docs(01-08): complete plan — human visual checkpoint approved, Phase 1 Foundation done
- Task 2 (human-verify checkpoint) approved: all 7 visual checks passed - Updated SUMMARY to document 3 runtime fix commits (DI registration, FR translations) - STATE.md: plan complete, session updated - ROADMAP.md: Phase 1 confirmed Complete 8/8 Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -3,8 +3,8 @@ gsd_state_version: 1.0
|
|||||||
milestone: v1.0
|
milestone: v1.0
|
||||||
milestone_name: milestone
|
milestone_name: milestone
|
||||||
status: planning
|
status: planning
|
||||||
stopped_at: "Checkpoint: 01-08 human-verify — awaiting visual inspection of WPF application"
|
stopped_at: Completed 01-08-PLAN.md — Phase 1 Foundation complete, human visual checkpoint approved
|
||||||
last_updated: "2026-04-02T10:42:59.564Z"
|
last_updated: "2026-04-02T10:55:12.452Z"
|
||||||
last_activity: 2026-04-02 — Roadmap created, requirements mapped, all 42 v1 requirements assigned to phases
|
last_activity: 2026-04-02 — Roadmap created, requirements mapped, all 42 v1 requirements assigned to phases
|
||||||
progress:
|
progress:
|
||||||
total_phases: 5
|
total_phases: 5
|
||||||
@@ -58,6 +58,7 @@ Progress: [█░░░░░░░░░] 13%
|
|||||||
| Phase 01-foundation P06 | 5 | 2 tasks | 12 files |
|
| Phase 01-foundation P06 | 5 | 2 tasks | 12 files |
|
||||||
| Phase 01-foundation P07 | 3 | 2 tasks | 8 files |
|
| Phase 01-foundation P07 | 3 | 2 tasks | 8 files |
|
||||||
| Phase 01-foundation P08 | 5 | 1 tasks | 1 files |
|
| Phase 01-foundation P08 | 5 | 1 tasks | 1 files |
|
||||||
|
| Phase 01-foundation P08 | 15 | 2 tasks | 3 files |
|
||||||
|
|
||||||
## Accumulated Context
|
## Accumulated Context
|
||||||
|
|
||||||
@@ -106,6 +107,6 @@ None yet.
|
|||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-04-02T10:42:59.562Z
|
Last session: 2026-04-02T10:55:12.450Z
|
||||||
Stopped at: Checkpoint: 01-08 human-verify — awaiting visual inspection of WPF application
|
Stopped at: Completed 01-08-PLAN.md — Phase 1 Foundation complete, human visual checkpoint approved
|
||||||
Resume file: None
|
Resume file: None
|
||||||
|
|||||||
@@ -2,7 +2,7 @@
|
|||||||
phase: 01-foundation
|
phase: 01-foundation
|
||||||
plan: 08
|
plan: 08
|
||||||
subsystem: testing
|
subsystem: testing
|
||||||
tags: [xunit, dotnet, wpf, build-verification]
|
tags: [xunit, dotnet, wpf, build-verification, localization, dependency-injection]
|
||||||
|
|
||||||
# Dependency graph
|
# Dependency graph
|
||||||
requires:
|
requires:
|
||||||
@@ -11,9 +11,10 @@ requires:
|
|||||||
provides:
|
provides:
|
||||||
- Confirmed zero-failure test suite (44 pass, 1 skip)
|
- Confirmed zero-failure test suite (44 pass, 1 skip)
|
||||||
- Confirmed zero-warning, zero-error build with -warnaserror
|
- