 8193e9d (04-01 GREEN), 6bff8f3 (04-02 templates + render fns), b7b0d1b (04-02 API endpoints).
|
||||
3. **Dated manual-check evidence**: 04-VERIFICATION.md (2026-04-10, 12/12 truths VERIFIED) referenced per-row for cross-traceability.
|
||||
4. **Runtime evidence (attestation-weakened)**: Phase 10 `RUNTIME-VALIDATION.md` cited on rows 1/2/3/4/5 for SYSTEM-context RTVAL-02/03/04 sub-checks — always with the attestation-only caveat named in Notes.
|
||||
|
||||
No row relied on "code looks right" — every check is an actual pytest invocation plus a cited runtime report.
|
||||
|
||||
## Cross-Reference with 04-VERIFICATION.md
|
||||
|
||||
`04-VERIFICATION.md` (dated 2026-04-10) enumerated 12 observable truths covering SCRPT-01..05. The Nyquist Record collapses these to 5 rows (one per criterion) as follows:
|
||||
|
||||
- Row 1 (SCRPT-01) <- truths 1 (pnputil+cmdlets), 4 (duplex mapping), 5 (idempotency), 8 (install endpoint)
|
||||
- Row 2 (SCRPT-02) <- truths 6 (Remove-* ordering), 9 (uninstall endpoint)
|
||||
- Row 3 (SCRPT-03) <- truths 7 (Write-Output+exit), 10 (detect endpoint)
|
||||
- Row 4 (SCRPT-04) <- truth 3 (SYSTEM vs user + UAC)
|
||||
- Row 5 (SCRPT-05) <- truth 2 (WOW64 positional guard)
|
||||
|
||||
Truths 11 + 12 (404/422 error paths) are cross-cutting and not SCRPT-0x criteria; they're covered as part of rows 1/2/3 evidence without needing their own Nyquist rows.
|
||||
|
||||
## Attestation-Gap Recording (Key Point for 08-08 Rollup)
|
||||
|
||||
Per STATE.md 2026-04-13 and plan 08-04 directive, this audit records the Phase 10 attestation-only audit-trail damage **in place** rather than hiding it or upgrading rows to `fail-fix-v1.1`:
|
||||
|
||||
- **RTVAL-02** (install on real endpoint) → cited on rows 1 (SCRPT-01 pnputil) + 4 (SCRPT-04 SYSTEM branch) + 5 (SCRPT-05 WOW64 end-to-end). Missing artifacts named: IntuneManagementExtension.log excerpt, portal screenshot.
|
||||
- **RTVAL-03** (detection on real endpoint) → cited on row 3 (SCRPT-03). Missing artifacts named: rtval-03-detection.png, rtval-03-detect-manual.txt. Notes call out "second consecutive attestation-only check".
|
||||
- **RTVAL-04** (uninstall on real endpoint) → cited on row 2 (SCRPT-02). Missing artifacts named: rtval-04-uninstall-log.txt, rtval-04-uninstall-status.png. Notes call out "third consecutive attestation-only check".
|
||||
|
||||
The preamble above the table also states the overall attestation-gap framing so that 08-08 rollup and any downstream verifier sees the weakness at a glance rather than having to reconstruct it from individual rows.
|
||||
|
||||
Status remained `pass` for all five rows because Phase 10 plan 10-03 (commit cd2df1e) signed off RUNTIME-VALIDATION.md with explicit written acknowledgement of the attestation gap — i.e., the user made an informed decision and the audit must honor it, not overrule it post-hoc. Phase 11 rollout owns artifact re-capture before broad deployment.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
**None.** Plan 08-04 executed exactly as written. Single task, single file edit. The plan explicitly instructed: "Status may still be `pass` since Phase 10 signed off with explicit acknowledgement, but Notes must say 'attestation-only per STATE.md 2026-04-13'." — done on every affected row.
|
||||
|
||||
No Rule 1-4 deviations triggered. No auth gates.
|
||||
|
||||
## Authentication Gates
|
||||
|
||||
None.
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- `.planning/phases/04-script-generation/04-VALIDATION.md` — FOUND (modified)
|
||||
- `## Nyquist Record` heading — FOUND in file (grep returned 1 match)
|
||||
- `nyquist_audited:` frontmatter key — FOUND in file
|
||||
- `attestation-only per STATE.md 2026-04-13` language — FOUND on rows 1/2/3/4/5 Notes columns
|
||||
- Commit `60654af` — FOUND in `git log`
|
||||
- No source code files touched (plan constraint) — only `.planning/phases/04-script-generation/04-VALIDATION.md` modified
|
||||
@@ -0,0 +1,90 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 05
|
||||
type: execute
|
||||
wave: 5
|
||||
depends_on: [08-04]
|
||||
files_modified:
|
||||
- .planning/phases/05-package-export/05-VALIDATION.md
|
||||
autonomous: true
|
||||
requirements: [NYQ-01]
|
||||
must_haves:
|
||||
truths:
|
||||
- "Phase 5 VALIDATION.md contains a Nyquist Record with exactly one observable check per Phase 5 success criterion"
|
||||
- "Every Phase 5 row cites evidence from the accepted evidence types"
|
||||
- "Byte-level .intunewin conformance row cites Phase 10 RTVAL-01 (tenant ingestion PASS)"
|
||||
- "Phase 5 frontmatter has nyquist_audited + nyquist_auditor"
|
||||
artifacts:
|
||||
- path: ".planning/phases/05-package-export/05-VALIDATION.md"
|
||||
provides: "Phase 5 Nyquist Record table + updated frontmatter"
|
||||
contains: "## Nyquist Record"
|
||||
key_links:
|
||||
- from: ".planning/phases/05-package-export/05-VALIDATION.md"
|
||||
to: ".planning/phases/10-real-world-runtime-validation/10-RUNTIME-VALIDATION.md"
|
||||
via: "RTVAL-01 tenant ingestion evidence"
|
||||
pattern: "RTVAL-01"
|
||||
---
|
||||
|
||||
<objective>
|
||||
Audit Phase 5 (Package Export, PKG-01..05) against Nyquist rules. Upgrade `05-VALIDATION.md` in place. The .intunewin byte-layout criterion gets its strongest evidence from Phase 10 RTVAL-01 (tenant ingestion PASS on fixed build, commits 74535ea + 7716246).
|
||||
|
||||
Purpose: Fifth of 7 per-phase audits feeding the milestone index.
|
||||
Output: Upgraded `.planning/phases/05-package-export/05-VALIDATION.md`.
|
||||
</objective>
|
||||
|
||||
<execution_context>
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/workflows/execute-plan.md
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/templates/summary.md
|
||||
</execution_context>
|
||||
|
||||
<context>
|
||||
@.planning/ROADMAP.md
|
||||
@.planning/STATE.md
|
||||
@.planning/REQUIREMENTS.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-CONTEXT.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-04-SUMMARY.md
|
||||
@.planning/milestones/v1.0-ROADMAP.md
|
||||
@.planning/phases/05-package-export/05-VALIDATION.md
|
||||
@.planning/phases/05-package-export/05-VERIFICATION.md
|
||||
@.planning/phases/05-package-export/05-01-SUMMARY.md
|
||||
@.planning/phases/05-package-export/05-02-SUMMARY.md
|
||||
</context>
|
||||
|
||||
<tasks>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 1: Build Phase 5 Nyquist Record and upgrade 05-VALIDATION.md</name>
|
||||
<files>.planning/phases/05-package-export/05-VALIDATION.md</files>
|
||||
<action>
|
||||
Apply the established methodology:
|
||||
1. Extract Phase 5 (PKG-01..05) success criteria from `.planning/milestones/v1.0-ROADMAP.md`.
|
||||
2. One observable check per criterion; evidence in priority order.
|
||||
3. Preserve all existing sections; append `## Nyquist Record`.
|
||||
4. For byte-level .intunewin conformance: cite commits 74535ea (HMAC over IV+ciphertext) and 7716246 (Detection.xml alignment) plus Phase 10 RTVAL-01 PASS (tenant ingestion confirmation). This is the only strong artifact-backed runtime row in Phase 10 per STATE.md.
|
||||
5. For Phase 5 test evidence, consult `tests/test_intunewin.py` and `tests/test_packages.py` (visible in git status) for test names.
|
||||
6. Update frontmatter.
|
||||
</action>
|
||||
<verify>
|
||||
<automated>grep -q "^## Nyquist Record" .planning/phases/05-package-export/05-VALIDATION.md && grep -q "nyquist_audited:" .planning/phases/05-package-export/05-VALIDATION.md</automated>
|
||||
</verify>
|
||||
<done>
|
||||
05-VALIDATION.md has a complete Nyquist Record, byte-level conformance row cites RTVAL-01 evidence, and frontmatter is updated.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
</tasks>
|
||||
|
||||
<verification>
|
||||
- `## Nyquist Record` section exists in 05-VALIDATION.md
|
||||
- Row count matches Phase 5 success criteria
|
||||
- Byte-layout row references RTVAL-01 or commits 74535ea / 7716246
|
||||
- Frontmatter has nyquist_audited + nyquist_auditor keys
|
||||
</verification>
|
||||
|
||||
<success_criteria>
|
||||
Phase 5 Nyquist audit complete.
|
||||
</success_criteria>
|
||||
|
||||
<output>
|
||||
After completion, create `.planning/phases/08-nyquist-validation-track/08-05-SUMMARY.md`
|
||||
</output>
|
||||
@@ -0,0 +1,144 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 05
|
||||
subsystem: validation-audit
|
||||
tags: [nyquist, audit, phase-5, package-export, intunewin, rtval-01, historical-gap-closure]
|
||||
requires:
|
||||
- phase: 08-04
|
||||
provides: "Phase 4 Nyquist Record pattern + attestation-gap recording methodology"
|
||||
- phase: 10-02
|
||||
provides: "RTVAL-01 artifact-backed tenant ingestion PASS on rubis.fr (commits 74535ea + 7716246)"
|
||||
- phase: 06
|
||||
provides: "PKG-04 historical gap closure (icon embedding in .intunewin via TestIntunewinIconInclusion)"
|
||||
provides:
|
||||
- "Phase 5 Nyquist Record (5 rows, all pass) in .planning/phases/05-package-export/05-VALIDATION.md"
|
||||
- "Phase 5 nyquist_compliant=true audited 2026-04-13"
|
||||
- "First row in the 7-phase Nyquist audit with artifact-backed live-tenant runtime evidence (PKG-02 -> RTVAL-01)"
|
||||
- "PKG-04 historical icon-embedding gap recorded in place with Phase 6 closure citation"
|
||||
affects:
|
||||
- .planning/phases/05-package-export/05-VALIDATION.md
|
||||
tech_stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Nyquist Record audit table reused from 08-01/02/03/04: # | Criterion | Observable Check | Evidence | Status | Notes"
|
||||
- "Artifact-backed runtime citation pattern: cite RTVAL screenshots + committed evidence package + fixing commit SHAs"
|
||||
- "Historical-gap closure pattern (mirrors 08-02 row 6): record gap in place, cite closing phase + closing test, keep status pass"
|
||||
key_files:
|
||||
created:
|
||||
- .planning/phases/08-nyquist-validation-track/08-05-SUMMARY.md
|
||||
modified:
|
||||
- .planning/phases/05-package-export/05-VALIDATION.md
|
||||
decisions:
|
||||
- "Derived 5 rows: one per PKG-0x success criterion from v1.0-ROADMAP.md Phase 5 (PKG-01..05). No extra historical-gap bonus rows — PKG-04 gap is recorded inside row 4 itself (not as a separate row) because the criterion wording covers both upload + embedding."
|
||||
- "Row 2 (PKG-02 byte-level .intunewin conformance) is the STRONGEST row in the entire 7-phase Nyquist audit track. It cites 14 pytest byte-level assertions PLUS RTVAL-01 artifact-backed PASS on tenant rubis.fr (2026-04-13) with committed screenshots and the exact .intunewin package under test. The preamble explicitly calls out that RTVAL-01 initially FAILED and was fixed by commits 74535ea (HMAC over IV+ciphertext) + 7716246 (Detection.xml alignment with IntuneWinAppUtil.exe reference format) — this is the audit-trail equivalent of 'caught and fixed before real deployment'."
|
||||
- "Row 1 (PKG-01 one-click .intunewin export) also cites RTVAL-01 but the success criterion is 'user can export'; the 'Intune accepts the package' piece is more directly owned by PKG-02. Row 1 therefore cites RTVAL-01 as supporting evidence without the structural-fix commentary (that belongs to PKG-02)."
|
||||
- "Row 4 (PKG-04 icon upload + embedding) records the historical gap IN PLACE rather than flipping to fail-fix-v1.1. Phase 5 plan 02 shipped icon upload + storage only; Phase 6 (Wire Icon into .intunewin Export) added TestIntunewinIconInclusion which closes the embedding half. This mirrors the 08-02 row 6 (drivers/upload 500 historical gap closed by Phase 9 UX-01) pattern explicitly approved in the plan 08-02 methodology."
|
||||
- "Row 3 (PKG-03 NinjaRMM ZIP) has no Phase 10 runtime evidence and does not need any — NinjaRMM packages are opaque ZIPs fed into the customer's RMM, there is no Microsoft format spec to defend against. Template-level + HTTP-level correctness via pytest is sufficient for Nyquist. Phase 11 rollout owns real NinjaRMM execution."
|
||||
- "Row 5 (PKG-05 command preview) cites TestCommandPreview class + template IDs + 05-VERIFICATION.md truths 9+10+11. The Alpine.js copy-to-clipboard UX remains a Manual-Only Verification (listed in 05-VERIFICATION.md 'Human Verification Required #2') and was NOT exercised in Phase 10 — Phase 10 did not cover browser reactivity. The minor 'Uninstall copy' label cosmetic issue flagged in 05-VERIFICATION.md Anti-Patterns is noted as UX polish, not a correctness defect."
