docs(09-02): complete playwright-port-autofill plan

- Create 09-02-SUMMARY.md with Playwright e2e evidence for UX-02
- Update STATE.md: decisions, session continuity, progress bar
- Update ROADMAP.md: phase 9 marked complete (3/3 plans with summaries)
- Update REQUIREMENTS.md: UX-02 marked complete
This commit is contained in:
2026-04-13 10:58:51 +02:00
parent 322fc2050f
commit 37a06dac89
4 changed files with 248 additions and 102 deletions
+2 -2
View File
@@ -19,7 +19,7 @@
### UX Tech Debt (UX) ### UX Tech Debt (UX)
- [x] **UX-01**: After a new driver is uploaded on the printer form, the DriverDesc dropdown refreshes automatically (no manual page reload) — verified live in browser - [x] **UX-01**: After a new driver is uploaded on the printer form, the DriverDesc dropdown refreshes automatically (no manual page reload) — verified live in browser
- [ ] **UX-02**: PRNT-03 Alpine.js IP→port auto-derivation is verified live in a real browser session, with the verification recorded in VALIDATION.md - [x] **UX-02**: PRNT-03 Alpine.js IP→port auto-derivation is verified live in a real browser session, with the verification recorded in VALIDATION.md
- [x] **UX-03**: The printer detail page exposes direct download links for each generated script (install / uninstall / detect) in addition to the package export buttons - [x] **UX-03**: The printer detail page exposes direct download links for each generated script (install / uninstall / detect) in addition to the package export buttons
### Nyquist Validation Track (NYQ) ### Nyquist Validation Track (NYQ)
@@ -58,7 +58,7 @@ Carried forward from v1.0 Out of Scope — no change.
| RTVAL-04 | Phase 10 | Pending | | RTVAL-04 | Phase 10 | Pending |
| RTVAL-05 | Phase 10 | Pending | | RTVAL-05 | Phase 10 | Pending |
| UX-01 | Phase 9 | Complete | | UX-01 | Phase 9 | Complete |
| UX-02 | Phase 9 | Pending | | UX-02 | Phase 9 | Complete |
| UX-03 | Phase 9 | Complete | | UX-03 | Phase 9 | Complete |
| NYQ-01 | Phase 8 | Pending | | NYQ-01 | Phase 8 | Pending |
| NYQ-02 | Phase 8 | Pending | | NYQ-02 | Phase 8 | Pending |
+94 -94
View File
@@ -1,94 +1,94 @@
# Roadmap: ImpTune # Roadmap: ImpTune
## Milestones ## Milestones
-**v1.0 MVP** — Phases 17, 13 plans, 27/27 requirements (shipped 2026-04-13) — see [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md) -**v1.0 MVP** — Phases 17, 13 plans, 27/27 requirements (shipped 2026-04-13) — see [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
- 🚧 **v1.1 Hardening & Validation** — Phases 811, 15 requirements (in progress, started 2026-04-13) - 🚧 **v1.1 Hardening & Validation** — Phases 811, 15 requirements (in progress, started 2026-04-13)
## Phases ## Phases
<details> <details>
<summary>✅ v1.0 MVP (Phases 17) — SHIPPED 2026-04-13</summary> <summary>✅ v1.0 MVP (Phases 17) — SHIPPED 2026-04-13</summary>
- [x] Phase 1: Foundation (3/3 plans) — 2026-04-10 - [x] Phase 1: Foundation (3/3 plans) — 2026-04-10
- [x] Phase 2: Driver Management (2/2 plans) — 2026-04-10 - [x] Phase 2: Driver Management (2/2 plans) — 2026-04-10
- [x] Phase 3: Printer Configuration (2/2 plans) — 2026-04-10 - [x] Phase 3: Printer Configuration (2/2 plans) — 2026-04-10
- [x] Phase 4: Script Generation (2/2 plans) — 2026-04-10 - [x] Phase 4: Script Generation (2/2 plans) — 2026-04-10
- [x] Phase 5: Package Export (2/2 plans) — 2026-04-10 - [x] Phase 5: Package Export (2/2 plans) — 2026-04-10
- [x] Phase 6: Wire Icon into .intunewin (1/1 plan, gap closure) — 2026-04-10 - [x] Phase 6: Wire Icon into .intunewin (1/1 plan, gap closure) — 2026-04-10
