docs(09-02): complete playwright-port-autofill plan
- Create 09-02-SUMMARY.md with Playwright e2e evidence for UX-02 - Update STATE.md: decisions, session continuity, progress bar - Update ROADMAP.md: phase 9 marked complete (3/3 plans with summaries) - Update REQUIREMENTS.md: UX-02 marked complete
This commit is contained in:
@@ -19,7 +19,7 @@
|
|||||||
### UX Tech Debt (UX)
|
### UX Tech Debt (UX)
|
||||||
|
|
||||||
- [x] **UX-01**: After a new driver is uploaded on the printer form, the DriverDesc dropdown refreshes automatically (no manual page reload) — verified live in browser
|
- [x] **UX-01**: After a new driver is uploaded on the printer form, the DriverDesc dropdown refreshes automatically (no manual page reload) — verified live in browser
|
||||||
- [ ] **UX-02**: PRNT-03 Alpine.js IP→port auto-derivation is verified live in a real browser session, with the verification recorded in VALIDATION.md
|
- [x] **UX-02**: PRNT-03 Alpine.js IP→port auto-derivation is verified live in a real browser session, with the verification recorded in VALIDATION.md
|
||||||
- [x] **UX-03**: The printer detail page exposes direct download links for each generated script (install / uninstall / detect) in addition to the package export buttons
|
- [x] **UX-03**: The printer detail page exposes direct download links for each generated script (install / uninstall / detect) in addition to the package export buttons
|
||||||
|
|
||||||
### Nyquist Validation Track (NYQ)
|
### Nyquist Validation Track (NYQ)
|
||||||
@@ -58,7 +58,7 @@ Carried forward from v1.0 Out of Scope — no change.
|
|||||||
| RTVAL-04 | Phase 10 | Pending |
|
| RTVAL-04 | Phase 10 | Pending |
|
||||||
| RTVAL-05 | Phase 10 | Pending |
|
| RTVAL-05 | Phase 10 | Pending |
|
||||||
| UX-01 | Phase 9 | Complete |
|
| UX-01 | Phase 9 | Complete |
|
||||||
| UX-02 | Phase 9 | Pending |
|
| UX-02 | Phase 9 | Complete |
|
||||||
| UX-03 | Phase 9 | Complete |
|
| UX-03 | Phase 9 | Complete |
|
||||||
| NYQ-01 | Phase 8 | Pending |
|
| NYQ-01 | Phase 8 | Pending |
|
||||||
| NYQ-02 | Phase 8 | Pending |
|
| NYQ-02 | Phase 8 | Pending |
|
||||||
|
|||||||
+94
-94
@@ -1,94 +1,94 @@
|
|||||||
# Roadmap: ImpTune
|
# Roadmap: ImpTune
|
||||||
|
|
||||||
## Milestones
|
## Milestones
|
||||||
|
|
||||||
- ✅ **v1.0 MVP** — Phases 1–7, 13 plans, 27/27 requirements (shipped 2026-04-13) — see [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
|
- ✅ **v1.0 MVP** — Phases 1–7, 13 plans, 27/27 requirements (shipped 2026-04-13) — see [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
|
||||||
- 🚧 **v1.1 Hardening & Validation** — Phases 8–11, 15 requirements (in progress, started 2026-04-13)
|
- 🚧 **v1.1 Hardening & Validation** — Phases 8–11, 15 requirements (in progress, started 2026-04-13)
|
||||||
|
|
||||||
## Phases
|
## Phases
|
||||||
|
|
||||||
<details>
|
<details>
|
||||||
<summary>✅ v1.0 MVP (Phases 1–7) — SHIPPED 2026-04-13</summary>
|
<summary>✅ v1.0 MVP (Phases 1–7) — SHIPPED 2026-04-13</summary>
|
||||||
|
|
||||||
- [x] Phase 1: Foundation (3/3 plans) — 2026-04-10
|
- [x] Phase 1: Foundation (3/3 plans) — 2026-04-10
|
||||||
- [x] Phase 2: Driver Management (2/2 plans) — 2026-04-10
|
- [x] Phase 2: Driver Management (2/2 plans) — 2026-04-10
|
||||||
- [x] Phase 3: Printer Configuration (2/2 plans) — 2026-04-10
|
- [x] Phase 3: Printer Configuration (2/2 plans) — 2026-04-10
|
||||||
- [x] Phase 4: Script Generation (2/2 plans) — 2026-04-10
|
- [x] Phase 4: Script Generation (2/2 plans) — 2026-04-10
|
||||||
- [x] Phase 5: Package Export (2/2 plans) — 2026-04-10
|
- [x] Phase 5: Package Export (2/2 plans) — 2026-04-10
|
||||||
- [x] Phase 6: Wire Icon into .intunewin (1/1 plan, gap closure) — 2026-04-10
|
