diff --git a/.planning/REQUIREMENTS.md b/.planning/REQUIREMENTS.md
index b334cad..2046265 100644
--- a/.planning/REQUIREMENTS.md
+++ b/.planning/REQUIREMENTS.md
@@ -19,7 +19,7 @@
### UX Tech Debt (UX)
- [x] **UX-01**: After a new driver is uploaded on the printer form, the DriverDesc dropdown refreshes automatically (no manual page reload) — verified live in browser
-- [ ] **UX-02**: PRNT-03 Alpine.js IP→port auto-derivation is verified live in a real browser session, with the verification recorded in VALIDATION.md
+- [x] **UX-02**: PRNT-03 Alpine.js IP→port auto-derivation is verified live in a real browser session, with the verification recorded in VALIDATION.md
- [x] **UX-03**: The printer detail page exposes direct download links for each generated script (install / uninstall / detect) in addition to the package export buttons
### Nyquist Validation Track (NYQ)
@@ -58,7 +58,7 @@ Carried forward from v1.0 Out of Scope — no change.
| RTVAL-04 | Phase 10 | Pending |
| RTVAL-05 | Phase 10 | Pending |
| UX-01 | Phase 9 | Complete |
-| UX-02 | Phase 9 | Pending |
+| UX-02 | Phase 9 | Complete |
| UX-03 | Phase 9 | Complete |
| NYQ-01 | Phase 8 | Pending |
| NYQ-02 | Phase 8 | Pending |
diff --git a/.planning/ROADMAP.md b/.planning/ROADMAP.md
index 0825ba7..0bf0aad 100644
--- a/.planning/ROADMAP.md
+++ b/.planning/ROADMAP.md
@@ -1,94 +1,94 @@
-# Roadmap: ImpTune
-
-## Milestones
-
-- ✅ **v1.0 MVP** — Phases 1–7, 13 plans, 27/27 requirements (shipped 2026-04-13) — see [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
-- 🚧 **v1.1 Hardening & Validation** — Phases 8–11, 15 requirements (in progress, started 2026-04-13)
-
-## Phases
-
-
-✅ v1.0 MVP (Phases 1–7) — SHIPPED 2026-04-13
-
-- [x] Phase 1: Foundation (3/3 plans) — 2026-04-10
-- [x] Phase 2: Driver Management (2/2 plans) — 2026-04-10
-- [x] Phase 3: Printer Configuration (2/2 plans) — 2026-04-10
-- [x] Phase 4: Script Generation (2/2 plans) — 2026-04-10
-- [x] Phase 5: Package Export (2/2 plans) — 2026-04-10
-- [x] Phase 6: Wire Icon into .intunewin (1/1 plan, gap closure) — 2026-04-10
-- [x] Phase 7: Dashboard & Navigation Polish (1/1 plan, gap closure) — 2026-04-13
-
-Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
-
-
-
-### 🚧 v1.1 Hardening & Validation (Phases 8–11)
-
-- [ ] **Phase 8: Nyquist Validation Track** — Retro-fit Nyquist-compliant VALIDATION.md across all 7 v1.0 phases with evidence-backed checks
-- [ ] **Phase 9: UX Tech Debt Closure** — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use
-- [ ] **Phase 10: Real-World Runtime Validation** — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint
-- [ ] **Phase 11: Real-World Rollout & Feedback** — Deploy the container to a real MSP environment, push a real package, and capture structured technician feedback
-
-## Phase Details
-
-### Phase 8: Nyquist Validation Track
-**Goal**: Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked.
-**Depends on**: Nothing (parallelizable — pure audit of shipped code, no runtime dependency)
-**Requirements**: NYQ-01, NYQ-02, NYQ-03
-**Success Criteria** (what must be TRUE):
- 1. An operator can open any of the 7 v1.0 phase folders and read a `VALIDATION.md` where every success criterion maps to exactly one observable check with cited evidence (commit, test name, file path, or screenshot)
- 2. An operator can open `.planning/milestones/v1.0-VALIDATION-INDEX.md` and see a single pass/fail roll-up across all 7 phases with links to each phase's validation file
- 3. Any validation gap surfaced during the Nyquist pass appears in the index as either a v1.1 defect ticket (linked to the fixing phase) or an explicitly deferred item with written rationale
-**Plans**: TBD
-
-### Phase 9: UX Tech Debt Closure
-**Goal**: The three carried-over UX defects are fixed and live-verified in a real browser so the rolled-out build is the polished one.
-**Depends on**: Nothing (independent of validation and rollout — but must complete before Phase 11)
-**Requirements**: UX-01, UX-02, UX-03
-**Success Criteria** (what must be TRUE):
- 1. A technician uploading a new driver on the printer form sees the new DriverDesc appear in the dropdown without manually reloading the page
- 2. A technician typing an IP address into the printer form sees the port field auto-populate via the PRNT-03 Alpine.js handler, observed live in a real browser and recorded in VALIDATION.md
- 3. A technician on the printer detail page can click direct download links for the install, uninstall, and detect scripts individually, in addition to the existing package export buttons
-**Plans**: 3 plans
- - [ ] 09-01-driver-upload-fix-and-inline-oob-PLAN.md — Fix POST /drivers/upload 500 + add inline upload to printer form with HTMX OOB refresh (UX-01)
- - [ ] 09-02-playwright-port-autofill-PLAN.md — Add Playwright dev dep + headless test for PRNT-03 IP->port auto-fill (UX-02)
- - [ ] 09-03-script-download-links-PLAN.md — Add .ps1 route aliases + printer_detail.html script download links (UX-03)
-
-### Phase 10: Real-World Runtime Validation
-**Goal**: Generated .intunewin, install, detect, and uninstall artifacts are proven to work end-to-end on a real Intune tenant against a real Windows endpoint, with evidence recorded.
-**Depends on**: Phase 9 (rollout uses the validated-AND-polished build; validation itself only strictly needs v1.0, but running it on the polished build avoids re-doing the pass)
-**Requirements**: RTVAL-01, RTVAL-02, RTVAL-03, RTVAL-04, RTVAL-05
-**Success Criteria** (what must be TRUE):
- 1. A generated `.intunewin` package is uploaded to a real Microsoft Intune tenant and accepted without format errors, with the tenant ingestion confirmation captured as evidence
- 2. A technician assigning the package to a real Intune-managed Windows endpoint observes the install script succeed under SYSTEM context, with `pnputil` driver staging and `$PSScriptRoot` path resolution verified in the device log
- 3. After install, the Intune detection rule driven by the generated detect script reports "installed" for the endpoint
- 4. A technician triggering uninstall from Intune sees the printer cleanly removed from the endpoint under SYSTEM context
- 5. A reviewer can open `RUNTIME-VALIDATION.md` and read a signed-off report listing tenant, device, OS build, driver vendor(s), screenshots/logs, and any issues found
-**Plans**: TBD
-
-### Phase 11: Real-World Rollout & Feedback
-**Goal**: ImpTune is running in a real MSP environment, has produced a package that actually reached endpoints, and technician feedback has been captured and triaged.
-**Depends on**: Phase 9 (UX tech debt), Phase 10 (runtime validation passed)
-**Requirements**: RWR-01, RWR-02, RWR-03, RWR-04
-**Success Criteria** (what must be TRUE):
- 1. ImpTune is running in its single Docker container inside at least one real MSP environment serving real printers, with the host/URL recorded in the feedback document
- 2. At least one printer deployment package generated by the deployed instance has been pushed to real endpoints via Intune or NinjaRMM end-to-end
- 3. A reviewer can open `.planning/feedback/v1.1-rollout.md` and read structured feedback from the deploying technician covering what worked, what blocked, and what's missing
- 4. Every feedback item in that document is tagged fix-in-v1.1, defer-to-v1.2, or won't-do with written rationale
-**Plans**: TBD
-
-## Progress
-
-| Phase | Milestone | Plans Complete | Status | Completed |
-|-------|-----------|----------------|----------|------------|
-| 1. Foundation | v1.0 | 3/3 | Complete | 2026-04-10 |
-| 2. Driver Management | v1.0 | 2/2 | Complete | 2026-04-10 |
-| 3. Printer Configuration | v1.0 | 2/2 | Complete | 2026-04-10 |
-| 4. Script Generation | v1.0 | 2/2 | Complete | 2026-04-10 |
-| 5. Package Export | v1.0 | 2/2 | Complete | 2026-04-10 |
-| 6. Wire Icon into .intunewin | v1.0 | 1/1 | Complete | 2026-04-10 |
-| 7. Dashboard & Nav Polish | v1.0 | 1/1 | Complete | 2026-04-13 |
-| 8. Nyquist Validation Track | v1.1 | 0/? | Not started | — |
-| 9. UX Tech Debt Closure | 2/3 | In Progress| | — |
-| 10. Real-World Runtime Validation | v1.1 | 0/? | Not started | — |
-| 11. Real-World Rollout & Feedback | v1.1 | 0/? | Not started | — |
+# Roadmap: ImpTune
+
+## Milestones
+
+- ✅ **v1.0 MVP** — Phases 1–7, 13 plans, 27/27 requirements (shipped 2026-04-13) — see [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
+- 🚧 **v1.1 Hardening & Validation** — Phases 8–11, 15 requirements (in progress, started 2026-04-13)
+
+## Phases
+
+
+✅ v1.0 MVP (Phases 1–7) — SHIPPED 2026-04-13
+
+- [x] Phase 1: Foundation (3/3 plans) — 2026-04-10
+- [x] Phase 2: Driver Management (2/2 plans) — 2026-04-10
+- [x] Phase 3: Printer Configuration (2/2 plans) — 2026-04-10
+- [x] Phase 4: Script Generation (2/2 plans) — 2026-04-10
+- [x] Phase 5: Package Export (2/2 plans) — 2026-04-10
+- [x] Phase 6: Wire Icon into .intunewin (1/1 plan, gap closure) — 2026-04-10
+- [x] Phase 7: Dashboard & Navigation Polish (1/1 plan, gap closure) — 2026-04-13
+
+Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
+
+
+
+### 🚧 v1.1 Hardening & Validation (Phases 8–11)
+
+- [ ] **Phase 8: Nyquist Validation Track** — Retro-fit Nyquist-compliant VALIDATION.md across all 7 v1.0 phases with evidence-backed checks
+- [x] **Phase 9: UX Tech Debt Closure** — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use
(completed 2026-04-13)
+- [ ] **Phase 10: Real-World Runtime Validation** — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint
+- [ ] **Phase 11: Real-World Rollout & Feedback** — Deploy the container to a real MSP environment, push a real package, and capture structured technician feedback
+
+## Phase Details
+
+### Phase 8: Nyquist Validation Track
+**Goal**: Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked.
+**Depends on**: Nothing (parallelizable — pure audit of shipped code, no runtime dependency)
+**Requirements**: NYQ-01, NYQ-02, NYQ-03
+**Success Criteria** (what must be TRUE):
+ 1. An operator can open any of the 7 v1.0 phase folders and read a `VALIDATION.md` where every success criterion maps to exactly one observable check with cited evidence (commit, test name, file path, or screenshot)
+ 2. An operator can open `.planning/milestones/v1.0-VALIDATION-INDEX.md` and see a single pass/fail roll-up across all 7 phases with links to each phase's validation file
+ 3. Any validation gap surfaced during the Nyquist pass appears in the index as either a v1.1 defect ticket (linked to the fixing phase) or an explicitly deferred item with written rationale
+**Plans**: TBD
+
+### Phase 9: UX Tech Debt Closure
+**Goal**: The three carried-over UX defects are fixed and live-verified in a real browser so the rolled-out build is the polished one.
+**Depends on**: Nothing (independent of validation and rollout — but must complete before Phase 11)
+**Requirements**: UX-01, UX-02, UX-03
+**Success Criteria** (what must be TRUE):
+ 1. A technician uploading a new driver on the printer form sees the new DriverDesc appear in the dropdown without manually reloading the page
+ 2. A technician typing an IP address into the printer form sees the port field auto-populate via the PRNT-03 Alpine.js handler, observed live in a real browser and recorded in VALIDATION.md
+ 3. A technician on the printer detail page can click direct download links for the install, uninstall, and detect scripts individually, in addition to the existing package export buttons
+**Plans**: 3 plans
+ - [ ] 09-01-driver-upload-fix-and-inline-oob-PLAN.md — Fix POST /drivers/upload 500 + add inline upload to printer form with HTMX OOB refresh (UX-01)
+ - [ ] 09-02-playwright-port-autofill-PLAN.md — Add Playwright dev dep + headless test for PRNT-03 IP->port auto-fill (UX-02)
+ - [ ] 09-03-script-download-links-PLAN.md — Add .ps1 route aliases + printer_detail.html script download links (UX-03)
+
+### Phase 10: Real-World Runtime Validation
+**Goal**: Generated .intunewin, install, detect, and uninstall artifacts are proven to work end-to-end on a real Intune tenant against a real Windows endpoint, with evidence recorded.