- [x] Phase 7: Dashboard & Navigation Polish (1/1 plan, gap closure) — 2026-04-13 - [x] Phase 7: Dashboard & Navigation Polish (1/1 plan, gap closure) — 2026-04-13
Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md) Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
</details> </details>
### 🚧 v1.1 Hardening & Validation (Phases 811) ### 🚧 v1.1 Hardening & Validation (Phases 811)
- [ ] **Phase 8: Nyquist Validation Track** — Retro-fit Nyquist-compliant VALIDATION.md across all 7 v1.0 phases with evidence-backed checks - [ ] **Phase 8: Nyquist Validation Track** — Retro-fit Nyquist-compliant VALIDATION.md across all 7 v1.0 phases with evidence-backed checks
- [ ] **Phase 9: UX Tech Debt Closure** — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use - [x] **Phase 9: UX Tech Debt Closure** — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use␍ (completed 2026-04-13)
- [ ] **Phase 10: Real-World Runtime Validation** — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint - [ ] **Phase 10: Real-World Runtime Validation** — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint
- [ ] **Phase 11: Real-World Rollout & Feedback** — Deploy the container to a real MSP environment, push a real package, and capture structured technician feedback - [ ] **Phase 11: Real-World Rollout & Feedback** — Deploy the container to a real MSP environment, push a real package, and capture structured technician feedback
## Phase Details ## Phase Details
### Phase 8: Nyquist Validation Track ### Phase 8: Nyquist Validation Track
**Goal**: Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked. **Goal**: Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked.
**Depends on**: Nothing (parallelizable — pure audit of shipped code, no runtime dependency) **Depends on**: Nothing (parallelizable — pure audit of shipped code, no runtime dependency)
**Requirements**: NYQ-01, NYQ-02, NYQ-03 **Requirements**: NYQ-01, NYQ-02, NYQ-03
**Success Criteria** (what must be TRUE): **Success Criteria** (what must be TRUE):
1. An operator can open any of the 7 v1.0 phase folders and read a `VALIDATION.md` where every success criterion maps to exactly one observable check with cited evidence (commit, test name, file path, or screenshot) 1. An operator can open any of the 7 v1.0 phase folders and read a `VALIDATION.md` where every success criterion maps to exactly one observable check with cited evidence (commit, test name, file path, or screenshot)
2. An operator can open `.planning/milestones/v1.0-VALIDATION-INDEX.md` and see a single pass/fail roll-up across all 7 phases with links to each phase's validation file 2. An operator can open `.planning/milestones/v1.0-VALIDATION-INDEX.md` and see a single pass/fail roll-up across all 7 phases with links to each phase's validation file
3. Any validation gap surfaced during the Nyquist pass appears in the index as either a v1.1 defect ticket (linked to the fixing phase) or an explicitly deferred item with written rationale 3. Any validation gap surfaced during the Nyquist pass appears in the index as either a v1.1 defect ticket (linked to the fixing phase) or an explicitly deferred item with written rationale
**Plans**: TBD **Plans**: TBD
### Phase 9: UX Tech Debt Closure ### Phase 9: UX Tech Debt Closure
**Goal**: The three carried-over UX defects are fixed and live-verified in a real browser so the rolled-out build is the polished one. **Goal**: The three carried-over UX defects are fixed and live-verified in a real browser so the rolled-out build is the polished one.