- [x] Phase 6: Wire Icon into .intunewin (1/1 plan, gap closure) — 2026-04-10
|
||||||
- [x] Phase 7: Dashboard & Navigation Polish (1/1 plan, gap closure) — 2026-04-13
|
- [x] Phase 7: Dashboard & Navigation Polish (1/1 plan, gap closure) — 2026-04-13
|
||||||
|
|
||||||
Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
|
Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
|
||||||
|
|
||||||
</details>
|
</details>
|
||||||
|
|
||||||
### 🚧 v1.1 Hardening & Validation (Phases 8–11)
|
### 🚧 v1.1 Hardening & Validation (Phases 8–11)
|
||||||
|
|
||||||
- [ ] **Phase 8: Nyquist Validation Track** — Retro-fit Nyquist-compliant VALIDATION.md across all 7 v1.0 phases with evidence-backed checks
|
- [ ] **Phase 8: Nyquist Validation Track** — Retro-fit Nyquist-compliant VALIDATION.md across all 7 v1.0 phases with evidence-backed checks
|
||||||
- [ ] **Phase 9: UX Tech Debt Closure** — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use
|
- [x] **Phase 9: UX Tech Debt Closure** — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use␍ (completed 2026-04-13)
|
||||||
- [ ] **Phase 10: Real-World Runtime Validation** — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint
|
- [ ] **Phase 10: Real-World Runtime Validation** — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint
|
||||||
- [ ] **Phase 11: Real-World Rollout & Feedback** — Deploy the container to a real MSP environment, push a real package, and capture structured technician feedback
|
- [ ] **Phase 11: Real-World Rollout & Feedback** — Deploy the container to a real MSP environment, push a real package, and capture structured technician feedback
|
||||||
|
|
||||||
## Phase Details
|
## Phase Details
|
||||||
|
|
||||||
### Phase 8: Nyquist Validation Track
|
### Phase 8: Nyquist Validation Track
|
||||||
**Goal**: Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked.
|
**Goal**: Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked.
|
||||||
**Depends on**: Nothing (parallelizable — pure audit of shipped code, no runtime dependency)
|
**Depends on**: Nothing (parallelizable — pure audit of shipped code, no runtime dependency)
|
||||||
**Requirements**: NYQ-01, NYQ-02, NYQ-03
|
**Requirements**: NYQ-01, NYQ-02, NYQ-03
|
||||||
**Success Criteria** (what must be TRUE):
|
**Success Criteria** (what must be TRUE):
|
||||||
1. An operator can open any of the 7 v1.0 phase folders and read a `VALIDATION.md` where every success criterion maps to exactly one observable check with cited evidence (commit, test name, file path, or screenshot)
|
1. An operator can open any of the 7 v1.0 phase folders and read a `VALIDATION.md` where every success criterion maps to exactly one observable check with cited evidence (commit, test name, file path, or screenshot)
|
||||||
2. An operator can open `.planning/milestones/v1.0-VALIDATION-INDEX.md` and see a single pass/fail roll-up across all 7 phases with links to each phase's validation file
|
2. An operator can open `.planning/milestones/v1.0-VALIDATION-INDEX.md` and see a single pass/fail roll-up across all 7 phases with links to each phase's validation file
|
||||||
3. Any validation gap surfaced during the Nyquist pass appears in the index as either a v1.1 defect ticket (linked to the fixing phase) or an explicitly deferred item with written rationale
|
3. Any validation gap surfaced during the Nyquist pass appears in the index as either a v1.1 defect ticket (linked to the fixing phase) or an explicitly deferred item with written rationale
|
||||||
**Plans**: TBD
|
**Plans**: TBD
|
||||||
|
|
||||||
### Phase 9: UX Tech Debt Closure
|
### Phase 9: UX Tech Debt Closure
|
||||||
**Goal**: The three carried-over UX defects are fixed and live-verified in a real browser so the rolled-out build is the polished one.