+**Depends on**: Phase 9 (rollout uses the validated-AND-polished build; validation itself only strictly needs v1.0, but running it on the polished build avoids re-doing the pass)
+**Requirements**: RTVAL-01, RTVAL-02, RTVAL-03, RTVAL-04, RTVAL-05
+**Success Criteria** (what must be TRUE):
+ 1. A generated `.intunewin` package is uploaded to a real Microsoft Intune tenant and accepted without format errors, with the tenant ingestion confirmation captured as evidence
+ 2. A technician assigning the package to a real Intune-managed Windows endpoint observes the install script succeed under SYSTEM context, with `pnputil` driver staging and `$PSScriptRoot` path resolution verified in the device log
+ 3. After install, the Intune detection rule driven by the generated detect script reports "installed" for the endpoint
+ 4. A technician triggering uninstall from Intune sees the printer cleanly removed from the endpoint under SYSTEM context
+ 5. A reviewer can open `RUNTIME-VALIDATION.md` and read a signed-off report listing tenant, device, OS build, driver vendor(s), screenshots/logs, and any issues found
+**Plans**: TBD
+
+### Phase 11: Real-World Rollout & Feedback
+**Goal**: ImpTune is running in a real MSP environment, has produced a package that actually reached endpoints, and technician feedback has been captured and triaged.
+**Depends on**: Phase 9 (UX tech debt), Phase 10 (runtime validation passed)
+**Requirements**: RWR-01, RWR-02, RWR-03, RWR-04
+**Success Criteria** (what must be TRUE):
+ 1. ImpTune is running in its single Docker container inside at least one real MSP environment serving real printers, with the host/URL recorded in the feedback document
+ 2. At least one printer deployment package generated by the deployed instance has been pushed to real endpoints via Intune or NinjaRMM end-to-end
+ 3. A reviewer can open `.planning/feedback/v1.1-rollout.md` and read structured feedback from the deploying technician covering what worked, what blocked, and what's missing
+ 4. Every feedback item in that document is tagged fix-in-v1.1, defer-to-v1.2, or won't-do with written rationale
+**Plans**: TBD
+
+## Progress
+
+| Phase | Milestone | Plans Complete | Status | Completed |
+|-------|-----------|----------------|----------|------------|
+| 1. Foundation | v1.0 | 3/3 | Complete | 2026-04-10 |
+| 2. Driver Management | v1.0 | 2/2 | Complete | 2026-04-10 |
+| 3. Printer Configuration | v1.0 | 2/2 | Complete | 2026-04-10 |
+| 4. Script Generation | v1.0 | 2/2 | Complete | 2026-04-10 |
+| 5. Package Export | v1.0 | 2/2 | Complete | 2026-04-10 |
+| 6. Wire Icon into .intunewin | v1.0 | 1/1 | Complete | 2026-04-10 |
+| 7. Dashboard & Nav Polish | v1.0 | 1/1 | Complete | 2026-04-13 |
+| 8. Nyquist Validation Track | v1.1 | 0/? | Not started | — |
+| 9. UX Tech Debt Closure | 3/3 | Complete | 2026-04-13 | — |
+| 10. Real-World Runtime Validation | v1.1 | 0/? | Not started | — |
+| 11. Real-World Rollout & Feedback | v1.1 | 0/? | Not started | — |
diff --git a/.planning/STATE.md b/.planning/STATE.md
index 45e36f5..aa8b806 100644
--- a/.planning/STATE.md
+++ b/.planning/STATE.md
@@ -3,14 +3,14 @@ gsd_state_version: 1.0
milestone: v1.1
milestone_name: Hardening & Validation
status: Pending (roadmap approved, plans not yet drafted)
-stopped_at: Completed 09-01-driver-upload-fix-and-inline-oob-PLAN.md
-last_updated: "2026-04-13T08:53:01.475Z"
+stopped_at: Completed 09-02-playwright-port-autofill-PLAN.md
+last_updated: "2026-04-13T08:58:40.338Z"
last_activity: 2026-04-13 — v1.1 roadmap created, 15/15 requirements mapped across Phases 8–11
progress:
total_phases: 4
- completed_phases: 0
+ completed_phases: 1
total_plans: 3
- completed_plans: 2
+ completed_plans: 3
---
# Project State
@@ -63,6 +63,8 @@ Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions ar
- [Phase 09-ux-tech-debt-closure]: 09-03: Shared _*_response() helper pattern used for route aliases