**Depends on**: Nothing (independent of validation and rollout — but must complete before Phase 11) **Depends on**: Nothing (independent of validation and rollout — but must complete before Phase 11)
**Requirements**: UX-01, UX-02, UX-03 **Requirements**: UX-01, UX-02, UX-03
**Success Criteria** (what must be TRUE): **Success Criteria** (what must be TRUE):
1. A technician uploading a new driver on the printer form sees the new DriverDesc appear in the dropdown without manually reloading the page 1. A technician uploading a new driver on the printer form sees the new DriverDesc appear in the dropdown without manually reloading the page
2. A technician typing an IP address into the printer form sees the port field auto-populate via the PRNT-03 Alpine.js handler, observed live in a real browser and recorded in VALIDATION.md 2. A technician typing an IP address into the printer form sees the port field auto-populate via the PRNT-03 Alpine.js handler, observed live in a real browser and recorded in VALIDATION.md
3. A technician on the printer detail page can click direct download links for the install, uninstall, and detect scripts individually, in addition to the existing package export buttons 3. A technician on the printer detail page can click direct download links for the install, uninstall, and detect scripts individually, in addition to the existing package export buttons
**Plans**: 3 plans **Plans**: 3 plans
- [ ] 09-01-driver-upload-fix-and-inline-oob-PLAN.md — Fix POST /drivers/upload 500 + add inline upload to printer form with HTMX OOB refresh (UX-01) - [ ] 09-01-driver-upload-fix-and-inline-oob-PLAN.md — Fix POST /drivers/upload 500 + add inline upload to printer form with HTMX OOB refresh (UX-01)
- [ ] 09-02-playwright-port-autofill-PLAN.md — Add Playwright dev dep + headless test for PRNT-03 IP->port auto-fill (UX-02) - [ ] 09-02-playwright-port-autofill-PLAN.md — Add Playwright dev dep + headless test for PRNT-03 IP->port auto-fill (UX-02)
- [ ] 09-03-script-download-links-PLAN.md — Add .ps1 route aliases + printer_detail.html script download links (UX-03) - [ ] 09-03-script-download-links-PLAN.md — Add .ps1 route aliases + printer_detail.html script download links (UX-03)
### Phase 10: Real-World Runtime Validation ### Phase 10: Real-World Runtime Validation
**Goal**: Generated .intunewin, install, detect, and uninstall artifacts are proven to work end-to-end on a real Intune tenant against a real Windows endpoint, with evidence recorded. **Goal**: Generated .intunewin, install, detect, and uninstall artifacts are proven to work end-to-end on a real Intune tenant against a real Windows endpoint, with evidence recorded.
**Depends on**: Phase 9 (rollout uses the validated-AND-polished build; validation itself only strictly needs v1.0, but running it on the polished build avoids re-doing the pass) **Depends on**: Phase 9 (rollout uses the validated-AND-polished build; validation itself only strictly needs v1.0, but running it on the polished build avoids re-doing the pass)
**Requirements**: RTVAL-01, RTVAL-02, RTVAL-03, RTVAL-04, RTVAL-05 **Requirements**: RTVAL-01, RTVAL-02, RTVAL-03, RTVAL-04, RTVAL-05
**Success Criteria** (what must be TRUE): **Success Criteria** (what must be TRUE):
1. A generated `.intunewin` package is uploaded to a real Microsoft Intune tenant and accepted without format errors, with the tenant ingestion confirmation captured as evidence 1. A generated `.intunewin` package is uploaded to a real Microsoft Intune tenant and accepted without format errors, with the tenant ingestion confirmation captured as evidence
2. A technician assigning the package to a real Intune-managed Windows endpoint observes the install script succeed under SYSTEM context, with `pnputil` driver staging and `$PSScriptRoot` path resolution verified in the device log 2. A technician assigning the package to a real Intune-managed Windows endpoint observes the install script succeed under SYSTEM context, with `pnputil` driver staging and `$PSScriptRoot` path resolution verified in the device log
3. After install, the Intune detection rule driven by the generated detect script reports "installed" for the endpoint 3. After install, the Intune detection rule driven by the generated detect script reports "installed" for the endpoint
4. A technician triggering uninstall from Intune sees the printer cleanly removed from the endpoint under SYSTEM context 4. A technician triggering uninstall from Intune sees the printer cleanly removed from the endpoint under SYSTEM context
5. A reviewer can open `RUNTIME-VALIDATION.md` and read a signed-off report listing tenant, device, OS build, driver vendor(s), screenshots/logs, and any issues found 5. A reviewer can open `RUNTIME-VALIDATION.md` and read a signed-off report listing tenant, device, OS build, driver vendor(s), screenshots/logs, and any issues found
**Plans**: TBD **Plans**: TBD
### Phase 11: Real-World Rollout & Feedback ### Phase 11: Real-World Rollout & Feedback
**Goal**: ImpTune is running in a real MSP environment, has produced a package that actually reached endpoints, and technician feedback has been captured and triaged. **Goal**: ImpTune is running in a real MSP environment, has produced a package that actually reached endpoints, and technician feedback has been captured and triaged.
**Depends on**: Phase 9 (UX tech debt), Phase 10 (runtime validation passed) **Depends on**: Phase 9 (UX tech debt), Phase 10 (runtime validation passed)
**Requirements**: RWR-01, RWR-02, RWR-03, RWR-04 **Requirements**: RWR-01, RWR-02, RWR-03, RWR-04
**Success Criteria** (what must be TRUE): **Success Criteria** (what must be TRUE):
1. ImpTune is running in its single Docker container inside at least one real MSP environment serving real printers, with the host/URL recorded in the feedback document 1. ImpTune is running in its single Docker container inside at least one real MSP environment serving real printers, with the host/URL recorded in the feedback document
2. At least one printer deployment package generated by the deployed instance has been pushed to real endpoints via Intune or NinjaRMM end-to-end 2. At least one printer deployment package generated by the deployed instance has been pushed to real endpoints via Intune or NinjaRMM end-to-end
3. A reviewer can open `.planning/feedback/v1.1-rollout.md` and read structured feedback from the deploying technician covering what worked, what blocked, and what's missing 3. A reviewer can open `.planning/feedback/v1.1-rollout.md` and read structured feedback from the deploying technician covering what worked, what blocked, and what's missing
4. Every feedback item in that document is tagged fix-in-v1.1, defer-to-v1.2, or won't-do with written rationale 4. Every feedback item in that document is tagged fix-in-v1.1, defer-to-v1.2, or won't-do with written rationale
**Plans**: TBD **Plans**: TBD
## Progress ## Progress
| Phase | Milestone | Plans Complete | Status | Completed | | Phase | Milestone | Plans Complete | Status | Completed |
|-------|-----------|----------------|----------|------------| |-------|-----------|----------------|----------|------------|
| 1. Foundation | v1.0 | 3/3 | Complete | 2026-04-10 | | 1. Foundation | v1.0 | 3/3 | Complete | 2026-04-10 |
| 2. Driver Management | v1.0 | 2/2 | Complete | 2026-04-10 | | 2. Driver Management | v1.0 | 2/2 | Complete | 2026-04-10 |
| 3. Printer Configuration | v1.0 | 2/2 | Complete | 2026-04-10 | | 3. Printer Configuration | v1.0 | 2/2 | Complete | 2026-04-10 |
| 4. Script Generation | v1.0 | 2/2 | Complete | 2026-04-10 | | 4. Script Generation | v1.0 | 2/2 | Complete | 2026-04-10 |
| 5. Package Export | v1.0 | 2/2 | Complete | 2026-04-10 | | 5. Package Export | v1.0 | 2/2 | Complete | 2026-04-10 |
| 6. Wire Icon into .intunewin | v1.0 | 1/1 | Complete | 2026-04-10 | | 6. Wire Icon into .intunewin | v1.0 | 1/1 | Complete | 2026-04-10 |
| 7. Dashboard & Nav Polish | v1.0 | 1/1 | Complete | 2026-04-13 | | 7. Dashboard & Nav Polish | v1.0 | 1/1 | Complete | 2026-04-13 |
| 8. Nyquist Validation Track | v1.1 | 0/? | Not started | — | | 8. Nyquist Validation Track | v1.1 | 0/? | Not started | — |
| 9. UX Tech Debt Closure | 2/3 | In Progress| | — | | 9. UX Tech Debt Closure | 3/3 | Complete | 2026-04-13 | — |
| 10. Real-World Runtime Validation | v1.1 | 0/? | Not started | — | | 10. Real-World Runtime Validation | v1.1 | 0/? | Not started | — |
| 11. Real-World Rollout & Feedback | v1.1 | 0/? | Not started | — | | 11. Real-World Rollout & Feedback | v1.1 | 0/? | Not started | — |
+8 -6
View File
@@ -3,14 +3,14 @@ gsd_state_version: 1.0
milestone: v1.1 milestone: v1.1
milestone_name: Hardening & Validation milestone_name: Hardening & Validation
status: Pending (roadmap approved, plans not yet drafted) status: Pending (roadmap approved, plans not yet drafted)
stopped_at: Completed 09-01-driver-upload-fix-and-inline-oob-PLAN.md stopped_at: Completed 09-02-playwright-port-autofill-PLAN.md
last_updated: "2026-04-13T08:53:01.475Z" last_updated: "2026-04-13T08:58:40.338Z"
last_activity: 2026-04-13 — v1.1 roadmap created, 15/15 requirements mapped across Phases 811 last_activity: 2026-04-13 — v1.1 roadmap created, 15/15 requirements mapped across Phases 811
progress: progress:
total_phases: 4 total_phases: 4
completed_phases: 0 completed_phases: 1
total_plans: 3 total_plans: 3
completed_plans: 2 completed_plans: 3
--- ---
# Project State # Project State
@@ -63,6 +63,8 @@ Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions ar
- [Phase 09-ux-tech-debt-closure]: 09-03: Shared _*_response() helper pattern used for route aliases - [Phase 09-ux-tech-debt-closure]: 09-03: Shared _*_response() helper pattern used for route aliases
- [Phase 09]: Sentinel field (caller=printer_form) for OOB branching: chosen over HX-Target header for clarity and testability - [Phase 09]: Sentinel field (caller=printer_form) for OOB branching: chosen over HX-Target header for clarity and testability
- [Phase 09]: HTMX OOB template includes primary fragment + OOB select sibling in driver_upload_with_oob.html - [Phase 09]: HTMX OOB template includes primary fragment + OOB select sibling in driver_upload_with_oob.html
- [Phase 09-ux-tech-debt-closure]: 09-02: /printers route used for e2e test (full-page with Alpine.js) — no new /printers/new route needed
- [Phase 09-ux-tech-debt-closure]: 09-02: conftest.py adapted — imptune.config uses string paths, init_db() takes no args
### Pending Todos ### Pending Todos
@@ -72,6 +74,6 @@ Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions ar
## Session Continuity ## Session Continuity
Last session: 2026-04-13T08:53:01.469Z Last session: 2026-04-13T08:58:40.331Z
Stopped at: Completed 09-01-driver-upload-fix-and-inline-oob-PLAN.md Stopped at: Completed 09-02-playwright-port-autofill-PLAN.md
Resume file: None Resume file: None
@@ -0,0 +1,144 @@
---
phase: 09-ux-tech-debt-closure
plan: 02
subsystem: testing
tags: [playwright, e2e, chromium, uvicorn, alpine-js, pytest]
# Dependency graph
requires:
- phase: 09-01
provides: "final printer_form.html with stable ids and inline upload form"
provides:
- "Playwright headless e2e test suite infrastructure (tests/e2e/ package)"
- "UX-02 evidence: live chromium verification of PRNT-03 Alpine IP->port auto-derivation"
- "Session-scoped live_server fixture (uvicorn thread, free port, /health readiness)"
affects: [09-03, phase-10-rtval, future-e2e]
# Tech tracking
tech-stack:
added: [pytest-playwright, playwright, uvicorn (as test server)]
patterns: [session-scoped-live-server, playwright-fill-alpine-input, e2e-isolated-from-unit-tests]
key-files:
created:
- tests/e2e/__init__.py
- tests/e2e/conftest.py
- tests/e2e/test_port_autofill.py
modified:
- requirements-dev.txt
- .planning/phases/09-ux-tech-debt-closure/09-VALIDATION.md
key-decisions:
- "Route /printers used for e2e test (full-page route via printers.html extending base.html with Alpine.js loaded) — no new /printers/new route needed"
- "conftest.py adapted from plan: config uses string paths (not Path objects), init_db() reads DB_PATH from imptune.config directly"
- "playwright install chromium run separately after pip install -r requirements-dev.txt"
patterns-established:
- "E2E fixture pattern: patch imptune.config.* string attrs, call init_db(), start uvicorn thread, poll /health before yielding base_url"
- "Alpine @input tested via page.fill() which dispatches native input event + page.wait_for_function for synchronous handler stability"
requirements-completed: [UX-02]
# Metrics
duration: 3min
completed: 2026-04-13
---
# Phase 09 Plan 02: Playwright Port Autofill Summary
**Playwright headless chromium test verifying Alpine IP->port_name auto-derivation at /printers, with session-scoped uvicorn live_server fixture, closing UX-02**
## Performance
- **Duration:** 3 min
- **Started:** 2026-04-13T08:54:19Z
- **Completed:** 2026-04-13T08:57:31Z
- **Tasks:** 2
- **Files modified:** 5
## Accomplishments
- Playwright e2e package scaffolded (tests/e2e/__init__.py + conftest.py) with session-scoped live_server fixture running uvicorn in a background thread against an isolated tmp data dir
- UX-02 Playwright test written and verified green: headless chromium loads /printers, fills ip_address, asserts port_name equals IP_192_168_1_100 — Alpine @input handler confirmed working in real browser
- 112 unit tests unaffected (pytest tests/ -x -q --ignore=tests/e2e still passes)
## Printer Form Route
The test uses `/printers` (the full-page printers.html that extends base.html and embeds printer_form.html). No new route was needed — the existing /printers route renders the Alpine x-data wrapper with `<script defer src="/static/alpine.min.js">` loaded.