|
||||
- "No historical-gap BONUS rows (unlike 08-02 row 6). PKG-04's gap is already the 'canonical' Phase 5 row 4, not a bonus row, because the success criterion itself covers both upload and embedding."
|
||||
metrics:
|
||||
tasks_completed: 1
|
||||
tasks_total: 1
|
||||
duration_minutes: 6
|
||||
completed_date: 2026-04-13
|
||||
requirements_completed: [NYQ-01]
|
||||
---
|
||||
|
||||
# Phase 08 Plan 05: Phase 5 Nyquist Audit Summary
|
||||
|
||||
**One-liner:** Audited Phase 5 (Package Export, PKG-01..05) against Nyquist rules and upgraded `05-VALIDATION.md` in place with a 5-row Nyquist Record where PKG-02 (byte-level `.intunewin` conformance) becomes the **first and only artifact-backed live-Intune-tenant runtime row** in the entire 7-phase audit track — citing RTVAL-01 PASS on rubis.fr after commits `74535ea` + `7716246` fixed the two structural defects (HMAC over IV+ciphertext, Detection.xml alignment) that caused the initial FAIL — and PKG-04's historical icon-embedding gap is recorded in place with Phase 6 closure (`TestIntunewinIconInclusion`) cited.
|
||||
|
||||
## What Shipped
|
||||
|
||||
- `.planning/phases/05-package-export/05-VALIDATION.md` now contains a `## Nyquist Record` section (placed above Validation Sign-Off, below Manual-Only Verifications).
|
||||
- 5 rows: one per PKG-0x success criterion from `milestones/v1.0-ROADMAP.md` Phase 5 goal block (PKG-01..05).
|
||||
- Every row has a non-empty Observable Check (pytest invocation) and a non-empty Evidence cell citing committed tests, source paths with line numbers, commit SHAs, 05-VERIFICATION.md truths, and — for PKG-01 + PKG-02 — Phase 10 `RUNTIME-VALIDATION.md` RTVAL-01 artifact-backed PASS.
|
||||
- **Row 2 (PKG-02) is the strongest row of the entire 7-phase Nyquist track:** 14 byte-level pytest assertions in `tests/test_intunewin.py` PLUS artifact-backed tenant acceptance (screenshots `rtval-01-tenant-upload.png` + `rtval-01-app-assigned.png`, committed package `Copieur_2eme.intunewin`, tenant `rubis.fr`, test device `ARES-5CG5220YTM`). The preamble explicitly narrates the initial FAIL → root cause → fix → re-test PASS arc so the audit trail shows "caught and fixed before broad deployment".
|
||||
- **Row 4 (PKG-04) records the icon-embedding historical gap in place** and cites Phase 6 closure via `tests/test_packages.py::TestIntunewinIconInclusion::test_intunewin_includes_icon` + `::test_intunewin_without_icon_succeeds`. Status remains `pass` — this mirrors the 08-02 row 6 (drivers/upload 500 → Phase 9 UX-01 closure) methodology.
|
||||
- Frontmatter updated: `nyquist_compliant: false -> true`, added `nyquist_audited: 2026-04-13`, `nyquist_auditor: Claude (gsd-executor, plan 08-05)`.
|
||||
- All historical sections (Test Infrastructure, Sampling Rate, Per-Task Verification Map, Wave 0 Requirements, Manual-Only Verifications, Validation Sign-Off) preserved verbatim. Sign-Off checkbox for `nyquist_compliant: true` ticked.
|
||||
|
||||
## Audit Outcome
|
||||
|
||||
| Status | Count |
|
||||
|---------------|-------|
|
||||
| pass | 5 |
|
||||
| fail-fix-v1.1 | 0 |
|
||||
| deferred-v1.2 | 0 |
|
||||
| wont-do | 0 |
|
||||
|
||||
Phase 5 is Nyquist-compliant. Uniquely among the 7 v1.0 phases audited so far, Phase 5 row 2 (PKG-02) carries **artifact-backed** real-tenant runtime evidence via RTVAL-01 — no attestation-only caveat on this row. Rows 1 + 4 also benefit from RTVAL-01 as supporting evidence.
|
||||
|
||||
## Evidence Strategy Used
|
||||
|
||||
Priority order from CONTEXT.md honored:
|
||||
|
||||
1. **Test evidence** (preferred): 5/5 rows cite concrete pytest invocations. PKG-02 cites 14 byte-level assertions in `tests/test_intunewin.py` across 5 test classes (`TestOuterZipStructure`, `TestDetectionXml`, `TestEncryptedBlobLayout`, `TestCryptographicVerification`, unencrypted size). PKG-01/03 cite `tests/test_packages.py` (`TestIntunewinDownload`, `TestNinjaDownload`). PKG-04 cites both `tests/test_icon_upload.py` (upload half) and `tests/test_packages.py::TestIntunewinIconInclusion` (embedding half). PKG-05 cites `tests/test_packages.py::TestCommandPreview`.
|
||||
2. **Commit/file-line evidence**: `imptune/api/packages.py` (get_ninja_package lines 49-94, get_intunewin_package lines 97-158), `imptune/generators/intunewin_builder.py` (build_intunewin, AES-256-CBC, HMAC-SHA256, Detection.xml), `imptune/api/icons.py` (Pillow validation lines 41-74), `imptune/api/pages.py` (lines 102-103 command context), `imptune/templates/printer_detail.html` (install-cmd/uninstall-cmd IDs lines 31/40, export hrefs lines 49-50). Commits cited: `a31c71e` (05-01 RED), `dd6cedf` (05-01 GREEN), `d8ce223` (05-02 icon RED), `f9e13ba` (05-02 icon GREEN), `f96ea6f` (05-02 UI), and critically `74535ea` + `7716246` (the two structural fixes that flipped RTVAL-01 from FAIL to PASS).
|
||||
3. **Dated manual-check evidence**: 05-VERIFICATION.md (2026-04-10, 11/11 truths VERIFIED) referenced per-row for cross-traceability.
|
||||
4. **Runtime evidence (artifact-backed)**: Phase 10 `RUNTIME-VALIDATION.md` RTVAL-01 PASS cited on rows 1 + 2 + 4 — with committed screenshots and package, no attestation-only caveat. Plan 10-03 sign-off (commit `cd2df1e`) cited as formal acceptance.
|
||||
|
||||
No row relied on "code looks right" or attestation-only runtime — every row has a concrete pytest invocation, and PKG-02 additionally has artifact-backed real-tenant proof.
|
||||
|
||||
## Cross-Reference with 05-VERIFICATION.md
|
||||
|
||||
`05-VERIFICATION.md` (dated 2026-04-10) enumerated 11 observable truths covering PKG-01..05. The Nyquist Record collapses these to 5 rows (one per criterion) as follows:
|
||||
|
||||
- Row 1 (PKG-01) ← truth 2 (intunewin endpoint), truth 5 (build_intunewin native), truth 3 (404/422 error paths)
|
||||
- Row 2 (PKG-02) ← truth 5 (Python-native no subprocess) + 14 `tests/test_intunewin.py` byte-level truths + RTVAL-01 artifact evidence
|
||||
- Row 3 (PKG-03) ← truths 1 (ZIP contains install + drivers) + 4 (DEFLATE + folder structure)
|
||||
- Row 4 (PKG-04) ← truths 6+7+8 (icon upload/validation/replace) + Phase 6 TestIntunewinIconInclusion (icon embedding half, gap closure)
|
||||
- Row 5 (PKG-05) ← truths 9 (command strings rendered) + 10 (copy buttons present) + 11 (export links present)
|
||||
|
||||
The "Human Verification Required" items from 05-VERIFICATION.md map as follows:
|
||||
- #1 ".intunewin byte-level Intune compatibility" → **CLOSED** by RTVAL-01 artifact-backed PASS (row 2)
|
||||
- #2 "Alpine.js copy-to-clipboard UX" → still Manual-Only (row 5 Notes), owned by Phase 11 rollout visual polish
|
||||
- #3 "HTMX icon upload response swap" → still Manual-Only (row 4 Notes), owned by Phase 11 rollout visual polish
|
||||
|
||||
## Artifact-Backed Evidence Highlight (Key Point for 08-08 Rollup)
|
||||
|
||||
Per STATE.md 2026-04-13, **Phase 10 RTVAL-01 is the only artifact-backed runtime check** across the entire Phase 10 runtime half (RTVAL-02/03/04 are all attestation-only, 3 consecutive). This Phase 5 audit is therefore the **unique beneficiary** of strong real-tenant runtime evidence in the entire 7-phase Nyquist track. When 08-08 rolls up the milestone Nyquist summary, it should note:
|
||||
|
||||
- Phase 5 PKG-02: **artifact-backed runtime** (committed screenshots + package + tenant confirmation)
|
||||
- Phase 5 PKG-01 + PKG-04: artifact-backed runtime via PKG-02's transitive coverage (same builder path)
|
||||
- Phase 1 row 14: artifact-backed via RTVAL-01 tenant ingestion (dev environment + infra check)
|
||||
- All Phase 4 SCRPT-0x rows: attestation-only runtime (RTVAL-02/03/04)
|
||||
- All Phase 2/3/6/7 rows: no Phase 10 runtime coverage at all (purely template/HTTP level)
|
||||
|
||||
The two fix commits `74535ea` + `7716246` are the most important artifacts this audit surfaces — they represent real defects that real-Intune testing caught and that the team fixed before broad rollout. This is exactly the workflow Nyquist validation exists to produce.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
**None.** Plan 08-05 executed exactly as written. Single task, single file edit. The plan explicitly instructed: *"For byte-level .intunewin conformance: cite commits 74535ea and 7716246 plus Phase 10 RTVAL-01 PASS. This is the only strong artifact-backed runtime row in Phase 10 per STATE.md."* — done on row 2. The plan also instructed to consult `tests/test_intunewin.py` and `tests/test_packages.py` for test names — done via Grep to confirm `TestOuterZipStructure`, `TestDetectionXml`, `TestEncryptedBlobLayout`, `TestCryptographicVerification`, `TestNinjaDownload`, `TestIntunewinDownload`, `TestCommandPreview`, `TestIntunewinIconInclusion`.
|
||||
|
||||
No Rule 1-4 deviations triggered. No auth gates.
|
||||
|
||||
## Authentication Gates
|
||||
|
||||
None.
|
||||
|
||||
## Task Commits
|
||||
|
||||
1. **Task 1: Build Phase 5 Nyquist Record and upgrade 05-VALIDATION.md** — `cecf917` (docs)
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
- `.planning/phases/05-package-export/05-VALIDATION.md` — added `## Nyquist Record` section (5 rows, preamble, outcome), updated frontmatter (`nyquist_compliant: true`, `nyquist_audited`, `nyquist_auditor`), ticked Sign-Off checkbox
|
||||
- `.planning/phases/08-nyquist-validation-track/08-05-SUMMARY.md` — this file
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- 5/8 plans of Phase 08 complete (08-01..08-05 audited: Phase 1, 2, 3, 4, 5)
|
||||
- Remaining: 08-06 (Phase 6 gap-closure audit), 08-07 (Phase 7 gap-closure audit), 08-08 (milestone rollup index)
|
||||
- 08-06 should be quick: Phase 6 is a single-plan gap-closure phase that closed PKG-04 icon embedding, already referenced in this audit's row 4
|
||||
- 08-08 rollup should explicitly highlight PKG-02 as the strongest artifact-backed row in the track
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- `.planning/phases/05-package-export/05-VALIDATION.md` — FOUND (modified)
|
||||
- `## Nyquist Record` heading — FOUND in file (grep returned 1 match)
|
||||
- `nyquist_audited:` frontmatter key — FOUND in file
|
||||
- `RTVAL-01` citation — FOUND on rows 1, 2, 4
|
||||
- Commits `74535ea` + `7716246` cited — FOUND in row 2 evidence
|
||||
- Commit `cecf917` (Task 1) — FOUND in `git log` via `git rev-parse --short HEAD`
|
||||
- No source code files touched (plan constraint) — only `.planning/phases/05-package-export/05-VALIDATION.md` modified
|
||||
@@ -0,0 +1,85 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 06
|
||||
type: execute
|
||||
wave: 6
|
||||
depends_on: [08-05]
|
||||
files_modified:
|
||||
- .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||||
autonomous: true
|
||||
requirements: [NYQ-01]
|
||||
must_haves:
|
||||
truths:
|
||||
- "Phase 6 VALIDATION.md contains a Nyquist Record with exactly one observable check per Phase 6 success criterion"
|
||||
- "Every Phase 6 row cites evidence from the accepted evidence types"
|
||||
- "Phase 6 frontmatter has nyquist_audited + nyquist_auditor"
|
||||
artifacts:
|
||||
- path: ".planning/phases/06-wire-icon-intunewin/06-VALIDATION.md"
|
||||
provides: "Phase 6 Nyquist Record table + updated frontmatter"
|
||||
contains: "## Nyquist Record"
|
||||
key_links:
|
||||
- from: ".planning/phases/06-wire-icon-intunewin/06-VALIDATION.md"
|
||||
to: ".planning/milestones/v1.0-ROADMAP.md"
|
||||
via: "one row per Phase 6 success criterion"
|
||||
pattern: "## Nyquist Record"
|
||||
---
|
||||
|
||||
<objective>
|
||||
Audit Phase 6 (Wire Icon into .intunewin — a gap closure phase from v1.0) against Nyquist rules. Upgrade `06-VALIDATION.md` in place.
|
||||
|
||||
Purpose: Sixth of 7 per-phase audits feeding the milestone index.
|
||||
Output: Upgraded `.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md`.
|
||||
</objective>
|
||||
|
||||
<execution_context>
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/workflows/execute-plan.md
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/templates/summary.md
|
||||
</execution_context>
|
||||
|
||||
<context>
|
||||
@.planning/ROADMAP.md
|
||||
@.planning/STATE.md
|
||||
@.planning/REQUIREMENTS.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-CONTEXT.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-05-SUMMARY.md
|
||||
@.planning/milestones/v1.0-ROADMAP.md
|
||||
@.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||||
@.planning/phases/06-wire-icon-intunewin/06-VERIFICATION.md
|
||||
</context>
|
||||
|
||||
<tasks>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 1: Build Phase 6 Nyquist Record and upgrade 06-VALIDATION.md</name>
|
||||
<files>.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md</files>
|
||||
<action>
|
||||
Apply the established methodology:
|
||||
1. Extract Phase 6 success criteria from `.planning/milestones/v1.0-ROADMAP.md` (this is a gap-closure phase so criteria may be narrower than the earlier build phases — audit what actually exists there).
|
||||
2. One observable check per criterion; evidence in priority order.
|
||||
3. Locate the SUMMARY files in the phase directory (ls the phase dir first — Phase 6 was a single-plan gap closure) and extract evidence citations from them.
|
||||
4. Preserve all existing sections; append `## Nyquist Record`.
|
||||
5. Update frontmatter.
|
||||
</action>
|
||||
<verify>
|
||||
<automated>grep -q "^## Nyquist Record" .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md && grep -q "nyquist_audited:" .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md</automated>
|
||||
</verify>
|
||||
<done>
|
||||
06-VALIDATION.md has a complete Nyquist Record matching Phase 6 success criteria, evidence cited, frontmatter updated.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
</tasks>
|
||||
|
||||
<verification>
|
||||
- `## Nyquist Record` section exists in 06-VALIDATION.md
|
||||
- Row count matches Phase 6 success criteria
|
||||
- Frontmatter has nyquist_audited + nyquist_auditor keys
|
||||
</verification>
|
||||
|
||||
<success_criteria>
|
||||
Phase 6 Nyquist audit complete.
|
||||
</success_criteria>
|
||||
|
||||
<output>
|
||||
After completion, create `.planning/phases/08-nyquist-validation-track/08-06-SUMMARY.md`
|
||||
</output>
|
||||
@@ -0,0 +1,136 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 06
|
||||
subsystem: validation-audit
|
||||
tags: [nyquist, audit, phase-6, gap-closure, pkg-04, icon-embedding, rtval-01-transitive]
|
||||
requires:
|
||||
- phase: 08-05
|
||||
provides: "Phase 5 Nyquist Record pattern + PKG-04 historical-gap-closure citation direction (05 -> 06 -> back)"
|
||||
- phase: 06
|
||||
provides: "Single-plan gap closure (TestIntunewinIconInclusion + shutil.copy2 icon staging) that closed PKG-04"
|
||||
- phase: 10-02
|
||||
provides: "RTVAL-01 artifact-backed tenant ingestion PASS on rubis.fr — transitive evidence that build_intunewin path (with icon wiring live) is accepted by real Intune"
|
||||
provides:
|
||||
- "Phase 6 Nyquist Record (1 row, pass) in .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md"
|
||||
- "Phase 6 nyquist_compliant=true audited 2026-04-13"
|
||||
- "Shortest Nyquist Record in the 7-phase audit track (1 row) reflecting single-criterion gap-closure phase structure"
|
||||
affects:
|
||||
- .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||||
tech_stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Nyquist Record single-row variant for single-requirement gap-closure phase"
|
||||
- "Transitive runtime evidence pattern: cite RTVAL-01 as supporting (not primary) because its observable check did not directly target the criterion"
|
||||
- "Bidirectional gap closure citation: 05-VALIDATION row 4 cites 06 test; 06-VALIDATION row 1 cites same test — the two phases form a closed loop"
|
||||
key_files:
|
||||
created:
|
||||
- .planning/phases/08-nyquist-validation-track/08-06-SUMMARY.md
|
||||
modified:
|
||||
- .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||||
decisions:
|
||||
- "One row only: Phase 6 goal block in v1.0-ROADMAP.md enumerates exactly one requirement (PKG-04) and one plan (06-01). No sub-criteria to decompose. Single-row Nyquist Record is correct — padding with derived sub-rows would dilute audit signal."
|
||||
- "RTVAL-01 cited as SUPPORTING (not primary) evidence. The observable check of RTVAL-01 was 'tenant accepts .intunewin package', not 'icon appears on Intune app tile'. Primary evidence remains pytest (TestIntunewinIconInclusion x2) plus source review of imptune/api/packages.py lines 149-157 plus TDD commits 2723cc8 (RED) and 6310be5 (GREEN). RTVAL-01 is added because the test package was built with the icon-wiring code live, so Intune's successful ingestion transitively proves the icon staging does not corrupt the .intunewin output."
|
||||
- "Icon-tile visual rendering deferred to Phase 11 rollout Manual-Only polish. This mirrors 05-VALIDATION.md row 4 notes and 05-VERIFICATION.md 'Human Verification Required #3' (HTMX icon upload response swap). Cosmetic confirmation of the icon actually displaying on the Intune portal app tile is NOT needed for Nyquist compliance because the audit-level question is 'does the mechanism wire the icon into the package', which is fully proven by pytest + source review."
|
||||
- "No historical-gap row needed. Phase 6 IS the gap closure — recording the gap here would be circular. Instead, the 08-05 row 4 citation already documents the PKG-04 historical gap in place (in 05-VALIDATION.md) with Phase 6 as closure. The two VALIDATION files form a closed-loop citation graph that any reader can traverse in either direction."
|
||||
- "Shortest Nyquist Record in the 7-phase audit track so far. Audit rows by phase: Phase 1 = 14, Phase 2 = 6, Phase 3 = 10, Phase 4 = 5, Phase 5 = 5, Phase 6 = 1. Phase 7 (plan 08-07) also expected to be small because it is the other single-plan gap-closure phase (/packages 404 + dashboard wiring). The 08-08 rollup should explicitly note that row count is not a quality metric — single-criterion phases legitimately produce single-row audits."
|
||||
metrics:
|
||||
tasks_completed: 1
|
||||
tasks_total: 1
|
||||
duration_minutes: 4
|
||||
completed_date: 2026-04-13
|
||||
requirements_completed: [NYQ-01]
|
||||
---
|
||||
|
||||
# Phase 08 Plan 06: Phase 6 Nyquist Audit Summary
|
||||
|
||||
**One-liner:** Audited Phase 6 (Wire Icon into `.intunewin` Export — single-requirement gap-closure phase) against Nyquist rules and upgraded `06-VALIDATION.md` in place with a **1-row** Nyquist Record covering PKG-04 icon embedding, citing the `TestIntunewinIconInclusion` pair (TDD commits `2723cc8` + `6310be5`), the `shutil.copy2` staging at `imptune/api/packages.py:153` before `build_intunewin` at `:157`, and — as supporting transitive evidence — Phase 10 RTVAL-01 artifact-backed tenant acceptance of the exact builder path with icon wiring live.
|
||||
|
||||
## What Shipped
|
||||
|
||||
- `.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md` now contains a `## Nyquist Record` section (placed above Validation Sign-Off, below Manual-Only Verifications — same position as prior audits).
|
||||
- **1 row:** PKG-04 icon embedding. Phase 6 has exactly one success criterion in `v1.0-ROADMAP.md` and one plan (06-01), so the Nyquist Record is intentionally single-row.
|
||||
- Row evidence:
|
||||
- **Primary:** `tests/test_packages.py::TestIntunewinIconInclusion::test_intunewin_includes_icon` (lines 200-231) + `::test_intunewin_without_icon_succeeds` (lines 233-245). Monkeypatched `build_intunewin` captures staged file list, asserts `icon.png` present.
|
||||
- **Source:** `imptune/api/packages.py` line 149 (`Icon.get_or_none`), line 151 (`cfg.ICONS_DIR`), line 153 (`shutil.copy2` as `icon.png`), line 157 (`build_intunewin` call — staging-before-build ordering confirmed), imports at line 13.
|
||||
- **Commits:** `2723cc8` (06-01 TDD RED, failing test) + `6310be5` (06-01 TDD GREEN, 4-line icon staging block).
|
||||
- **Dated manual check:** 06-VERIFICATION.md (2026-04-10) — 2/2 truths VERIFIED, all key links WIRED, PKG-04 SATISFIED, zero anti-patterns, 96/96 full suite green.
|
||||
- **Supporting transitive runtime:** Phase 10 `RUNTIME-VALIDATION.md` RTVAL-01 PASS on tenant rubis.fr (2026-04-13) — same `build_intunewin` path with icon-wiring code live; tenant accepted package `Copieur_2eme.intunewin` after fix commits `74535ea` + `7716246`.
|
||||
- **Status:** pass (1/1).
|
||||
- Frontmatter: `nyquist_compliant: false -> true`, added `nyquist_audited: 2026-04-13`, `nyquist_auditor: Claude (gsd-executor, plan 08-06)`.
|
||||
- All Phase 6 existing sections preserved verbatim (Test Infrastructure, Sampling Rate, Per-Task Verification Map, Wave 0 Requirements, Manual-Only Verifications). Sign-Off checkboxes ticked.
|
||||
|
||||
## Audit Outcome
|
||||
|
||||
| Status | Count |
|
||||
|---------------|-------|
|
||||
| pass | 1 |
|
||||
| fail-fix-v1.1 | 0 |
|
||||
| deferred-v1.2 | 0 |
|
||||
| wont-do | 0 |
|
||||
|
||||
Phase 6 is Nyquist-compliant. Shortest Nyquist Record in the 7-phase audit track — a legitimate reflection of the phase's single-criterion gap-closure structure, not an audit quality deficit.
|
||||
|
||||
## Evidence Strategy Used
|
||||
|
||||
Priority order from CONTEXT.md honored:
|
||||
|
||||
1. **Test evidence (primary):** `TestIntunewinIconInclusion` pair in `tests/test_packages.py`. Both tests concrete, both passing, one is the canonical RED-to-GREEN TDD assertion.
|
||||
2. **Commit/file-line evidence:** `imptune/api/packages.py:149-157` (Icon lookup → ICONS_DIR path → shutil.copy2 → build_intunewin ordering). TDD commits `2723cc8` + `6310be5` explicitly cited.
|
||||
3. **Dated manual-check evidence:** 06-VERIFICATION.md (2026-04-10) — 2/2 truths VERIFIED with line-number citations back to test_packages.py.
|
||||
4. **Runtime evidence (transitive, supporting only):** RTVAL-01 cited as supporting because its observable check targeted tenant ingestion, not icon-tile visual rendering. Still valuable because the test package was built with icon wiring live, so successful ingestion transitively proves the icon staging does not corrupt the `.intunewin` output.
|
||||
|
||||
No row relied on "code looks right" alone.
|
||||
|
||||
## Bidirectional Gap-Closure Citation Loop
|
||||
|
||||
Phase 5 VALIDATION row 4 cites the Phase 6 `TestIntunewinIconInclusion` tests as its "closed by" evidence for the PKG-04 historical gap. Phase 6 VALIDATION row 1 cites the same tests as its canonical primary evidence. Readers traversing either direction land on the same proof, forming a closed loop. This is the first time in the audit track where two adjacent phase VALIDATION files reference each other's closure evidence — a pattern worth highlighting in 08-08 rollup as a model for future gap-closure phases.
|
||||
|
||||
## Cross-Reference with 06-VERIFICATION.md
|
||||
|
||||
06-VERIFICATION.md (2026-04-10) enumerated 2 observable truths, both VERIFIED:
|
||||
|
||||
- Truth 1 (icon.png in staging when icon uploaded) ← Nyquist row 1 primary evidence (test_intunewin_includes_icon)
|
||||
- Truth 2 (export succeeds without error when no icon) ← Nyquist row 1 primary evidence (test_intunewin_without_icon_succeeds baseline)
|
||||
|
||||
Both collapse into the single Nyquist row because both test the same PKG-04 criterion from complementary angles (positive + baseline).
|
||||
|
||||
No "Human Verification Required" items in 06-VERIFICATION.md — the only residual manual item (does the icon actually render on the Intune portal app tile) is tracked in 05-VALIDATION.md row 4 notes and 05-VERIFICATION.md "Human Verification Required #3", consistent with where the upload UX originates.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
**None.** Plan 08-06 executed exactly as written. Single task, single file edit. The plan explicitly anticipated that Phase 6 success criteria "may be narrower than the earlier build phases — audit what actually exists there" — confirmed: exactly 1 criterion, 1 row. `ls .planning/phases/06-wire-icon-intunewin/` returned a single plan (06-01), consistent with the plan's single-plan expectation.
|
||||
|
||||
No Rule 1-4 deviations triggered. No auth gates.
|
||||
|
||||
## Authentication Gates
|
||||
|
||||
None.
|
||||
|
||||
## Task Commits
|
||||
|
||||
1. **Task 1: Build Phase 6 Nyquist Record and upgrade 06-VALIDATION.md** — `bb62174` (docs)
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
- `.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md` — added `## Nyquist Record` section (1 row, preamble, outcome table), updated frontmatter (`nyquist_compliant: true`, `nyquist_audited`, `nyquist_auditor`), ticked Sign-Off checkboxes
|
||||
- `.planning/phases/08-nyquist-validation-track/08-06-SUMMARY.md` — this file
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- 6/8 plans of Phase 08 complete (08-01..08-06 audited: Phases 1, 2, 3, 4, 5, 6)
|
||||
- Remaining: 08-07 (Phase 7 gap-closure audit — dashboard + `/packages` route), 08-08 (milestone rollup index)
|
||||
- 08-07 should be similarly concise: Phase 7 is also a single-plan gap-closure phase (no v1.0 requirements, pure UX/integration fixes). Expect 1-3 rows depending on whether 08-07 decomposes the goal into observable sub-checks.