|
**Goal**: The three carried-over UX defects are fixed and live-verified in a real browser so the rolled-out build is the polished one.
|
||||||
**Depends on**: Nothing (independent of validation and rollout — but must complete before Phase 11)
|
**Depends on**: Nothing (independent of validation and rollout — but must complete before Phase 11)
|
||||||
**Requirements**: UX-01, UX-02, UX-03
|
**Requirements**: UX-01, UX-02, UX-03
|
||||||
**Success Criteria** (what must be TRUE):
|
**Success Criteria** (what must be TRUE):
|
||||||
1. A technician uploading a new driver on the printer form sees the new DriverDesc appear in the dropdown without manually reloading the page
|
1. A technician uploading a new driver on the printer form sees the new DriverDesc appear in the dropdown without manually reloading the page
|
||||||
2. A technician typing an IP address into the printer form sees the port field auto-populate via the PRNT-03 Alpine.js handler, observed live in a real browser and recorded in VALIDATION.md
|
2. A technician typing an IP address into the printer form sees the port field auto-populate via the PRNT-03 Alpine.js handler, observed live in a real browser and recorded in VALIDATION.md
|
||||||
3. A technician on the printer detail page can click direct download links for the install, uninstall, and detect scripts individually, in addition to the existing package export buttons
|
3. A technician on the printer detail page can click direct download links for the install, uninstall, and detect scripts individually, in addition to the existing package export buttons
|
||||||
**Plans**: 3 plans
|
**Plans**: 3 plans
|
||||||
- [ ] 09-01-driver-upload-fix-and-inline-oob-PLAN.md — Fix POST /drivers/upload 500 + add inline upload to printer form with HTMX OOB refresh (UX-01)
|
- [ ] 09-01-driver-upload-fix-and-inline-oob-PLAN.md — Fix POST /drivers/upload 500 + add inline upload to printer form with HTMX OOB refresh (UX-01)
|
||||||
- [ ] 09-02-playwright-port-autofill-PLAN.md — Add Playwright dev dep + headless test for PRNT-03 IP->port auto-fill (UX-02)
|
- [ ] 09-02-playwright-port-autofill-PLAN.md — Add Playwright dev dep + headless test for PRNT-03 IP->port auto-fill (UX-02)
|
||||||
- [ ] 09-03-script-download-links-PLAN.md — Add .ps1 route aliases + printer_detail.html script download links (UX-03)
|
- [ ] 09-03-script-download-links-PLAN.md — Add .ps1 route aliases + printer_detail.html script download links (UX-03)
|
||||||
|
|
||||||
### Phase 10: Real-World Runtime Validation
|
### Phase 10: Real-World Runtime Validation
|
||||||
**Goal**: Generated .intunewin, install, detect, and uninstall artifacts are proven to work end-to-end on a real Intune tenant against a real Windows endpoint, with evidence recorded.
|
**Goal**: Generated .intunewin, install, detect, and uninstall artifacts are proven to work end-to-end on a real Intune tenant against a real Windows endpoint, with evidence recorded.