- [Phase 09]: Sentinel field (caller=printer_form) for OOB branching: chosen over HX-Target header for clarity and testability
- [Phase 09]: HTMX OOB template includes primary fragment + OOB select sibling in driver_upload_with_oob.html
+- [Phase 09-ux-tech-debt-closure]: 09-02: /printers route used for e2e test (full-page with Alpine.js) — no new /printers/new route needed
+- [Phase 09-ux-tech-debt-closure]: 09-02: conftest.py adapted — imptune.config uses string paths, init_db() takes no args
### Pending Todos
@@ -72,6 +74,6 @@ Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions ar
## Session Continuity
-Last session: 2026-04-13T08:53:01.469Z
-Stopped at: Completed 09-01-driver-upload-fix-and-inline-oob-PLAN.md
+Last session: 2026-04-13T08:58:40.331Z
+Stopped at: Completed 09-02-playwright-port-autofill-PLAN.md
Resume file: None
diff --git a/.planning/phases/09-ux-tech-debt-closure/09-02-SUMMARY.md b/.planning/phases/09-ux-tech-debt-closure/09-02-SUMMARY.md
new file mode 100644
index 0000000..50bfa4c
--- /dev/null
+++ b/.planning/phases/09-ux-tech-debt-closure/09-02-SUMMARY.md
@@ -0,0 +1,144 @@
+---
+phase: 09-ux-tech-debt-closure
+plan: 02
+subsystem: testing
+tags: [playwright, e2e, chromium, uvicorn, alpine-js, pytest]
+
+# Dependency graph
+requires:
+ - phase: 09-01
+ provides: "final printer_form.html with stable ids and inline upload form"
+provides:
+ - "Playwright headless e2e test suite infrastructure (tests/e2e/ package)"
+ - "UX-02 evidence: live chromium verification of PRNT-03 Alpine IP->port auto-derivation"
+ - "Session-scoped live_server fixture (uvicorn thread, free port, /health readiness)"
+affects: [09-03, phase-10-rtval, future-e2e]
+
+# Tech tracking
+tech-stack:
+ added: [pytest-playwright, playwright, uvicorn (as test server)]
+ patterns: [session-scoped-live-server, playwright-fill-alpine-input, e2e-isolated-from-unit-tests]
+
+key-files:
+ created:
+ - tests/e2e/__init__.py
+ - tests/e2e/conftest.py
+ - tests/e2e/test_port_autofill.py
+ modified:
+ - requirements-dev.txt
+ - .planning/phases/09-ux-tech-debt-closure/09-VALIDATION.md
+
+key-decisions:
+ - "Route /printers used for e2e test (full-page route via printers.html extending base.html with Alpine.js loaded) — no new /printers/new route needed"
+ - "conftest.py adapted from plan: config uses string paths (not Path objects), init_db() reads DB_PATH from imptune.config directly"
+ - "playwright install chromium run separately after pip install -r requirements-dev.txt"
+
+patterns-established:
+ - "E2E fixture pattern: patch imptune.config.* string attrs, call init_db(), start uvicorn thread, poll /health before yielding base_url"
+ - "Alpine @input tested via page.fill() which dispatches native input event + page.wait_for_function for synchronous handler stability"
+
+requirements-completed: [UX-02]
+
+# Metrics
+duration: 3min
+completed: 2026-04-13
+---
+
+# Phase 09 Plan 02: Playwright Port Autofill Summary
+
+**Playwright headless chromium test verifying Alpine IP->port_name auto-derivation at /printers, with session-scoped uvicorn live_server fixture, closing UX-02**
+
+## Performance
+
+- **Duration:** 3 min
+- **Started:** 2026-04-13T08:54:19Z
+- **Completed:** 2026-04-13T08:57:31Z
+- **Tasks:** 2
+- **Files modified:** 5
+
+## Accomplishments
+
+- Playwright e2e package scaffolded (tests/e2e/__init__.py + conftest.py) with session-scoped live_server fixture running uvicorn in a background thread against an isolated tmp data dir
+- UX-02 Playwright test written and verified green: headless chromium loads /printers, fills ip_address, asserts port_name equals IP_192_168_1_100 — Alpine @input handler confirmed working in real browser
+- 112 unit tests unaffected (pytest tests/ -x -q --ignore=tests/e2e still passes)
+
+## Printer Form Route
+
+The test uses `/printers` (the full-page printers.html that extends base.html and embeds printer_form.html). No new route was needed — the existing /printers route renders the Alpine x-data wrapper with `