|
||||
- 08-08 rollup should note:
|
||||
- Phase 5 PKG-02 = only artifact-backed live-tenant runtime row in the track (strongest row)
|
||||
- Phase 6 PKG-04 = bidirectional gap-closure citation loop with 05-VALIDATION row 4
|
||||
- Row count is not a quality metric — single-criterion phases legitimately produce single-row audits
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- `.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md` — FOUND (modified)
|
||||
- `## Nyquist Record` heading — FOUND in file (grep returned 1 match via VERIFY_OK)
|
||||
- `nyquist_audited:` frontmatter key — FOUND (grep via VERIFY_OK)
|
||||
- Commit `bb62174` (Task 1) — FOUND via `git rev-parse --short HEAD` returned `bb62174`
|
||||
- Commits `2723cc8` + `6310be5` (Phase 6 TDD) — cited in row 1 evidence
|
||||
- Commit `74535ea` + `7716246` (RTVAL-01 fixes) — cited in supporting runtime evidence
|
||||
- No source code files touched (plan constraint) — only `.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md` modified
|
||||
@@ -0,0 +1,87 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 07
|
||||
type: execute
|
||||
wave: 7
|
||||
depends_on: [08-06]
|
||||
files_modified:
|
||||
- .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||||
autonomous: true
|
||||
requirements: [NYQ-01]
|
||||
must_haves:
|
||||
truths:
|
||||
- "Phase 7 VALIDATION.md contains a Nyquist Record with exactly one observable check per Phase 7 success criterion"
|
||||
- "Every Phase 7 row cites evidence from the accepted evidence types"
|
||||
- "UX-03 individual script download links gap recorded (resolved via Phase 9 / UX-03 or deferred)"
|
||||
- "Phase 7 frontmatter has nyquist_audited + nyquist_auditor"
|
||||
artifacts:
|
||||
- path: ".planning/phases/07-dashboard-nav-polish/07-VALIDATION.md"
|
||||
provides: "Phase 7 Nyquist Record table + updated frontmatter"
|
||||
contains: "## Nyquist Record"
|
||||
key_links:
|
||||
- from: ".planning/phases/07-dashboard-nav-polish/07-VALIDATION.md"
|
||||
to: ".planning/phases/09-ux-tech-debt-closure"
|
||||
via: "UX-03 script download links evidence"
|
||||
pattern: "UX-03|Phase 9"
|
||||
---
|
||||
|
||||
<objective>
|
||||
Audit Phase 7 (Dashboard & Navigation Polish — second v1.0 gap-closure phase) against Nyquist rules. Upgrade `07-VALIDATION.md` in place.
|
||||
|
||||
Purpose: Seventh and last per-phase audit. Completes NYQ-01 coverage across all 7 v1.0 phases.
|
||||
Output: Upgraded `.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md`.
|
||||
</objective>
|
||||
|
||||
<execution_context>
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/workflows/execute-plan.md
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/templates/summary.md
|
||||
</execution_context>
|
||||
|
||||
<context>
|
||||
@.planning/ROADMAP.md
|
||||
@.planning/STATE.md
|
||||
@.planning/REQUIREMENTS.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-CONTEXT.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-06-SUMMARY.md
|
||||
@.planning/milestones/v1.0-ROADMAP.md
|
||||
@.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||||
@.planning/phases/07-dashboard-nav-polish/07-VERIFICATION.md
|
||||
</context>
|
||||
|
||||
<tasks>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 1: Build Phase 7 Nyquist Record and upgrade 07-VALIDATION.md</name>
|
||||
<files>.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md</files>
|
||||
<action>
|
||||
Apply the established methodology:
|
||||
1. Extract Phase 7 success criteria from `.planning/milestones/v1.0-ROADMAP.md`.
|
||||
2. One observable check per criterion; evidence in priority order.
|
||||
3. Preserve all existing sections; append `## Nyquist Record`.
|
||||
4. UX-03 individual script download links was a carried-over gap from Phase 7 (per STATE.md). It is now resolved in Phase 9 / UX-03 (Complete). Cite the Phase 9 fix commit or mark the row pass with a pointer to Phase 9 / UX-03.
|
||||
5. Update frontmatter.
|
||||
</action>
|
||||
<verify>
|
||||
<automated>grep -q "^## Nyquist Record" .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md && grep -q "nyquist_audited:" .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md</automated>
|
||||
</verify>
|
||||
<done>
|
||||
07-VALIDATION.md has a complete Nyquist Record, UX-03 resolution recorded, frontmatter updated.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
</tasks>
|
||||
|
||||
<verification>
|
||||
- `## Nyquist Record` section exists in 07-VALIDATION.md
|
||||
- Row count matches Phase 7 success criteria
|
||||
- UX-03 row references Phase 9
|
||||
- Frontmatter has nyquist_audited + nyquist_auditor keys
|
||||
</verification>
|
||||
|
||||
<success_criteria>
|
||||
Phase 7 Nyquist audit complete. All 7 v1.0 phases now have Nyquist Records — NYQ-01 is fully satisfied once 08-08 verifies the rollup.
|
||||
</success_criteria>
|
||||
|
||||
<output>
|
||||
After completion, create `.planning/phases/08-nyquist-validation-track/08-07-SUMMARY.md`
|
||||
</output>
|
||||
@@ -0,0 +1,168 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 07
|
||||
subsystem: validation-audit
|
||||
tags: [nyquist, audit, phase-7, gap-closure, dashboard, packages-route, ux-03-carryover]
|
||||
requires:
|
||||
- phase: 08-06
|
||||
provides: "Single-plan gap-closure audit template (1-row variant) — 08-07 adapts it to a 3+1-row variant because Phase 7 decomposes its single goal into 3 observable web behaviors"
|
||||
- phase: 07
|
||||
provides: "Single-plan gap closure (GET /packages route + dashboard live queries) — the subject of this audit"
|
||||
- phase: 09-03
|
||||
provides: "UX-03 closure (.ps1 route aliases + printer detail Scripts section) cited as row 4 evidence"
|
||||
provides:
|
||||
- "Phase 7 Nyquist Record (4 rows, 4/4 pass) in .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md"
|
||||
- "Phase 7 nyquist_compliant=true audited 2026-04-13"
|
||||
- "Final per-phase Nyquist audit row in the 7-phase track (NYQ-01 per-phase coverage complete)"
|
||||
- "Historical provenance correction: UX-03 is documented as Phase-5-origin tech debt (per v1.0-ROADMAP.md), not a Phase 7 deliverable, contradicting STATE.md's imprecise 'carried-over gap from Phase 7' restatement"
|
||||
affects:
|
||||
- .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||||
tech_stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Nyquist Record 3+1 variant: 3 in-scope rows for a single-goal phase that fans out into distinct observable behaviors, plus 1 explicit cross-phase carry-over row"
|
||||
- "Single-goal decomposition into multiple observable rows when the narrative goal covers two or more independently-testable behaviors (here: /packages listing + dashboard recent_printers + dashboard recent_packages — three distinct DB queries, three distinct tests)"
|
||||
- "Historical-provenance correction pattern: when STATE.md and plan directive disagree with milestones/v1.0-ROADMAP.md about the origin phase of a deferred item, cite the roadmap and flag the discrepancy in row Notes rather than silently propagating the imprecision"
|
||||
key_files:
|
||||
created:
|
||||
- .planning/phases/08-nyquist-validation-track/08-07-SUMMARY.md
|
||||
modified:
|
||||
- .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||||
decisions:
|
||||
- "Three rows for Phase 7, not one. Unlike Phase 6 which had exactly one REQUIREMENTS.md ID (PKG-04) and collapsed into a single-row record, Phase 7 owns zero REQUIREMENTS.md IDs but its narrative goal ('navigation links work correctly and the dashboard shows real data instead of empty placeholders') fans out into three independently-testable behaviors: /packages 200, dashboard recent_printers live query, dashboard recent_packages live query (with a distinct driver-is-not-null filter predicate). Collapsing these into a single row would hide the filter-correctness observation for row 3 and erase the /packages-vs-dashboard distinction. 07-VERIFICATION.md already decomposed into 3 truths (plus a regression guard truth 4) — the Nyquist Record mirrors that decomposition exactly."
|
||||
- "UX-03 recorded as row 4 (a fourth row specifically for the carry-over), not folded into row 1 or 2. The 08-07 plan directive explicitly asked to 'record UX-03 individual script download links gap (resolved via Phase 9 / UX-03 or deferred)'. Keeping it as a distinct row preserves the closed-loop citation to Phase 9 plan 09-03 (commits d359001 + 68a2935) without contaminating the Phase-7-scope rows."
|
||||
- "UX-03 provenance: v1.0-ROADMAP.md 'Issues Deferred to v1.1' section tags it explicitly as Phase 5. STATE.md and the 08-07 plan text describe it as 'a carried-over gap from Phase 7'. Both cannot be right; the milestone roadmap is the canonical source of truth for historical tech-debt provenance. The Nyquist row Notes document this discrepancy in place rather than silently propagating either version. Resolution status (pass via Phase 9) is unaffected by the provenance question."
|
||||
- "No runtime evidence row. Phase 7 is a pure web-UI HTMX/FastAPI integration fix — the /packages listing page and dashboard live queries are server-side Jinja2 renders consumed by the technician's browser only, never travelling to Intune. RTVAL-01 transitive citation (as used in Phase 6) does not apply because there is no builder path to transit through. Omitting the runtime row is correct, not a gap."
|
||||
- "Phase 7 is a VALIDATION.md quality outlier in one respect: it is the only v1.0 phase whose narrative goal decomposes into multiple observable behaviors without any REQUIREMENTS.md IDs to anchor the decomposition. The Nyquist row count (3 in-scope) was derived by mirroring 07-VERIFICATION.md's observable truth enumeration, which is currently the cleanest authority for 'what Phase 7 actually claims to deliver'. 08-08 rollup should note that REQUIREMENTS.md-free phases are valid Nyquist targets but require an alternate anchoring authority (VERIFICATION.md in this case)."
|
||||
metrics:
|
||||
tasks_completed: 1
|
||||
tasks_total: 1
|
||||
duration_minutes: 6
|
||||
completed_date: 2026-04-13
|
||||
requirements_completed: [NYQ-01]
|
||||
---
|
||||
|
||||
# Phase 08 Plan 07: Phase 7 Nyquist Audit Summary
|
||||
|
||||
**One-liner:** Audited Phase 7 (Dashboard & Navigation Polish — second single-plan gap-closure phase) against Nyquist rules and upgraded `07-VALIDATION.md` in place with a **4-row** Nyquist Record: three in-scope rows for `GET /packages` returning 200, dashboard `recent_printers` live query, and dashboard `recent_packages` driver-filtered live query (all three cite TDD commits `8cf47f5` + `91910ad` and 07-VERIFICATION.md's 4/4 truth verification), plus a fourth cross-phase carry-over row for UX-03 citing Phase 9 plan 09-03 commits `d359001` + `68a2935` — completing per-phase NYQ-01 coverage across all 7 v1.0 phases.
|
||||
|
||||
## What Shipped
|
||||
|
||||
- `.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md` now contains a `## Nyquist Record` section placed between Manual-Only Verifications and Validation Sign-Off (consistent with prior six audits).
|
||||
- **4 rows total:** 3 in-scope (derived from Phase 7 goal decomposition + 07-VERIFICATION.md truths 1/2/3) + 1 cross-phase carry-over (UX-03, per 08-07 plan directive).
|
||||
- Row evidence summary:
|
||||
- **Row 1 (GET /packages 200):** `test_packages_returns_200` (tests/test_static.py:40-43) + `imptune/api/pages.py:142-158` (route + LEFT_OUTER join + `Printer.driver.is_null(False)` filter) + `imptune/templates/packages.html` (new this phase) + `base.html:23` nav link target. Commits: `8cf47f5` RED + `91910ad` GREEN.
|
||||
- **Row 2 (dashboard recent_printers):** `test_dashboard_shows_recent_printers` (tests/test_static.py:46-65) + `imptune/api/pages.py:20-22` (`Printer.select().order_by(Printer.created_at.desc()).limit(5)`) + `imptune/templates/dashboard.html:17-25`. Same commit pair.
|
||||
- **Row 3 (dashboard recent_packages):** `test_dashboard_shows_recent_packages` (tests/test_static.py:68-93) + `imptune/api/pages.py:23-28` (same pattern with `.where(Printer.driver.is_null(False))` filter) + `imptune/templates/dashboard.html:30-39`. Same commit pair.
|
||||
- **Row 4 (UX-03 carry-over):** Phase 9 / plan 09-03 — `imptune/api/scripts.py` `.ps1` route aliases via shared `_install_response()` / `_uninstall_response()` / `_detect_response()` helpers, `imptune/templates/printer_detail.html` Scripts section inside `{% if has_driver %}` guard, `tests/test_script_download.py` (5 tests) + `tests/test_packages.py::TestCommandPreview::test_detail_page_shows_script_links`. Commits: `d359001` RED + `68a2935` GREEN.
|
||||
- All 4 rows cross-verified against 07-VERIFICATION.md (2026-04-13, 4/4 truths VERIFIED, full suite 99/99 green; Phase 9 non-e2e suite 106/106 green).
|
||||
- **Status:** 4/4 pass.
|
||||
- Frontmatter: `nyquist_compliant: false -> true`, added `nyquist_audited: 2026-04-13`, `nyquist_auditor: Claude (gsd-executor, plan 08-07)`.
|
||||
- All Phase 7 existing sections preserved verbatim (Test Infrastructure, Sampling Rate, Per-Task Verification Map, Wave 0 Requirements, Manual-Only Verifications). Sign-Off checkboxes ticked.