|
||||||
**Depends on**: Phase 9 (rollout uses the validated-AND-polished build; validation itself only strictly needs v1.0, but running it on the polished build avoids re-doing the pass)
|
**Depends on**: Phase 9 (rollout uses the validated-AND-polished build; validation itself only strictly needs v1.0, but running it on the polished build avoids re-doing the pass)
|
||||||
**Requirements**: RTVAL-01, RTVAL-02, RTVAL-03, RTVAL-04, RTVAL-05
|
**Requirements**: RTVAL-01, RTVAL-02, RTVAL-03, RTVAL-04, RTVAL-05
|
||||||
**Success Criteria** (what must be TRUE):
|
**Success Criteria** (what must be TRUE):
|
||||||
1. A generated `.intunewin` package is uploaded to a real Microsoft Intune tenant and accepted without format errors, with the tenant ingestion confirmation captured as evidence
|
1. A generated `.intunewin` package is uploaded to a real Microsoft Intune tenant and accepted without format errors, with the tenant ingestion confirmation captured as evidence
|
||||||
2. A technician assigning the package to a real Intune-managed Windows endpoint observes the install script succeed under SYSTEM context, with `pnputil` driver staging and `$PSScriptRoot` path resolution verified in the device log
|
2. A technician assigning the package to a real Intune-managed Windows endpoint observes the install script succeed under SYSTEM context, with `pnputil` driver staging and `$PSScriptRoot` path resolution verified in the device log
|
||||||
3. After install, the Intune detection rule driven by the generated detect script reports "installed" for the endpoint
|
3. After install, the Intune detection rule driven by the generated detect script reports "installed" for the endpoint
|
||||||
4. A technician triggering uninstall from Intune sees the printer cleanly removed from the endpoint under SYSTEM context
|
4. A technician triggering uninstall from Intune sees the printer cleanly removed from the endpoint under SYSTEM context
|
||||||
5. A reviewer can open `RUNTIME-VALIDATION.md` and read a signed-off report listing tenant, device, OS build, driver vendor(s), screenshots/logs, and any issues found
|
5. A reviewer can open `RUNTIME-VALIDATION.md` and read a signed-off report listing tenant, device, OS build, driver vendor(s), screenshots/logs, and any issues found
|
||||||
**Plans**: TBD
|
**Plans**: TBD
|
||||||
|
|
||||||
### Phase 11: Real-World Rollout & Feedback
|
### Phase 11: Real-World Rollout & Feedback
|
||||||
**Goal**: ImpTune is running in a real MSP environment, has produced a package that actually reached endpoints, and technician feedback has been captured and triaged.
|
**Goal**: ImpTune is running in a real MSP environment, has produced a package that actually reached endpoints, and technician feedback has been captured and triaged.
|
||||||
**Depends on**: Phase 9 (UX tech debt), Phase 10 (runtime validation passed)
|
**Depends on**: Phase 9 (UX tech debt), Phase 10 (runtime validation passed)
|
||||||
**Requirements**: RWR-01, RWR-02, RWR-03, RWR-04
|
**Requirements**: RWR-01, RWR-02, RWR-03, RWR-04
|
||||||
**Success Criteria** (what must be TRUE):
|
**Success Criteria** (what must be TRUE):
|
||||||
1. ImpTune is running in its single Docker container inside at least one real MSP environment serving real printers, with the host/URL recorded in the feedback document
|
