docs(10-03): complete branding-data-foundation plan 03
- 10-03-SUMMARY.md: DI registration for Phase 10 services - STATE.md: advanced position, added decision, updated session - ROADMAP.md: phase 10 marked complete (3/3 plans)
This commit is contained in:
114
.planning/phases/10-branding-data-foundation/10-03-SUMMARY.md
Normal file
114
.planning/phases/10-branding-data-foundation/10-03-SUMMARY.md
Normal file
@@ -0,0 +1,114 @@
|
||||
---
|
||||
phase: 10-branding-data-foundation
|
||||
plan: "03"
|
||||
subsystem: infra
|
||||
tags: [di, dependency-injection, ioc-container, branding, graph-directory, wpf]
|
||||
|
||||
# Dependency graph
|
||||
requires:
|
||||
- phase: 10-branding-data-foundation-01
|
||||
provides: "BrandingRepository, IBrandingService/BrandingService"
|
||||
- phase: 10-branding-data-foundation-02
|
||||
provides: "IGraphUserDirectoryService/GraphUserDirectoryService"
|
||||
|
||||
provides:
|
||||
- "BrandingRepository registered as Singleton in DI (branding.json path)"
|
||||
- "IBrandingService/BrandingService registered as Singleton in DI"
|
||||
- "IGraphUserDirectoryService/GraphUserDirectoryService registered as Transient in DI"
|
||||
- "Phase 10 services fully wired — resolvable at runtime"
|
||||
|
||||
affects:
|
||||
- phase-11-report-branding
|
||||
- phase-13-user-directory-viewmodel
|
||||
- phase-14-user-directory-ui
|
||||
|
||||
# Tech tracking
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns:
|
||||
- "Phase 10 DI block placed after SettingsRepository, before MsalClientFactory — grouped with other repository/infrastructure singletons"
|
||||
- "BrandingRepository: Singleton lifetime matching ProfileRepository/SettingsRepository (single file, shared SemaphoreSlim)"
|
||||
- "IBrandingService: Singleton lifetime — stateless after construction, depends on singleton BrandingRepository"
|
||||
- "IGraphUserDirectoryService: Transient lifetime — stateless, per-call, designed for multiple-tenant scenarios"
|
||||
|
||||
key-files:
|
||||
created: []
|
||||
modified:
|
||||
- SharepointToolbox/App.xaml.cs
|
||||
|
||||
key-decisions:
|
||||
- "No new using statements required — SharepointToolbox.Infrastructure.Persistence and SharepointToolbox.Services were already imported from prior phases"
|
||||
|
||||
patterns-established:
|
||||
- "Phase section comment pattern: each new phase block labeled with '// Phase N: Name' comment for orientation in RegisterServices"
|
||||
|
||||
requirements-completed:
|
||||
- BRAND-01
|
||||
- BRAND-03
|
||||
- BRAND-06
|
||||
|
||||
# Metrics
|
||||
duration: 5min
|
||||
completed: 2026-04-08
|
||||
---
|
||||
|
||||
# Phase 10 Plan 03: DI Registration Summary
|
||||
|
||||
**BrandingRepository (Singleton), IBrandingService (Singleton), and IGraphUserDirectoryService (Transient) wired into App.xaml.cs — 224 tests pass, zero regressions**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** ~5 min
|
||||
- **Started:** 2026-04-08T10:34:43Z
|
||||
- **Completed:** 2026-04-08T10:39:00Z
|
||||
- **Tasks:** 1
|
||||
- **Files modified:** 1
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- All three Phase 10 services registered in the application's DI container with correct lifetimes
|
||||
- Main project builds with zero warnings under `-warnaserror`
|
||||
- Full test suite: 224 passed, 26 skipped (integration tests requiring live Graph), 0 failed
|
||||
|
||||
## Task Commits
|
||||
|
||||
Each task was committed atomically:
|
||||
|
||||
1. **Task 1: Register Phase 10 services in DI and run full test suite** - `7e8e228` (feat)
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
- `SharepointToolbox/App.xaml.cs` - Added Phase 10 DI block: BrandingRepository (Singleton, branding.json), IBrandingService/BrandingService (Singleton), IGraphUserDirectoryService/GraphUserDirectoryService (Transient)
|
||||
|
||||
## Decisions Made
|
||||
|
||||
None - followed plan as specified. The `using` directives for `SharepointToolbox.Infrastructure.Persistence` and `SharepointToolbox.Services` were already present, so no additional imports were needed.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None - plan executed exactly as written.
|
||||
|
||||
## Issues Encountered
|
||||
|
||||
One flaky test failure (`CanExport_true_when_has_results`) occurred during the first full suite run. This test uses `WeakReferenceMessenger` with async ViewModel operations and is timing-sensitive. Re-running the specific test and then the full suite both passed. The failure was not caused by my DI changes (the test uses direct constructor injection with mocks — no DI container involved). The test passed on all subsequent runs.
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None - no external service configuration required.
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- All Phase 10 services resolve at runtime without errors
|
||||
- Phase 11 (report branding) can inject `IBrandingService` into export services and ViewModels
|
||||
- Phase 13 (user directory ViewModel) can inject `IGraphUserDirectoryService`
|
||||
- BrandingRepository will create `branding.json` on first write, in the existing AppData directory — no manual setup needed
|
||||
|
||||
---
|
||||
*Phase: 10-branding-data-foundation*
|
||||
*Completed: 2026-04-08*
|
||||
|
||||
## Self-Check: PASSED
|
||||
|
||||
- FOUND: SharepointToolbox/App.xaml.cs (with Phase 10 registrations)
|
||||
- FOUND: .planning/phases/10-branding-data-foundation/10-03-SUMMARY.md
|
||||
- FOUND commit: 7e8e228 (feat(10-03): register Phase 10 services in DI container)
|
||||
Reference in New Issue
Block a user