|
||||
|
||||
## Audit Outcome
|
||||
|
||||
| Status | Count |
|
||||
|---------------|-------|
|
||||
| pass | 4 |
|
||||
| fail-fix-v1.1 | 0 |
|
||||
| deferred-v1.2 | 0 |
|
||||
| wont-do | 0 |
|
||||
|
||||
Phase 7 is Nyquist-compliant. All four rows pass; zero audit items roll forward to v1.1.
|
||||
|
||||
## Evidence Strategy Used
|
||||
|
||||
Priority order from 08-CONTEXT.md honored across all 4 rows:
|
||||
|
||||
1. **Test evidence (primary, all 4 rows):** Each row cites at least one committed pytest invocation with exact line numbers. Rows 1/2/3 share the same TDD RED/GREEN commit pair (`8cf47f5` + `91910ad`) because they landed atomically in plan 07-01. Row 4 cites the distinct Phase 9 TDD pair (`d359001` + `68a2935`).
|
||||
2. **Source line evidence:** `imptune/api/pages.py:142-158` (row 1 route handler), `pages.py:20-22` (row 2 query), `pages.py:23-28` (row 3 query with filter predicate), `scripts.py` shared helpers (row 4). Templates cited at line granularity where relevant (`dashboard.html:17-25`, `:30-39`, `base.html:23`).
|
||||
3. **Dated manual-check evidence:** 07-VERIFICATION.md (2026-04-13) Truths 1/2/3 VERIFIED with identical source citations — the Nyquist audit and the goal-verification pass independently landed on the same evidence set, which is a strong consistency signal.
|
||||
4. **Runtime evidence:** Deliberately omitted. Phase 7 ships no code that reaches Intune; the /packages listing and dashboard live queries are server-side HTMX/Jinja2 renders consumed by the technician's browser only. RTVAL transitive citation (as used in Phase 6) is not applicable.
|
||||
|
||||
No row relied on "code looks right" alone. Row 4 relies on Phase 9 commits + Phase 9 tests rather than Phase 7 tests because UX-03 was closed in Phase 9 — an intentional cross-phase citation, not a Phase 7 implementation claim.
|
||||
|
||||
## UX-03 Provenance Correction
|
||||
|
||||
STATE.md and the 08-07 plan directive both describe UX-03 as "individual script download links was a carried-over gap from Phase 7". This is imprecise. `.planning/milestones/v1.0-ROADMAP.md` "Issues Deferred to v1.1 (Tech Debt)" section explicitly tags UX-03 as a **Phase 5** deferral: *"No UI links to individual script downloads — only accessible via package export or direct URL (Phase 5)"*. Phase 7's scope was /packages 404 + dashboard queries, neither of which touches the script download link affordance.
|
||||
|
||||
The correction is recorded in two places:
|
||||
- Row 4 Notes column explicitly cites v1.0-ROADMAP.md as the canonical provenance source.
|
||||
- 07-VALIDATION.md preamble has a dedicated **UX-03 scope clarification** paragraph.
|
||||
|
||||
Resolution status (pass via Phase 9) is unaffected — UX-03 is closed regardless of which phase first surfaced it as tech debt. The correction matters only for future archaeology (who reads this audit in v1.2 and wants to understand where the original defect lived).
|
||||
|
||||
## Row-Count Context Across the 7-Phase Audit Track
|
||||
|
||||
| Phase | Rows | Character | Anchor source |
|
||||
|-------|-----:|-----------|---------------|
|
||||
| 1 | 14 | Foundation build phase (INFRA-01/02 + .intunewin spike decomposition) | REQUIREMENTS.md |
|
||||
| 2 | 6 | Driver upload phase (DRV-01..05) | REQUIREMENTS.md |
|
||||
| 3 | 10 | Printer CRUD phase (PRNT-01..10) | REQUIREMENTS.md |
|
||||
| 4 | 5 | Script generation phase (SCRPT-01..05) | REQUIREMENTS.md |
|
||||
| 5 | 5 | Package export phase (PKG-01..05) | REQUIREMENTS.md |
|
||||
| 6 | 1 | Single-requirement gap-closure (PKG-04 icon embed) | REQUIREMENTS.md |
|
||||
| **7** | **4**| **Zero-requirement gap-closure (goal-decomposition anchored) + 1 carry-over** | **VERIFICATION.md + plan directive** |
|
||||
|
||||
**Total: 45 audit rows across 7 phases.** Phase 7 is the only phase whose Nyquist row count was anchored to VERIFICATION.md rather than REQUIREMENTS.md, because it is the only phase with zero REQUIREMENTS.md IDs. This is a legitimate alternate anchoring pattern, not a row-count quality deficit — row count is a function of each phase's actual observable scope and should never be padded or trimmed for visual parity. 08-08 rollup should document this explicitly so future REQUIREMENTS-free phases (Phase 11 rollout polish, hypothetical future v1.2 UX phases) have an audited precedent to follow.
|
||||
|
||||
## Cross-Reference with 07-VERIFICATION.md
|
||||
|
||||
07-VERIFICATION.md (2026-04-13) enumerated 4 observable truths, all VERIFIED:
|
||||
|
||||
- Truth 1 (GET /packages returns 200 with driver-assigned printers) ← Nyquist row 1 primary evidence
|
||||
- Truth 2 (dashboard shows 5 most recent printers) ← Nyquist row 2 primary evidence
|
||||
- Truth 3 (dashboard shows 5 most recent packages with driver filter) ← Nyquist row 3 primary evidence
|
||||
- Truth 4 (full suite remains green after changes) ← sampling discipline, folds into every row's evidence rather than becoming a distinct Nyquist row
|
||||
|
||||
No "Human Verification Required" items in 07-VERIFICATION.md — the only residual manual item (nav active-class highlight on /packages) is tracked in 07-VALIDATION.md Manual-Only Verifications and is cosmetic polish, not part of the observable-correctness audit scope.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
**None.** Plan 08-07 executed exactly as written. Single task, single file edit. The plan explicitly asked to:
|
||||
|
||||
1. Extract Phase 7 success criteria from v1.0-ROADMAP.md → done (one narrative goal, decomposed into 3 in-scope observable rows anchored to 07-VERIFICATION.md).
|
||||
2. One observable check per criterion with evidence in priority order → done (tests first, source second, VERIFICATION.md third; no runtime row because Phase 7 is UI-only).
|
||||
3. Preserve all existing sections; append `## Nyquist Record` → done (inserted between Manual-Only Verifications and Validation Sign-Off).
|
||||
4. Record UX-03 resolution citing Phase 9 / UX-03 → done (row 4, cites commits `d359001` + `68a2935` with scope note).
|
||||
5. Update frontmatter → done (`nyquist_compliant: true`, `nyquist_audited: 2026-04-13`, `nyquist_auditor: Claude (gsd-executor, plan 08-07)`).
|
||||
|
||||
One **interpretation note** (not a deviation): the plan text describes UX-03 as a "carried-over gap from Phase 7" based on STATE.md, but `v1.0-ROADMAP.md` canonically lists UX-03 as a Phase 5 deferral. The Nyquist row was recorded as the plan directed (row 4 citing Phase 9 closure) but flagged the provenance discrepancy in Notes rather than silently propagating the imprecise restatement. No Rule 1-4 deviations triggered. No auth gates.
|
||||
|
||||
## Authentication Gates
|
||||
|
||||
None.
|
||||
|
||||
## Task Commits
|
||||
|
||||
1. **Task 1: Build Phase 7 Nyquist Record and upgrade 07-VALIDATION.md** — `7e78b17` (docs)
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
- `.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md` — added `## Nyquist Record` section (preamble + 4-row table + outcome table), updated frontmatter (`nyquist_compliant: true`, `nyquist_audited`, `nyquist_auditor`), ticked all Validation Sign-Off checkboxes.
|
||||
- `.planning/phases/08-nyquist-validation-track/08-07-SUMMARY.md` — this file.
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- 7/8 plans of Phase 08 complete (08-01..08-07 audited: Phases 1, 2, 3, 4, 5, 6, 7). **Per-phase NYQ-01 coverage is now complete for the entire v1.0 milestone.**
|
||||
- Remaining: **08-08 — milestone rollup index.** This should aggregate all 7 VALIDATION.md Nyquist Records into a single top-level index (suggested path: `.planning/milestones/v1.0-NYQUIST-ROLLUP.md` or similar), summing the 45 audit rows (14+6+10+5+5+1+4), noting the 0 fail-fix-v1.1 / 0 deferred-v1.2 / 0 wont-do result, and tying the NYQ-01 requirement closure.
|
||||
- **08-08 should explicitly call out:**
|
||||
- Phase 5 PKG-02 row = only artifact-backed live-tenant runtime row in the entire track (strongest single row)
|
||||
- Phase 6 PKG-04 = bidirectional gap-closure citation loop with 05-VALIDATION row 4 (first closed-loop pattern)
|
||||
- Phase 7 = only REQUIREMENTS-free phase, anchored to VERIFICATION.md instead — a legitimate alternate anchoring pattern
|
||||
- Phase 7 UX-03 carry-over row = provenance correction noted (STATE.md vs v1.0-ROADMAP.md discrepancy)
|
||||
- Row count per phase is a function of scope, not quality: 1, 4, 5, 5, 6, 10, 14 all legitimate
|
||||
- 45/45 pass, zero roll-forward to v1.1 — NYQ-01 unambiguously satisfied
|
||||
- 07-VERIFICATION.md and 07-VALIDATION.md now agree on evidence set (independent convergence = strong consistency signal). 08-08 rollup should use this as an exemplar.
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- `.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md` — FOUND (modified, grep verified `## Nyquist Record` + `nyquist_audited:` present via VERIFY_OK)
|
||||
- `## Nyquist Record` heading — FOUND in file (VERIFY_OK from verify command)
|
||||
- `nyquist_audited:` frontmatter key — FOUND (VERIFY_OK from verify command)
|
||||
- Commit `7e78b17` (Task 1) — FOUND via `git rev-parse --short HEAD` returned `7e78b17`
|
||||
- Commits `8cf47f5` + `91910ad` (Phase 7 TDD RED/GREEN) — cited in rows 1/2/3 evidence
|
||||
- Commits `d359001` + `68a2935` (Phase 9 / 09-03 UX-03 TDD RED/GREEN) — cited in row 4 evidence
|
||||
- 07-VERIFICATION.md 2026-04-13 (4/4 truths VERIFIED) — cross-referenced in all rows
|
||||
- v1.0-ROADMAP.md Phase 7 goal block + Issues Deferred UX-03 entry — provenance source cited for row 4 correction
|
||||
- No source code files touched (plan constraint: `files_modified: [.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md]`) — only that one VALIDATION file modified in working tree
|
||||
@@ -0,0 +1,208 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 08
|
||||
type: execute
|
||||
wave: 8
|
||||
depends_on: [08-01, 08-02, 08-03, 08-04, 08-05, 08-06, 08-07]
|
||||
files_modified:
|
||||
- .planning/milestones/v1.0-VALIDATION-INDEX.md
|
||||
- .planning/phases/01-foundation/01-VALIDATION.md
|
||||
- .planning/phases/02-driver-management/02-VALIDATION.md
|
||||
- .planning/phases/03-printer-configuration/03-VALIDATION.md
|
||||
- .planning/phases/04-script-generation/04-VALIDATION.md
|
||||
- .planning/phases/05-package-export/05-VALIDATION.md
|
||||
- .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||||
- .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||||
- .planning/REQUIREMENTS.md
|
||||
autonomous: false
|
||||
requirements: [NYQ-02, NYQ-03]
|
||||
must_haves:
|
||||
truths:
|
||||
- "An operator can open .planning/milestones/v1.0-VALIDATION-INDEX.md and see a single flat pass/fail table across all 7 v1.0 phases"
|
||||
- "The index header shows audit date, auditor, and overall tally (X/Y pass, Z deferred, W fail-fix)"
|
||||
- "Every gap row in the index has status in {fail-fix-v1.1, deferred-v1.2, wont-do} with non-empty rationale"
|
||||
- "Every fail-fix-v1.1 row links to a real fixing phase (9, 10, or 11)"
|
||||
- "Every per-phase VALIDATION.md has a dated sign-off checkbox matching the index sign-off"
|
||||
- "REQUIREMENTS.md NYQ-01/02/03 are ticked [x] after sign-off"
|
||||
artifacts:
|
||||
- path: ".planning/milestones/v1.0-VALIDATION-INDEX.md"
|
||||
provides: "Single flat pass/fail roll-up across 7 phases with gap triage column"
|
||||
contains: "| Phase | # | Criterion | Status | Evidence | Gap Link |"
|
||||
- path: ".planning/REQUIREMENTS.md"
|
||||
provides: "NYQ-01..03 marked complete"
|
||||
contains: "[x] **NYQ-01**"
|
||||
key_links:
|
||||
- from: ".planning/milestones/v1.0-VALIDATION-INDEX.md"
|
||||
to: ".planning/phases/{01..07}-*/NN-VALIDATION.md"
|
||||
via: "markdown links from each index row to its phase Nyquist Record"
|
||||
pattern: "phases/0[1-7]-.*VALIDATION.md"
|
||||
- from: ".planning/milestones/v1.0-VALIDATION-INDEX.md fail-fix rows"
|
||||
to: ".planning/phases/{09,10,11}-*"
|
||||
via: "fixing-phase back-links"
|
||||
pattern: "fail-fix-v1.1.*Phase (9|10|11)"
|
||||
---
|
||||
|
||||
<objective>
|
||||
Aggregate all 7 per-phase Nyquist Records into a single milestone-level index (`.planning/milestones/v1.0-VALIDATION-INDEX.md`), triage every gap against Phases 9/10/11, obtain human sign-off, replicate sign-off into each phase's VALIDATION.md frontmatter, and tick NYQ-01/02/03 in REQUIREMENTS.md.
|
||||
|
||||
Purpose: Closes NYQ-02 (single pass/fail rollup) and NYQ-03 (gap triage) and formally closes Phase 8.
|
||||
Output: New `v1.0-VALIDATION-INDEX.md`, updated 7 phase VALIDATION.md files, updated REQUIREMENTS.md.
|
||||
</objective>
|
||||
|
||||
<execution_context>
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/workflows/execute-plan.md
|
||||
@C:/Users/SebastienQUEROL/.claude/get-shit-done/templates/summary.md
|
||||
</execution_context>
|
||||
|
||||
<context>
|
||||
@.planning/ROADMAP.md
|
||||
@.planning/STATE.md
|
||||
@.planning/REQUIREMENTS.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-CONTEXT.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-01-SUMMARY.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-02-SUMMARY.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-03-SUMMARY.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-04-SUMMARY.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-05-SUMMARY.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-06-SUMMARY.md
|
||||
@.planning/phases/08-nyquist-validation-track/08-07-SUMMARY.md
|
||||
@.planning/milestones/v1.0-ROADMAP.md
|
||||
@.planning/phases/01-foundation/01-VALIDATION.md
|
||||
@.planning/phases/02-driver-management/02-VALIDATION.md
|
||||
@.planning/phases/03-printer-configuration/03-VALIDATION.md
|
||||
@.planning/phases/04-script-generation/04-VALIDATION.md
|
||||
@.planning/phases/05-package-export/05-VALIDATION.md
|
||||
@.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||||
@.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||||
</context>
|
||||
|
||||
<tasks>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 1: Compile v1.0-VALIDATION-INDEX.md rollup</name>
|
||||
<files>.planning/milestones/v1.0-VALIDATION-INDEX.md</files>
|
||||
<action>
|
||||
Create a NEW file `.planning/milestones/v1.0-VALIDATION-INDEX.md`. Structure (per CONTEXT.md locked decisions):
|
||||
|
||||
1. **Frontmatter:** milestone: v1.0, type: validation-index, audit_date: <date>, auditor: <name>, status: draft.
|
||||
|
||||
2. **Header block** above the table:
|
||||
- Title: `# v1.0 Validation Index — Nyquist Rollup`
|
||||
- Audit date + auditor
|
||||
- Overall tally line: `**Tally:** X/Y pass, Z deferred, W fail-fix-v1.1, U wont-do` — compute from all 7 per-phase Nyquist Records
|
||||
- One-sentence context: "Single flat pass/fail roll-up of every v1.0 success criterion across Phases 1–7. Source of truth for NYQ-02 and NYQ-03."
|
||||
|
||||
3. **Flat table** (NOT per-phase subsections — CONTEXT.md explicitly requires a single flat greppable table):
|
||||
`| Phase | # | Criterion | Status | Evidence | Gap Link |`
|
||||
- One row per success criterion across all 7 phases (total rows = sum of Phase 1..7 criteria)
|
||||
- `Phase` cell: short label like "1-Foundation"
|
||||
- `#` cell: criterion number within its phase
|
||||
- `Criterion` cell: short paraphrase (full text lives in the per-phase VALIDATION.md)
|
||||
- `Status` cell: pass | fail-fix-v1.1 | deferred-v1.2 | wont-do
|
||||
- `Evidence` cell: markdown link to the per-phase VALIDATION.md Nyquist Record row (`[01-VALIDATION.md#nyquist-record](../phases/01-foundation/01-VALIDATION.md#nyquist-record)`) or direct cite
|
||||
- `Gap Link` cell: empty for pass rows; for fail-fix-v1.1 rows → link to fixing phase (Phase 9/10/11); for deferred/wont-do → rationale sentence (MANDATORY, no empty cells per CONTEXT.md)
|
||||
|
||||
4. **Gap validation block** below the table:
|
||||
- Sub-list of every fail-fix-v1.1 row with a sanity check: does the linked fixing phase actually own the fix? If any fail-fix-v1.1 row points to a phase that does NOT contain the fix, the CONTEXT.md rule says "the roadmap is wrong and must be amended before Phase 8 closes" — flag this loudly in the file and STOP; surface it in the wave-8 checkpoint.
|
||||
|
||||
5. **Sign-off line** at the bottom (unchecked initially, flipped in Task 3):
|
||||
`- [ ] Nyquist audit complete — <date> — <auditor>`
|
||||
|
||||
Do NOT modify source code. This writes only to `.planning/milestones/`.
|
||||
</action>
|
||||
<verify>
|
||||
<automated>test -f .planning/milestones/v1.0-VALIDATION-INDEX.md && grep -q "| Phase | # | Criterion | Status | Evidence | Gap Link |" .planning/milestones/v1.0-VALIDATION-INDEX.md && grep -q "Nyquist audit complete" .planning/milestones/v1.0-VALIDATION-INDEX.md</automated>
|
||||
</verify>
|
||||
<done>
|
||||
v1.0-VALIDATION-INDEX.md exists with frontmatter, header + tally, flat table containing one row per v1.0 success criterion across all 7 phases, gap cells populated for every non-pass row, and an unchecked sign-off line. Any roadmap-mismatch fail-fix rows are loudly flagged.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
<task type="checkpoint:human-verify" gate="blocking">
|
||||
<name>Task 2: Human sign-off on v1.0-VALIDATION-INDEX.md</name>
|
||||
<files>.planning/milestones/v1.0-VALIDATION-INDEX.md</files>
|
||||
<action>Pause execution. Present the index and per-phase VALIDATION.md files to the human for review per the how-to-verify block. Do not proceed to Task 3 until a resume signal is received.</action>
|
||||
<verify><automated>grep -q "Nyquist audit complete" .planning/milestones/v1.0-VALIDATION-INDEX.md</automated></verify>
|
||||
<done>Human has reviewed the index and spot-checked two per-phase VALIDATION.md files and posted an approval resume signal (or returned corrections to Task 1).</done>
|
||||
<what-built>
|
||||
`.planning/milestones/v1.0-VALIDATION-INDEX.md` with a flat pass/fail table across all 7 v1.0 phases, gap triage column populated, and tally computed. Seven per-phase VALIDATION.md files each carry a `## Nyquist Record` with cited evidence.
|
||||
</what-built>
|
||||
<how-to-verify>
|
||||
1. Open `.planning/milestones/v1.0-VALIDATION-INDEX.md`. Confirm:
|
||||
- Header tally numbers add up to the total criterion count across Phases 1–7 (cross-check with milestones/v1.0-ROADMAP.md).
|
||||
- Every row has non-empty Status, Evidence, and (for non-pass rows) Gap Link.
|
||||
- Every fail-fix-v1.1 row links to a real fixing phase (9, 10, or 11).
|
||||
- No row has status "needs investigation" or similar escape hatches — Nyquist requires a decision.
|
||||
2. Spot-check two per-phase VALIDATION.md files (pick any two of phases 1–7). Confirm each has:
|
||||
- `## Nyquist Record` section present
|
||||
- One row per success criterion
|
||||
- Cited evidence for each row (test, commit, artifact, or dated manual ref)
|
||||
- Frontmatter has `nyquist_audited` and `nyquist_auditor`
|
||||
3. Review any `fail-fix-v1.1` flag from Task 1's gap validation block. If a row is wrongly linked (fix does NOT live in the cited phase), halt and fix the roadmap before resuming.
|
||||
4. Decision to make: approve sign-off, or send back for corrections.
|
||||
</how-to-verify>
|
||||
<resume-signal>Type "approved — signed off by <name>" or describe corrections needed.</resume-signal>
|
||||
</task>
|
||||
|
||||
<task type="auto">
|
||||
<name>Task 3: Finalize sign-off — flip flags, tick requirements, replicate into per-phase files</name>
|
||||
<files>
|
||||
.planning/milestones/v1.0-VALIDATION-INDEX.md,
|
||||
.planning/phases/01-foundation/01-VALIDATION.md,
|
||||
.planning/phases/02-driver-management/02-VALIDATION.md,
|
||||
.planning/phases/03-printer-configuration/03-VALIDATION.md,
|
||||
.planning/phases/04-script-generation/04-VALIDATION.md,
|
||||
.planning/phases/05-package-export/05-VALIDATION.md,
|
||||
.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md,
|
||||
.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md,
|
||||
.planning/REQUIREMENTS.md
|
||||
</files>
|
||||
<action>
|
||||
Only run this task AFTER Task 2 returns "approved". Use the auditor name + sign-off date provided in the resume signal.
|
||||
|
||||
1. In `v1.0-VALIDATION-INDEX.md`:
|
||||
- Flip frontmatter `status: draft → signed-off`
|
||||
- Tick the sign-off line: `- [x] Nyquist audit complete — <date> — <auditor>`
|
||||
|
||||
2. In EACH of the 7 per-phase VALIDATION.md files:
|
||||
- Flip frontmatter `nyquist_compliant: false → true` if (and only if) every row in that phase's Nyquist Record is pass or explicit-deferred
|
||||
- Ensure `nyquist_audited: <date>` and `nyquist_auditor: <name>` match the index sign-off
|
||||
- In the existing "Validation Sign-Off" section, tick the "nyquist_compliant: true set in frontmatter" box and add a dated sign-off line mirroring the index.
|
||||
|
||||
3. In `.planning/REQUIREMENTS.md`:
|
||||
- Tick `[ ] **NYQ-01**` → `[x] **NYQ-01**` (only if all 7 phase VALIDATION.md files have complete Nyquist Records)
|
||||
- Tick `[ ] **NYQ-02**` → `[x] **NYQ-02**` (index exists with flat rollup)
|
||||
- Tick `[ ] **NYQ-03**` → `[x] **NYQ-03**` (every gap has status + rationale + fixing-phase link or written deferral)
|
||||
- Update the Traceability table NYQ-01/02/03 rows: Status Pending → Complete
|
||||
|
||||
4. Do NOT touch ROADMAP.md or STATE.md here — the orchestrator's post-phase hooks handle those.
|
||||
</action>
|
||||
<verify>
|
||||
<automated>grep -q "^- \[x\] Nyquist audit complete" .planning/milestones/v1.0-VALIDATION-INDEX.md && grep -q "^- \[x\] \*\*NYQ-01\*\*" .planning/REQUIREMENTS.md && grep -q "^- \[x\] \*\*NYQ-02\*\*" .planning/REQUIREMENTS.md && grep -q "^- \[x\] \*\*NYQ-03\*\*" .planning/REQUIREMENTS.md</automated>
|
||||
</verify>
|
||||
<done>
|
||||
Index is signed off, all 7 per-phase VALIDATION.md files have matching sign-off stamps and (where applicable) nyquist_compliant: true, and REQUIREMENTS.md shows NYQ-01/02/03 as [x] Complete.
|
||||
</done>
|
||||
</task>
|
||||
|
||||
</tasks>
|
||||
|
||||
<verification>
|
||||
- v1.0-VALIDATION-INDEX.md exists, has flat table, has tally header, has signed-off sign-off line
|
||||
- All 7 per-phase VALIDATION.md files have matching nyquist_audited date
|
||||
- REQUIREMENTS.md NYQ-01, NYQ-02, NYQ-03 all show [x]
|
||||
- REQUIREMENTS.md Traceability table rows for NYQ-01..03 show Complete
|
||||
- Every fail-fix-v1.1 row in the index links to a real Phase 9/10/11
|
||||
</verification>
|
||||
|
||||
<success_criteria>
|
||||
Phase 8 closes with:
|
||||
1. NYQ-01 satisfied: all 7 v1.0 phases have Nyquist-compliant VALIDATION.md
|
||||
2. NYQ-02 satisfied: single flat pass/fail rollup at .planning/milestones/v1.0-VALIDATION-INDEX.md
|
||||
3. NYQ-03 satisfied: every gap is either linked to a fixing phase or explicitly deferred with rationale
|
||||
4. Human sign-off recorded in both the index and each per-phase VALIDATION.md
|
||||
</success_criteria>
|
||||
|
||||
<output>
|
||||
After completion, create `.planning/phases/08-nyquist-validation-track/08-08-SUMMARY.md`
|
||||
</output>
|
||||
@@ -0,0 +1,94 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
plan: 08
|
||||
subsystem: validation-rollup
|
||||
tags: [nyquist, validation, milestone, sign-off, v1.0-audit]
|
||||
requires:
|
||||
- .planning/phases/01-foundation/01-VALIDATION.md
|
||||
- .planning/phases/02-driver-management/02-VALIDATION.md
|
||||
- .planning/phases/03-printer-configuration/03-VALIDATION.md
|
||||
- .planning/phases/04-script-generation/04-VALIDATION.md
|
||||
- .planning/phases/05-package-export/05-VALIDATION.md
|
||||
- .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||||
- .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||||
provides:
|
||||
- .planning/milestones/v1.0-VALIDATION-INDEX.md (signed-off)
|
||||
- REQUIREMENTS.md NYQ-01/02/03 complete
|
||||
affects:
|
||||
- .planning/REQUIREMENTS.md
|
||||
- all 7 per-phase VALIDATION.md sign-off blocks
|
||||
tech_stack:
|
||||
added: []
|
||||
patterns:
|
||||
- flat-greppable-rollup-table
|
||||
- bidirectional-citation-loop
|
||||
- historical-gap-closed-in-place
|
||||
key_files:
|
||||
created:
|
||||
- .planning/milestones/v1.0-VALIDATION-INDEX.md
|
||||
- .planning/phases/08-nyquist-validation-track/08-08-SUMMARY.md
|
||||
modified:
|
||||
- .planning/phases/01-foundation/01-VALIDATION.md
|
||||
- .planning/phases/02-driver-management/02-VALIDATION.md
|
||||
- .planning/phases/03-printer-configuration/03-VALIDATION.md
|
||||
- .planning/phases/04-script-generation/04-VALIDATION.md
|
||||
- .planning/phases/05-package-export/05-VALIDATION.md
|
||||
- .planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
|
||||
- .planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
|
||||
- .planning/REQUIREMENTS.md
|
||||
decisions:
|
||||
- NYQ-02/03 closed with 45/45 pass, zero fail-fix-v1.1 rows (all historical gaps closed in place via fixing phases 6/9/10)
|
||||
- Phase 4 attestation-only audit gap acknowledged as known-weakness handed to Phase 11 rollout, not re-opened as fail-fix (already acknowledged in plan 10-03 sign-off)
|
||||
- Index frontmatter flipped draft → signed-off with signer recorded in-file
|
||||
metrics:
|
||||
duration_minutes: 5
|
||||
tasks_completed: 3
|
||||
files_modified: 9
|
||||
completed_date: 2026-04-13
|
||||
---
|
||||
|
||||
# Phase 8 Plan 08: v1.0 Validation Index Rollup & Sign-Off Summary
|
||||
|
||||
Aggregated all 7 per-phase Nyquist Records into a single flat 45-row rollup index, obtained human sign-off from Sébastien QUEROL, replicated the sign-off into every per-phase VALIDATION.md, and closed NYQ-01/02/03 in REQUIREMENTS.md — formally closing Phase 8 and the v1.1 Nyquist Validation Track.
|
||||
|
||||
## What Was Built
|
||||
|
||||
- **`.planning/milestones/v1.0-VALIDATION-INDEX.md`** — single flat pass/fail rollup with one row per v1.0 success criterion (45 rows: 14 + 6 + 10 + 5 + 5 + 1 + 4 across Phases 1–7). Each row cites evidence as a markdown link into the per-phase `NN-VALIDATION.md#nyquist-record`. Gap Validation Block confirms every fixing-phase citation against REQUIREMENTS.md and SUMMARY.md files. Attestation-Gap Residual Risk block captures the Phase 4 runtime-half weakness as a known rollout concern rather than a fail-fix row.
|
||||
- **7 per-phase VALIDATION.md sign-off blocks** — all now carry `- [x] Nyquist audit complete — 2026-04-13 — Sébastien QUEROL` mirroring the index, and `**Approval:**` line upgraded from `pending` (phases 1–5) / audit-only (phases 6–7) to full human-signed-off text with back-link to the index.
|
||||
- **REQUIREMENTS.md** — NYQ-02 and NYQ-03 flipped `[ ] → [x]`, Traceability table rows Pending → Complete. NYQ-01 was already Complete from plans 08-01..08-07.
|
||||
|
||||
## Tasks Completed
|
||||
|
||||
| Task | Description | Commit |
|
||||
| ---- | --------------------------------------------------------------------------- | ------ |
|
||||
| 1 | Compile `v1.0-VALIDATION-INDEX.md` rollup (45/45 pass, draft, tally block) | 192a64d |
|
||||
| 2 | Human sign-off checkpoint | — (approval: Sébastien QUEROL 2026-04-13) |
|
||||
| 3 | Flip index to signed-off, tick 7 per-phase sign-offs, tick NYQ-02/03 | (this commit) |
|
||||
|
||||
## Key Decisions
|
||||
|
||||
1. **Zero fail-fix-v1.1 rows.** Every historical gap across the 7-phase track was already closed in place via fixing phases (Phase 6 icon embedding, Phase 9 UX-01/02/03, Phase 10 RTVAL-01). Gap Validation Block in the index cross-checks all 5 historical-gap rows against REQUIREMENTS.md and fixing-phase SUMMARY.md files — all confirmed.
|
||||
2. **Phase 4 attestation-only runtime half is NOT reopened.** RTVAL-02/03/04 attestation-only PASSes (per STATE.md 2026-04-13 and plan 10-03 sign-off commit cd2df1e) are recorded in the Attestation-Gap Residual Risk block as a known weakness owned by Phase 11 rollout for artifact re-capture. Reopening as fail-fix would contradict the already-shipped plan 10-03 sign-off.
|
||||
3. **Bidirectional closure loop** between `05-VALIDATION row 4` and `06-VALIDATION row 1` (PKG-04 icon embedding) preserved and flagged as a replicable pattern for future gap-closure phases.
|
||||
4. **Sign-off replicated, not centralized.** Each per-phase VALIDATION.md carries its own dated sign-off line back-linking to `v1.0-VALIDATION-INDEX.md` — greppable from either direction.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None — plan executed exactly as written. Frontmatter `nyquist_compliant: true` was already set in all 7 phase files by prior plans 08-01..08-07; Task 3 step 2 consistency-check confirmed this and only the sign-off line + Approval text required edits. Phases 5 and 6 had already ticked the `nyquist_compliant:` checkbox in the Validation Sign-Off block; Phases 1–4 and 7 had not — all now ticked.
|
||||
|
||||
## Success Criteria — Final State
|
||||
|
||||
1. **NYQ-01 satisfied** — all 7 v1.0 phases have Nyquist-compliant VALIDATION.md (already ticked; confirmed here)
|
||||
2. **NYQ-02 satisfied** — single flat pass/fail rollup at `.planning/milestones/v1.0-VALIDATION-INDEX.md`, signed off
|
||||
3. **NYQ-03 satisfied** — every gap linked to a fixing phase (5 historical-gap rows, all verified) or explicitly deferred with rationale (Phase 4 attestation-only rows in Residual Risk block)
|
||||
4. **Human sign-off recorded** in both the index frontmatter + sign-off line and each of the 7 per-phase VALIDATION.md Approval blocks
|
||||
|
||||
Phase 8 is now formally closed. v1.1 Nyquist Validation Track complete. All remaining v1.1 phases (9, 10, 11) were already closed prior to this plan per STATE.md.
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- File `.planning/milestones/v1.0-VALIDATION-INDEX.md` exists and frontmatter shows `status: signed-off`
|
||||
- Sign-off line ticked: `- [x] Nyquist audit complete — 2026-04-13 — Sébastien QUEROL`
|
||||
- All 7 per-phase VALIDATION.md files carry matching dated sign-off lines
|
||||
- REQUIREMENTS.md NYQ-01/02/03 all `[x]`, Traceability rows all Complete
|
||||
- Prior commit `192a64d` verified present in git log
|
||||
@@ -0,0 +1,108 @@
|
||||
# Phase 8: Nyquist Validation Track - Context
|
||||
|
||||
**Gathered:** 2026-04-13
|
||||
**Status:** Ready for planning
|
||||
|
||||
<domain>
|
||||
## Phase Boundary
|
||||
|
||||
Retro-fit a Nyquist-compliant validation record across all 7 v1.0 phases, aggregate pass/fail into a single milestone index, and triage any gaps into v1.1 defects or explicit deferrals. Pure audit of shipped code — no new product features, no refactors, no runtime validation (that's Phase 10).
|
||||
|
||||
</domain>
|
||||
|
||||
<decisions>
|
||||
## Implementation Decisions
|
||||
|
||||
### File strategy & schema
|
||||
- **Upgrade existing `{NN}-VALIDATION.md` in place** for each of the 7 v1.0 phases. Do NOT create a parallel file.
|
||||
- Preserve the current execution-sampling sections (Sampling Rate, Per-Task Verification Map, Wave 0 Requirements, Manual-Only Verifications) — they are historical record.
|
||||
- **Add a new top-level section `## Nyquist Record`** containing one row per phase success criterion from ROADMAP.md / milestones/v1.0-ROADMAP.md.
|
||||
- Row shape: `| # | Success Criterion | Observable Check | Evidence | Status | Notes |`
|
||||
- Exactly **one observable check per success criterion** (Nyquist rule — no hand-wavy "code looks right").
|
||||
- Evidence cell is a markdown link or inline reference (see Evidence types below).
|
||||
- **Frontmatter:** flip `nyquist_compliant: false → true` only when every row has Status = pass or explicit-deferred; add `nyquist_audited: YYYY-MM-DD` and `nyquist_auditor: <name>`.
|
||||
|
||||
### Evidence types (what counts)
|
||||
Accepted, in priority order:
|
||||
1. **Test evidence** — `pytest <path>::<testname>` plus the file path:line where it lives. Trust a recorded-green run from commit X; do NOT require live re-run.
|
||||
2. **Commit evidence** — commit SHA + file path:line for code-only checks (e.g., "UAC self-elevation guard present at install.ps1:12-20").
|
||||
3. **File-artifact evidence** — path to a generated artifact (e.g., a sample `.intunewin` byte-layout fixture).
|
||||
4. **Manual-check evidence** — link to a dated note in the phase's `VERIFICATION.md` describing what was observed. Only allowed when no automated path exists.
|
||||
- **Not accepted:** "code review says it works", "see comments in file", vague prose.
|
||||
- Re-running tests live is NOT required. A green pytest run recorded in the commit log counts.
|
||||
|
||||
### Gap triage & index rollup
|
||||
- **Gaps live as rows in the index**, not in a separate DEFECTS.md file. Keeping gap tracking co-located with the pass/fail rollup is the whole point of the index.
|
||||
- Each gap row gets status ∈ {`fail-fix-v1.1`, `deferred-v1.2`, `wont-do`} and a mandatory `rationale` cell.
|
||||
- `fail-fix-v1.1` rows MUST link to the fixing phase (9, 10, or 11) — if no phase owns the fix, the roadmap is wrong and must be amended before Phase 8 closes.
|
||||
- `deferred-v1.2` / `wont-do` rows MUST have written rationale; no empty cells.
|
||||
- Index file: **`.planning/milestones/v1.0-VALIDATION-INDEX.md`** (exact path per roadmap success criterion #2).
|
||||
|
||||
### Index structure
|
||||
- Single flat table across all 7 phases: `| Phase | # | Criterion | Status | Evidence | Gap Link |`
|
||||
- Header block above the table: audit date, auditor, overall tally (`X/Y pass, Z deferred, W fail-fix`).
|
||||
- Per-phase subsections NOT used — flat table keeps the rollup scannable and greppable.
|
||||
- **Sign-off:** dated checkbox line at the bottom: `- [x] Nyquist audit complete — <date> — <auditor>`. Same sign-off replicated in each phase's VALIDATION.md frontmatter.
|
||||
|
||||
### Audit execution approach
|
||||
- **Sequential phase-by-phase (1 → 7).** Each audit informs the next (shared patterns, shared test infra), and ImpTune is small enough that parallelism would cost more coordination than it saves.
|
||||
- **One plan per v1.0 phase audited** (7 plans: 08-01 through 08-07), plus **one final plan (08-08) for the index + triage sign-off**. Total: 8 plans.
|
||||
- Each audit plan: read that phase's ROADMAP criteria → map each to an observable check → locate evidence → fill the Nyquist Record → commit.
|
||||
- The final 08-08 plan: aggregate all 7 phase records into `v1.0-VALIDATION-INDEX.md`, confirm gap links against Phases 9/10/11, sign off.
|
||||
|
||||
### Claude's Discretion
|
||||
- Exact wording / column widths in the Nyquist Record tables.
|
||||
- Whether to also flip `status: draft → audited` in per-phase frontmatter (preferred but not mandatory).
|
||||
- How to handle the Phase 1 "spike" row (`01-03-02`, upload to real Intune tenant) — likely flagged as `fail-fix-v1.1` linked to Phase 10 RTVAL-01, but the auditor confirms at audit time.
|
||||
- Whether to cite commit SHAs as short (7-char) or full — auditor's call.
|
||||
- How to phrase "observable check" sentences.
|
||||
|
||||
</decisions>
|
||||
|
||||
<code_context>
|
||||
## Existing Code Insights
|
||||
|
||||
### Reusable Assets
|
||||
- **Existing per-phase VALIDATION.md files** at `.planning/phases/{NN}-*/NN-VALIDATION.md` — already have frontmatter, execution sampling tables, and Wave 0 requirements. The audit upgrades these in place rather than creating new files.
|
||||
- **`milestones/v1.0-ROADMAP.md`** — canonical source of success criteria per phase. The audit reads this, not the current `ROADMAP.md` (which is the v1.1 view).
|
||||
- **`VERIFICATION.md` files** per phase — already record per-phase verification runs; manual-only evidence links point here.
|
||||
- **Test suite under `tests/`** — pytest already green at v1.0 shipped commit; provides most test evidence for automated checks.
|
||||
|
||||
### Established Patterns
|
||||
- **Frontmatter convention** — every phase doc uses YAML frontmatter; `nyquist_compliant: false` flag already exists in VALIDATION.md, ready to flip.
|
||||
- **Per-task verification map** pattern uses `| Task ID | ... | Automated Command |` — the new Nyquist Record table mirrors this shape for consistency.
|
||||
- **Evidence citation style** elsewhere in .planning uses commit SHAs and `file.py:line` references — reuse.
|
||||
|
||||
### Integration Points
|
||||
- **Milestone-level index**: new file at `.planning/milestones/v1.0-VALIDATION-INDEX.md` — sits alongside existing `v1.0-ROADMAP.md`, same directory.
|
||||
- **Roadmap back-links** — `fail-fix-v1.1` gap rows link into Phase 9 (UX), Phase 10 (RTVAL), Phase 11 (RWR) per the v1.1 phase mapping in REQUIREMENTS.md.
|
||||
- **No source code touched** — this phase writes only to `.planning/` tree.
|
||||
|
||||
</code_context>
|
||||
|
||||
<specifics>
|
||||
## Specific Ideas
|
||||
|
||||
- The existing `01-VALIDATION.md` Manual-Only Verifications row "Upload to real Intune tenant" is the clearest example of a gap: will flip to `fail-fix-v1.1` linking RTVAL-01 / Phase 10.
|
||||
- "Nyquist-compliant" per the roadmap success criterion means: every success criterion maps to exactly one observable check with cited evidence. That's the guardrail — no auditor editorializing beyond that.
|
||||
- User ran `/gsd:discuss-phase 8` and explicitly said "go ahead and do your best" — Claude has broad discretion on presentation details; lock only the decisions above.
|
||||
|
||||
</specifics>
|
||||
|
||||
<deferred>
|
||||
## Deferred Ideas
|
||||
|
||||
### Pre-surfaced Nyquist gaps (feed into the audit, fixed elsewhere)
|
||||
- **`POST /drivers/upload` returns HTTP 500** (reported 2026-04-13 during Phase 8 kickoff). Blocks UX-01 by definition — you cannot refresh the DriverDesc dropdown if the upload itself fails. The auditor MUST record this as a `fail-fix-v1.1` row in `v1.0-VALIDATION-INDEX.md` under Phase 2 (Driver Management, DRV-01..05) linking to **Phase 9 / UX-01** as the fixing phase. Root cause is unknown at audit-kickoff time; reproduction: attempt driver ZIP upload, check server console for the 500. Do NOT fix in Phase 8 (pure audit); the fix lands in Phase 9's UX-01 plan.
|
||||
|
||||
### Out of scope entirely
|
||||
- **Live re-running of the v1.0 pytest suite at audit time** — not required for Nyquist. If a later phase wants a "green-at-audit-date" stamp, handle it in Phase 10 or later.
|
||||
- **Automating index generation from per-phase files** — manual compilation is fine for 7 phases; revisit if v1.x grows past ~15 phases.
|
||||
- **Converting this audit into a reusable template for future milestones** — capture as a v1.2+ chore, not in scope for v1.1.
|
||||
|
||||
</deferred>
|
||||
|
||||
---
|
||||
|
||||
*Phase: 08-nyquist-validation-track*
|
||||
*Context gathered: 2026-04-13*
|
||||
@@ -0,0 +1,110 @@
|
||||
---
|
||||
phase: 08-nyquist-validation-track
|
||||
verified: 2026-04-13T00:00:00Z
|
||||
status: passed
|
||||
score: 6/6 must-haves verified
|
||||
re_verification:
|
||||
previous_status: null
|
||||
previous_score: null
|
||||
gaps_closed: []
|
||||
gaps_remaining: []
|
||||
regressions: []
|
||||
---
|
||||
|
||||
# Phase 8: Nyquist Validation Track Verification Report
|
||||
|
||||
**Phase Goal:** Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked.
|
||||
**Verified:** 2026-04-13
|
||||
**Status:** passed
|
||||
**Re-verification:** No — initial verification
|
||||
|
||||
## Goal Achievement
|
||||
|
||||
### Observable Truths (derived from ROADMAP Success Criteria + user brief)
|
||||
|
||||
| # | Truth | Status | Evidence |
|
||||
|---|-------|--------|----------|
|
||||
| 1 | All 7 v1.0 phases (01–07) have a `## Nyquist Record` section in their `VALIDATION.md` | VERIFIED | `grep "## Nyquist Record"` matched all 7 files (01..07-VALIDATION.md) |
|
||||
| 2 | Every v1.0 `VALIDATION.md` frontmatter carries `nyquist_compliant: true` | VERIFIED | `grep "nyquist_compliant: true"` matched all 7 files |
|
||||
| 3 | Every v1.0 `VALIDATION.md` frontmatter carries `nyquist_audited: 2026-04-13` | VERIFIED | `grep "nyquist_audited: 2026-04-13"` matched all 7 files |
|
||||
| 4 | `.planning/milestones/v1.0-VALIDATION-INDEX.md` exists, is signed off, and shows 45/45 pass tally | VERIFIED | File read: frontmatter `status: signed-off` + `signed_off_by: Sébastien QUEROL` + `signed_off_date: 2026-04-13`; tally line 17 "45/45 pass, 0 deferred-v1.2, 0 fail-fix-v1.1, 0 wont-do"; sign-off line 124 `[x] Nyquist audit complete — 2026-04-13 — Sébastien QUEROL` |
|
||||
| 5 | Roll-up links per-phase VALIDATION.md rows and flat pass/fail table totals 45 rows matching per-phase row counts 14/6/10/5/5/1/4 | VERIFIED | Tally Summary (lines 98–107) matches phase-stated `Row counts per phase (14, 6, 10, 5, 5, 1, 4)` in line 19; Phase 1=14 rows validated in body |
|
||||
| 6 | NYQ-01/02/03 marked Complete in REQUIREMENTS.md | VERIFIED | REQUIREMENTS.md lines 27–29 show `[x] **NYQ-01**`, `[x] **NYQ-02**`, `[x] **NYQ-03**`; coverage table rows 63–65 all "Complete" |
|
||||
|
||||
**Score:** 6/6 truths verified
|
||||
|
||||
### Required Artifacts
|
||||
|
||||
| Artifact | Expected | Status | Details |
|
||||
|----------|----------|--------|---------|
|
||||
| `.planning/phases/01-foundation/01-VALIDATION.md` | Nyquist Record + frontmatter flags | VERIFIED | 34 table rows, flags present, section present |
|
||||
| `.planning/phases/02-driver-management/02-VALIDATION.md` | Nyquist Record + frontmatter flags | VERIFIED | 34 table rows, flags present |
|
||||
| `.planning/phases/03-printer-configuration/03-VALIDATION.md` | Nyquist Record + frontmatter flags | VERIFIED | 33 table rows, flags present |
|
||||
| `.planning/phases/04-script-generation/04-VALIDATION.md` | Nyquist Record + frontmatter flags + SYSTEM-context attestation notes | VERIFIED | 30 table rows; RTVAL-02/03/04 attestation-only notes present per index line 23 |
|
||||
| `.planning/phases/05-package-export/05-VALIDATION.md` | Nyquist Record + RTVAL-01 byte-level evidence | VERIFIED | 24 table rows; index confirms "strongest row — only artifact-backed live-tenant runtime evidence" |
|
||||
| `.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md` | Nyquist Record (single-row gap-closure) | VERIFIED | 20 rows (1 Nyquist row + auxiliaries); bidirectional loop with 05-VALIDATION row 4 |
|
||||
| `.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md` | Nyquist Record | VERIFIED | 27 table rows; anchors to 07-VERIFICATION.md (REQUIREMENTS-free phase, legitimate pattern per index line 25) |
|
||||
| `.planning/milestones/v1.0-VALIDATION-INDEX.md` | Signed-off 45/45 roll-up with links | VERIFIED | Exists, signed off 2026-04-13, 45/45 pass, per-phase links present, Gap Validation Block + Attestation-Gap Residual Risk blocks present |
|
||||
|
||||
### Key Link Verification
|
||||
|
||||
| From | To | Via | Status | Details |
|
||||
|------|-----|-----|--------|---------|
|
||||
| v1.0-VALIDATION-INDEX.md | Each 0N-VALIDATION.md#nyquist-record | Markdown anchors | WIRED | Every row in the Flat Pass/Fail Table (lines 32–76) cites a per-phase file with `#nyquist-record` anchor |
|
||||
| v1.0-VALIDATION-INDEX.md historical-gap rows | Fixing phases (9/10/6) SUMMARY.md | Commit hashes | WIRED | Gap Validation Block (lines 82–88) cross-checks 5 rows against REQUIREMENTS.md + fixing-phase SUMMARY.md; all ✓ |
|
||||
| REQUIREMENTS.md NYQ-01..03 | Phase 8 plans | requirement IDs | WIRED | 08-01..08-07 PLAN frontmatter → NYQ-01; 08-08 PLAN frontmatter → NYQ-02, NYQ-03 |
|
||||
| 05-VALIDATION row 4 | 06-VALIDATION row 1 | `TestIntunewinIconInclusion` | WIRED | Bidirectional closure loop confirmed in index line 26 and Gap Validation Block row 4 |
|
||||
|
||||
### Requirements Coverage
|
||||
|
||||
| Requirement | Source Plan | Description | Status | Evidence |
|
||||
|-------------|------------|-------------|--------|----------|
|
||||
| NYQ-01 | 08-01..08-07 (7 plans) | All 7 v1.0 phases have Nyquist-compliant VALIDATION.md | SATISFIED | 7/7 files carry `nyquist_compliant: true` + `## Nyquist Record`; REQUIREMENTS.md line 27 `[x]` |
|
||||
| NYQ-02 | 08-08 | v1.0-VALIDATION-INDEX.md aggregates per-phase status | SATISFIED | File exists at expected path, signed off, 45-row flat table with per-phase anchors; REQUIREMENTS.md line 28 `[x]` |
|
||||
| NYQ-03 | 08-08 | Surfaced gaps tracked as defects or explicitly deferred with rationale | SATISFIED | Gap Validation Block documents all 5 historical-gap-closure rows; Attestation-Gap Residual Risk block explicitly records SCRPT-01..05 attestation weakness deferred to Phase 11 with written rationale and prior sign-off; REQUIREMENTS.md line 29 `[x]` |
|
||||
|
||||
**Orphaned requirement IDs:** none. REQUIREMENTS.md Phase 8 mapping (NYQ-01/02/03) fully accounted for by plan frontmatters (08-01..08-07 → NYQ-01; 08-08 → NYQ-02, NYQ-03).
|
||||
|
||||
### Anti-Patterns Found
|
||||
|
||||
None material. Row-count heterogeneity (14/6/10/5/5/1/4) is legitimate per index line 19 — "a function of scope, single-criterion gap-closure phases legitimately produce single-row audits." No TODO/FIXME/placeholder stubs in the VALIDATION.md outputs.
|
||||
|
||||
### Known Deviations (user-flagged, verifier judgment)
|
||||
|
||||
**Deviation 1 — Historical-gap rows recorded as `pass` rather than `fail-fix-v1.1` (08-02 DRV upload-500 + 4 more).**
|
||||
|
||||
Judgment: **Acceptable.** Rationale:
|
||||
- The Phase 8 goal is to produce a signed-off Nyquist record reflecting the **current state of the tree**, not to retro-actively re-open gaps whose fixes are already shipped and merged.
|
||||
- All 5 historical-gap-closure rows cite concrete fix commits in fixing phases that have their own signed-off SUMMARY/VERIFICATION artifacts. REQUIREMENTS.md independently confirms UX-01, UX-02, UX-03, PKG-04, RTVAL-01 as Complete.
|
||||
- The index's Gap Validation Block (lines 80–90) explicitly cross-checks each of the 5 rows against REQUIREMENTS.md + fixing-phase SUMMARY.md with a "Confirmed?" column, then states: "Zero rows inflated to `fail-fix-v1.1` because every historical gap is already closed in the tree." This is defensible Nyquist-compliant reasoning, not a cover-up.
|
||||
- The pattern is consistently applied (5/5 rows, same pattern, explicit rationale), mirrors the 08-01 row 14 precedent the user cited, and satisfies NYQ-03 ("tracked as defects and either fixed in v1.1 or explicitly deferred with rationale") — "fixed in v1.1" is satisfied by "fixed in tree at the time of audit." Marking `fail-fix-v1.1` on already-fixed items would be misleading.
|
||||
- **Not a gap.**
|
||||
|
||||
**Deviation 2 — 08-07 UX-03 provenance mismatch (v1.0-ROADMAP says Phase 5-origin, STATE.md restatement says Phase 7 carry-over).**
|
||||
|
||||
Judgment: **Informational only, no action required.** The index row (Phase 7 row 4, line 76) explicitly flags this in its Gap Link cell: "Provenance note: v1.0-ROADMAP.md lists UX-03 as Phase 5 deferral, not Phase 7 — STATE.md restatement imprecise; resolution unaffected." The closure citation (Phase 9 plan 09-03 commits d359001 + 68a2935) is correct regardless of origin-phase labeling. Downstream auditors can reconcile. **Not a gap.**
|
||||
|
||||
### Additional Observations (informational)
|
||||
|
||||
- **Roadmap tick lag:** `.planning/ROADMAP.md` line 27 still shows Phase 8 as `[ ]` while REQUIREMENTS.md already marks NYQ-01/02/03 as `[x] Complete` and downstream phases 9/10/11 as `[x]`. This is a ROADMAP bookkeeping lag, not a goal failure. Recommend the orchestrator tick Phase 8 in ROADMAP.md when closing the phase. Does not block passing verification.
|
||||
- **Attestation-gap residual risk (SCRPT-01..05):** Documented in index lines 92–94 with explicit ownership by Phase 11 rollout and prior written user sign-off (cd2df1e). Correctly NYQ-03-compliant — explicit deferral with rationale.
|
||||
|
||||
### Human Verification Required
|
||||
|
||||
None. All goal truths are verifiable via file inspection and cross-reference. The phase is a pure audit deliverable; no runtime behavior to exercise.
|
||||
|
||||
### Gaps Summary
|
||||
|
||||
No gaps. The phase has delivered:
|
||||
1. Seven Nyquist-compliant `VALIDATION.md` files with frontmatter flags and `## Nyquist Record` sections.
|
||||
2. A signed-off `.planning/milestones/v1.0-VALIDATION-INDEX.md` with a 45/45 pass tally, per-phase anchors, a Gap Validation Block cross-checking all 5 historical-gap-closure rows, and an explicit Attestation-Gap Residual Risk block for SCRPT-01..05.
|
||||
3. NYQ-01/02/03 ticked Complete in REQUIREMENTS.md with Phase 8 ownership.
|
||||
|
||||
Both user-flagged deviations have been reviewed and judged acceptable — deviation 1 is consistent with NYQ-03's "fixed in v1.1 OR explicitly deferred" wording applied to "already fixed in tree," and deviation 2 is a self-documented informational note with no downstream impact.
|
||||
|
||||
**Recommendation:** Orchestrator can close Phase 8 and tick ROADMAP.md line 27 from `[ ]` to `[x]`.
|
||||
|
||||
---
|
||||
|
||||
_Verified: 2026-04-13_
|
||||
_Verifier: Claude (gsd-verifier)_
|
||||
Reference in New Issue
Block a user