1. ImpTune is running in its single Docker container inside at least one real MSP environment serving real printers, with the host/URL recorded in the feedback document
|
||||||
2. At least one printer deployment package generated by the deployed instance has been pushed to real endpoints via Intune or NinjaRMM end-to-end
|
2. At least one printer deployment package generated by the deployed instance has been pushed to real endpoints via Intune or NinjaRMM end-to-end
|
||||||
3. A reviewer can open `.planning/feedback/v1.1-rollout.md` and read structured feedback from the deploying technician covering what worked, what blocked, and what's missing
|
3. A reviewer can open `.planning/feedback/v1.1-rollout.md` and read structured feedback from the deploying technician covering what worked, what blocked, and what's missing
|
||||||
4. Every feedback item in that document is tagged fix-in-v1.1, defer-to-v1.2, or won't-do with written rationale
|
4. Every feedback item in that document is tagged fix-in-v1.1, defer-to-v1.2, or won't-do with written rationale
|
||||||
**Plans**: TBD
|
**Plans**: TBD
|
||||||
|
|
||||||
## Progress
|
## Progress
|
||||||
|
|
||||||
| Phase | Milestone | Plans Complete | Status | Completed |
|
| Phase | Milestone | Plans Complete | Status | Completed |
|
||||||
|-------|-----------|----------------|----------|------------|
|
|-------|-----------|----------------|----------|------------|
|
||||||
| 1. Foundation | v1.0 | 3/3 | Complete | 2026-04-10 |
|
| 1. Foundation | v1.0 | 3/3 | Complete | 2026-04-10 |
|
||||||
| 2. Driver Management | v1.0 | 2/2 | Complete | 2026-04-10 |
|
| 2. Driver Management | v1.0 | 2/2 | Complete | 2026-04-10 |
|
||||||
| 3. Printer Configuration | v1.0 | 2/2 | Complete | 2026-04-10 |
|
| 3. Printer Configuration | v1.0 | 2/2 | Complete | 2026-04-10 |
|
||||||
| 4. Script Generation | v1.0 | 2/2 | Complete | 2026-04-10 |
|
| 4. Script Generation | v1.0 | 2/2 | Complete | 2026-04-10 |
|
||||||
| 5. Package Export | v1.0 | 2/2 | Complete | 2026-04-10 |
|
| 5. Package Export | v1.0 | 2/2 | Complete | 2026-04-10 |
|
||||||
| 6. Wire Icon into .intunewin | v1.0 | 1/1 | Complete | 2026-04-10 |
|
| 6. Wire Icon into .intunewin | v1.0 | 1/1 | Complete | 2026-04-10 |
|
||||||
| 7. Dashboard & Nav Polish | v1.0 | 1/1 | Complete | 2026-04-13 |
|
| 7. Dashboard & Nav Polish | v1.0 | 1/1 | Complete | 2026-04-13 |
|
||||||
| 8. Nyquist Validation Track | v1.1 | 0/? | Not started | — |
|
| 8. Nyquist Validation Track | v1.1 | 0/? | Not started | — |
|
||||||
| 9. UX Tech Debt Closure | 2/3 | In Progress| | — |
|
| 9. UX Tech Debt Closure | 3/3 | Complete | 2026-04-13 | — |
|
||||||
| 10. Real-World Runtime Validation | v1.1 | 0/? | Not started | — |
|
| 10. Real-World Runtime Validation | v1.1 | 0/? | Not started | — |
|
||||||
| 11. Real-World Rollout & Feedback | v1.1 | 0/? | Not started | — |
|
| 11. Real-World Rollout & Feedback | v1.1 | 0/? | Not started | — |
|
||||||
|
|||||||
+8
-6
@@ -3,14 +3,14 @@ gsd_state_version: 1.0
|
|||||||
milestone: v1.1
|
milestone: v1.1
|
||||||
milestone_name: Hardening & Validation
|
milestone_name: Hardening & Validation
|
||||||
status: Pending (roadmap approved, plans not yet drafted)
|
status: Pending (roadmap approved, plans not yet drafted)
|
||||||
stopped_at: Completed 09-01-driver-upload-fix-and-inline-oob-PLAN.md
|
stopped_at: Completed 09-02-playwright-port-autofill-PLAN.md
|
||||||
last_updated: "2026-04-13T08:53:01.475Z"
|
last_updated: "2026-04-13T08:58:40.338Z"
|
||||||
last_activity: 2026-04-13 — v1.1 roadmap created, 15/15 requirements mapped across Phases 8–11
|
last_activity: 2026-04-13 — v1.1 roadmap created, 15/15 requirements mapped across Phases 8–11
|
||||||
progress:
|
progress:
|
||||||
total_phases: 4
|
total_phases: 4
|
||||||
completed_phases: 0
|
completed_phases: 1
|
||||||
total_plans: 3
|
total_plans: 3
|
||||||
completed_plans: 2
|
completed_plans: 3
|
||||||
---
|
---
|
||||||
|
|
||||||
# Project State
|
# Project State
|
||||||
@@ -63,6 +63,8 @@ Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions ar
|
|||||||
- [Phase 09-ux-tech-debt-closure]: 09-03: Shared _*_response() helper pattern used for route aliases
|
- [Phase 09-ux-tech-debt-closure]: 09-03: Shared _*_response() helper pattern used for route aliases
|
||||||
- [Phase 09]: Sentinel field (caller=printer_form) for OOB branching: chosen over HX-Target header for clarity and testability
|
- [Phase 09]: Sentinel field (caller=printer_form) for OOB branching: chosen over HX-Target header for clarity and testability
|
||||||
- [Phase 09]: HTMX OOB template includes primary fragment + OOB select sibling in driver_upload_with_oob.html
|
- [Phase 09]: HTMX OOB template includes primary fragment + OOB select sibling in driver_upload_with_oob.html
|
||||||
|
- [Phase 09-ux-tech-debt-closure]: 09-02: /printers route used for e2e test (full-page with Alpine.js) — no new /printers/new route needed
|
||||||
|
- [Phase 09-ux-tech-debt-closure]: 09-02: conftest.py adapted — imptune.config uses string paths, init_db() takes no args
|
||||||
|
|
||||||
### Pending Todos
|
### Pending Todos
|
||||||
|
|
||||||
@@ -72,6 +74,6 @@ Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions ar
|
|||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-04-13T08:53:01.469Z
|
Last session: 2026-04-13T08:58:40.331Z
|
||||||
Stopped at: Completed 09-01-driver-upload-fix-and-inline-oob-PLAN.md
|
Stopped at: Completed 09-02-playwright-port-autofill-PLAN.md
|
||||||
Resume file: None
|
Resume file: None
|
||||||
|
|||||||
@@ -0,0 +1,144 @@
|
|||||||
|
---
|
||||||
|
phase: 09-ux-tech-debt-closure
|
||||||
|
plan: 02
|
||||||
|
subsystem: testing
|
||||||
|
tags: [playwright, e2e, chromium, uvicorn, alpine-js, pytest]
|
||||||
|
|
||||||
|
# Dependency graph
|
||||||
|
requires:
|
||||||
|
- phase: 09-01
|
||||||
|
provides: "final printer_form.html with stable ids and inline upload form"
|
||||||
|
provides:
|
||||||
|
- "Playwright headless e2e test suite infrastructure (tests/e2e/ package)"
|
||||||
|
- "UX-02 evidence: live chromium verification of PRNT-03 Alpine IP->port auto-derivation"
|
||||||
|
- "Session-scoped live_server fixture (uvicorn thread, free port, /health readiness)"
|
||||||
|
affects: [09-03, phase-10-rtval, future-e2e]
|
||||||
|
|
||||||
|
# Tech tracking
|
||||||
|
tech-stack:
|
||||||
|
added: [pytest-playwright, playwright, uvicorn (as test server)]
|
||||||
|
patterns: [session-scoped-live-server, playwright-fill-alpine-input, e2e-isolated-from-unit-tests]
|
||||||
|
|
||||||
|
key-files:
|
||||||
|
created:
|
||||||
|
- tests/e2e/__init__.py
|
||||||
|
- tests/e2e/conftest.py
|
||||||
|
- tests/e2e/test_port_autofill.py
|
||||||
|
modified:
|
||||||
|
- requirements-dev.txt
|
||||||
|
- .planning/phases/09-ux-tech-debt-closure/09-VALIDATION.md
|
||||||
|
|
||||||
|
key-decisions:
|
||||||
|
- "Route /printers used for e2e test (full-page route via printers.html extending base.html with Alpine.js loaded) — no new /printers/new route needed"
|
||||||
|
- "conftest.py adapted from plan: config uses string paths (not Path objects), init_db() reads DB_PATH from imptune.config directly"
|
||||||
|
- "playwright install chromium run separately after pip install -r requirements-dev.txt"
|
||||||
|
|
||||||
|
patterns-established:
|
||||||
|
- "E2E fixture pattern: patch imptune.config.* string attrs, call init_db(), start uvicorn thread, poll /health before yielding base_url"
|
||||||
|
- "Alpine @input tested via page.fill() which dispatches native input event + page.wait_for_function for synchronous handler stability"
|
||||||
|
|
||||||
|
requirements-completed: [UX-02]
|
||||||
|
|
||||||
|
# Metrics
|
||||||
|
duration: 3min
|
||||||
|
completed: 2026-04-13
|
||||||
|
---
|
||||||
|
|
||||||
|
# Phase 09 Plan 02: Playwright Port Autofill Summary
|
||||||
|
|
||||||
|
**Playwright headless chromium test verifying Alpine IP->port_name auto-derivation at /printers, with session-scoped uvicorn live_server fixture, closing UX-02**
|
||||||
|
|
||||||
|
## Performance
|
||||||
|
|
||||||
|
- **Duration:** 3 min
|
||||||
|
- **Started:** 2026-04-13T08:54:19Z
|
||||||
|
- **Completed:** 2026-04-13T08:57:31Z
|
||||||
|
- **Tasks:** 2
|
||||||
|
- **Files modified:** 5
|
||||||
|
|
||||||
|
## Accomplishments
|
||||||
|
|
||||||
|
- Playwright e2e package scaffolded (tests/e2e/__init__.py + conftest.py) with session-scoped live_server fixture running uvicorn in a background thread against an isolated tmp data dir
|
||||||
|
- UX-02 Playwright test written and verified green: headless chromium loads /printers, fills ip_address, asserts port_name equals IP_192_168_1_100 — Alpine @input handler confirmed working in real browser
|
||||||
|
- 112 unit tests unaffected (pytest tests/ -x -q --ignore=tests/e2e still passes)
|
||||||
|
|
||||||
|
## Printer Form Route
|
||||||
|
|
||||||
|
The test uses `/printers` (the full-page printers.html that extends base.html and embeds printer_form.html). No new route was needed — the existing /printers route renders the Alpine x-data wrapper with `<script defer src="/static/alpine.min.js">` loaded.
|
||||||
|
|
||||||
|
## Pytest Command and Green Output
|
||||||
|
|
||||||
|
```
|
||||||
|
pytest tests/e2e/test_port_autofill.py -v
|
||||||
|
============================= test session starts =============================
|
||||||
|
platform win32 -- Python 3.14.3, pytest-9.0.3
|
||||||
|
plugins: anyio-4.13.0, base-url-2.1.0, playwright-0.7.2
|
||||||
|
collected 1 item
|
||||||
|
tests/e2e/test_port_autofill.py::test_port_autofill[chromium] PASSED [100%]
|
||||||
|
========================== 1 passed in 6.76s ==============================
|
||||||
|
```
|
||||||
|
|
||||||
|
## 09-VALIDATION.md UX-02 Citation
|
||||||
|
|
||||||
|
Evidence path: `tests/e2e/test_port_autofill.py`
|
||||||
|
Command: `pytest tests/e2e/test_port_autofill.py -v`
|
||||||
|
Result: 1 passed (commit 322fc20)
|
||||||
|
|
||||||
|
Both 09-02-01 and 09-02-02 rows in 09-VALIDATION.md marked green. Wave 0 e2e items checked.