## Pytest Command and Green Output
```
pytest tests/e2e/test_port_autofill.py -v
============================= test session starts =============================
platform win32 -- Python 3.14.3, pytest-9.0.3
plugins: anyio-4.13.0, base-url-2.1.0, playwright-0.7.2
collected 1 item
tests/e2e/test_port_autofill.py::test_port_autofill[chromium] PASSED [100%]
========================== 1 passed in 6.76s ==============================
```
## 09-VALIDATION.md UX-02 Citation
Evidence path: `tests/e2e/test_port_autofill.py`
Command: `pytest tests/e2e/test_port_autofill.py -v`
Result: 1 passed (commit 322fc20)
Both 09-02-01 and 09-02-02 rows in 09-VALIDATION.md marked green. Wave 0 e2e items checked.
## Task Commits
Each task was committed atomically:
1. **Task 1: Add Playwright dev deps + e2e package scaffolding** - `4e9bd9b` (chore)
2. **Task 2: Write UX-02 Playwright test for IP->port auto-fill** - `322fc20` (test)
**Plan metadata:** (docs commit follows)
## Files Created/Modified
- `requirements-dev.txt` - Added pytest-playwright and playwright dev deps
- `tests/e2e/__init__.py` - Empty package marker for e2e test suite
- `tests/e2e/conftest.py` - Session-scoped live_server fixture (uvicorn + /health poll + tmp data dir)
- `tests/e2e/test_port_autofill.py` - UX-02 Playwright headless chromium test (PRNT-03 evidence)
- `.planning/phases/09-ux-tech-debt-closure/09-VALIDATION.md` - UX-02 tasks marked green, Wave 0 items checked
## Decisions Made
- **Route used:** `/printers` (not `/printers/new`) — the existing full-page printers.html route already loads Alpine.js via base.html and embeds printer_form.html inline, no new route needed
- **Config adaptation:** The plan's conftest.py used Path objects but imptune/config.py uses string paths; adapted to patch `cfg.DATA_DIR`, `cfg.DB_PATH`, `cfg.DRIVERS_DIR`, `cfg.ICONS_DIR` as strings and call `init_db()` with no args (reads from patched cfg.DB_PATH)
## Deviations from Plan
### Auto-fixed Issues
**1. [Rule 1 - Bug] Adapted conftest.py to match actual imptune config API**
- **Found during:** Task 1 (creating tests/e2e/conftest.py)
- **Issue:** Plan's template used `_cfg.DATA_DIR = data_dir` (Path object) and `init_db(data_dir / "imptune.db")` but actual imptune.config uses string attributes and init_db() takes no arguments
- **Fix:** Patched cfg.DATA_DIR/DB_PATH/DRIVERS_DIR/ICONS_DIR as strings, called init_db() with no args, also set DATA_DIR env var for lifespan handler
- **Files modified:** tests/e2e/conftest.py
- **Verification:** Server starts successfully, /health returns 200, Playwright test passes
- **Committed in:** 4e9bd9b (Task 1 commit)
---
**Total deviations:** 1 auto-fixed (1 bug — API mismatch in plan template)
**Impact on plan:** Fix required for test to run. No scope creep.
## Issues Encountered
None beyond the config API mismatch documented above.
## User Setup Required
None - no external service configuration required. `pip install -r requirements-dev.txt && playwright install chromium` is all that's needed in dev environments.
## Next Phase Readiness
- UX-02 closed: `pytest tests/e2e/test_port_autofill.py -v` is the permanent regression guard for PRNT-03 Alpine port auto-derivation
- 09-03 (script download links) can proceed — e2e infrastructure in place for any future e2e tests
- Unit test suite unaffected: 112 tests green
---
*Phase: 09-ux-tech-debt-closure*
*Completed: 2026-04-13*