Files
ImpTune/.planning/phases/08-nyquist-validation-track/08-08-SUMMARY.md
T
2026-04-15 17:57:12 +02:00

6.5 KiB
Raw Blame History

phase, plan, subsystem, tags, requires, provides, affects, tech_stack, key_files, decisions, metrics
phase plan subsystem tags requires provides affects tech_stack key_files decisions metrics
08-nyquist-validation-track 08 validation-rollup
nyquist
validation
milestone
sign-off
v1.0-audit
.planning/phases/01-foundation/01-VALIDATION.md
.planning/phases/02-driver-management/02-VALIDATION.md
.planning/phases/03-printer-configuration/03-VALIDATION.md
.planning/phases/04-script-generation/04-VALIDATION.md
.planning/phases/05-package-export/05-VALIDATION.md
.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
.planning/milestones/v1.0-VALIDATION-INDEX.md (signed-off)
REQUIREMENTS.md NYQ-01/02/03 complete
.planning/REQUIREMENTS.md
all 7 per-phase VALIDATION.md sign-off blocks
added patterns
flat-greppable-rollup-table
bidirectional-citation-loop
historical-gap-closed-in-place
created modified
.planning/milestones/v1.0-VALIDATION-INDEX.md
.planning/phases/08-nyquist-validation-track/08-08-SUMMARY.md
.planning/phases/01-foundation/01-VALIDATION.md
.planning/phases/02-driver-management/02-VALIDATION.md
.planning/phases/03-printer-configuration/03-VALIDATION.md
.planning/phases/04-script-generation/04-VALIDATION.md
.planning/phases/05-package-export/05-VALIDATION.md
.planning/phases/06-wire-icon-intunewin/06-VALIDATION.md
.planning/phases/07-dashboard-nav-polish/07-VALIDATION.md
.planning/REQUIREMENTS.md
NYQ-02/03 closed with 45/45 pass, zero fail-fix-v1.1 rows (all historical gaps closed in place via fixing phases 6/9/10)
Phase 4 attestation-only audit gap acknowledged as known-weakness handed to Phase 11 rollout, not re-opened as fail-fix (already acknowledged in plan 10-03 sign-off)
Index frontmatter flipped draft → signed-off with signer recorded in-file
duration_minutes tasks_completed files_modified completed_date
5 3 9 2026-04-13

Phase 8 Plan 08: v1.0 Validation Index Rollup & Sign-Off Summary

Aggregated all 7 per-phase Nyquist Records into a single flat 45-row rollup index, obtained human sign-off from Sébastien QUEROL, replicated the sign-off into every per-phase VALIDATION.md, and closed NYQ-01/02/03 in REQUIREMENTS.md — formally closing Phase 8 and the v1.1 Nyquist Validation Track.

What Was Built

  • .planning/milestones/v1.0-VALIDATION-INDEX.md — single flat pass/fail rollup with one row per v1.0 success criterion (45 rows: 14 + 6 + 10 + 5 + 5 + 1 + 4 across Phases 17). Each row cites evidence as a markdown link into the per-phase NN-VALIDATION.md#nyquist-record. Gap Validation Block confirms every fixing-phase citation against REQUIREMENTS.md and SUMMARY.md files. Attestation-Gap Residual Risk block captures the Phase 4 runtime-half weakness as a known rollout concern rather than a fail-fix row.
  • 7 per-phase VALIDATION.md sign-off blocks — all now carry - [x] Nyquist audit complete — 2026-04-13 — Sébastien QUEROL mirroring the index, and **Approval:** line upgraded from pending (phases 15) / audit-only (phases 67) to full human-signed-off text with back-link to the index.
  • REQUIREMENTS.md — NYQ-02 and NYQ-03 flipped [ ] → [x], Traceability table rows Pending → Complete. NYQ-01 was already Complete from plans 08-01..08-07.

Tasks Completed

Task Description Commit
1 Compile v1.0-VALIDATION-INDEX.md rollup (45/45 pass, draft, tally block) 192a64d
2 Human sign-off checkpoint — (approval: Sébastien QUEROL 2026-04-13)
3 Flip index to signed-off, tick 7 per-phase sign-offs, tick NYQ-02/03 (this commit)

Key Decisions

  1. Zero fail-fix-v1.1 rows. Every historical gap across the 7-phase track was already closed in place via fixing phases (Phase 6 icon embedding, Phase 9 UX-01/02/03, Phase 10 RTVAL-01). Gap Validation Block in the index cross-checks all 5 historical-gap rows against REQUIREMENTS.md and fixing-phase SUMMARY.md files — all confirmed.
  2. Phase 4 attestation-only runtime half is NOT reopened. RTVAL-02/03/04 attestation-only PASSes (per STATE.md 2026-04-13 and plan 10-03 sign-off commit cd2df1e) are recorded in the Attestation-Gap Residual Risk block as a known weakness owned by Phase 11 rollout for artifact re-capture. Reopening as fail-fix would contradict the already-shipped plan 10-03 sign-off.
  3. Bidirectional closure loop between 05-VALIDATION row 4 and 06-VALIDATION row 1 (PKG-04 icon embedding) preserved and flagged as a replicable pattern for future gap-closure phases.
  4. Sign-off replicated, not centralized. Each per-phase VALIDATION.md carries its own dated sign-off line back-linking to v1.0-VALIDATION-INDEX.md — greppable from either direction.

Deviations from Plan

None — plan executed exactly as written. Frontmatter nyquist_compliant: true was already set in all 7 phase files by prior plans 08-01..08-07; Task 3 step 2 consistency-check confirmed this and only the sign-off line + Approval text required edits. Phases 5 and 6 had already ticked the nyquist_compliant: checkbox in the Validation Sign-Off block; Phases 14 and 7 had not — all now ticked.

Success Criteria — Final State

  1. NYQ-01 satisfied — all 7 v1.0 phases have Nyquist-compliant VALIDATION.md (already ticked; confirmed here)
  2. NYQ-02 satisfied — single flat pass/fail rollup at .planning/milestones/v1.0-VALIDATION-INDEX.md, signed off
  3. NYQ-03 satisfied — every gap linked to a fixing phase (5 historical-gap rows, all verified) or explicitly deferred with rationale (Phase 4 attestation-only rows in Residual Risk block)
  4. Human sign-off recorded in both the index frontmatter + sign-off line and each of the 7 per-phase VALIDATION.md Approval blocks

Phase 8 is now formally closed. v1.1 Nyquist Validation Track complete. All remaining v1.1 phases (9, 10, 11) were already closed prior to this plan per STATE.md.

Self-Check: PASSED

  • File .planning/milestones/v1.0-VALIDATION-INDEX.md exists and frontmatter shows status: signed-off
  • Sign-off line ticked: - [x] Nyquist audit complete — 2026-04-13 — Sébastien QUEROL
  • All 7 per-phase VALIDATION.md files carry matching dated sign-off lines
  • REQUIREMENTS.md NYQ-01/02/03 all [x], Traceability rows all Complete
  • Prior commit 192a64d verified present in git log