|
||||||
|
|
||||||
|
## Task Commits
|
||||||
|
|
||||||
|
Each task was committed atomically:
|
||||||
|
|
||||||
|
1. **Task 1: Add Playwright dev deps + e2e package scaffolding** - `4e9bd9b` (chore)
|
||||||
|
2. **Task 2: Write UX-02 Playwright test for IP->port auto-fill** - `322fc20` (test)
|
||||||
|
|
||||||
|
**Plan metadata:** (docs commit follows)
|
||||||
|
|
||||||
|
## Files Created/Modified
|
||||||
|
|
||||||
|
- `requirements-dev.txt` - Added pytest-playwright and playwright dev deps
|
||||||
|
- `tests/e2e/__init__.py` - Empty package marker for e2e test suite
|
||||||
|
- `tests/e2e/conftest.py` - Session-scoped live_server fixture (uvicorn + /health poll + tmp data dir)
|
||||||
|
- `tests/e2e/test_port_autofill.py` - UX-02 Playwright headless chromium test (PRNT-03 evidence)
|
||||||
|
- `.planning/phases/09-ux-tech-debt-closure/09-VALIDATION.md` - UX-02 tasks marked green, Wave 0 items checked
|
||||||
|
|
||||||
|
## Decisions Made
|
||||||
|
|
||||||
|
- **Route used:** `/printers` (not `/printers/new`) — the existing full-page printers.html route already loads Alpine.js via base.html and embeds printer_form.html inline, no new route needed
|
||||||
|
- **Config adaptation:** The plan's conftest.py used Path objects but imptune/config.py uses string paths; adapted to patch `cfg.DATA_DIR`, `cfg.DB_PATH`, `cfg.DRIVERS_DIR`, `cfg.ICONS_DIR` as strings and call `init_db()` with no args (reads from patched cfg.DB_PATH)
|
||||||
|
|
||||||
|
## Deviations from Plan
|
||||||
|
|
||||||
|
### Auto-fixed Issues
|
||||||
|
|
||||||
|
**1. [Rule 1 - Bug] Adapted conftest.py to match actual imptune config API**
|
||||||
|
- **Found during:** Task 1 (creating tests/e2e/conftest.py)
|
||||||
|
- **Issue:** Plan's template used `_cfg.DATA_DIR = data_dir` (Path object) and `init_db(data_dir / "imptune.db")` but actual imptune.config uses string attributes and init_db() takes no arguments
|
||||||
|
- **Fix:** Patched cfg.DATA_DIR/DB_PATH/DRIVERS_DIR/ICONS_DIR as strings, called init_db() with no args, also set DATA_DIR env var for lifespan handler
|
||||||
|
- **Files modified:** tests/e2e/conftest.py
|
||||||
|
- **Verification:** Server starts successfully, /health returns 200, Playwright test passes
|
||||||
|
- **Committed in:** 4e9bd9b (Task 1 commit)
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
**Total deviations:** 1 auto-fixed (1 bug — API mismatch in plan template)
|
||||||
|
**Impact on plan:** Fix required for test to run. No scope creep.
|
||||||
|
|
||||||
|
## Issues Encountered
|
||||||
|
|
||||||
|
None beyond the config API mismatch documented above.
|
||||||
|
|
||||||
|
## User Setup Required
|
||||||
|
|
||||||
|
None - no external service configuration required. `pip install -r requirements-dev.txt && playwright install chromium` is all that's needed in dev environments.
|
||||||
|
|
||||||
|
## Next Phase Readiness
|
||||||
|
|
||||||
|
- UX-02 closed: `pytest tests/e2e/test_port_autofill.py -v` is the permanent regression guard for PRNT-03 Alpine port auto-derivation
|
||||||
|
- 09-03 (script download links) can proceed — e2e infrastructure in place for any future e2e tests
|
||||||
|
- Unit test suite unaffected: 112 tests green
|
||||||
|
|
||||||
|
---
|
||||||
|
*Phase: 09-ux-tech-debt-closure*
|
||||||
|
*Completed: 2026-04-13*
|
||||||
Reference in New Issue
Block a user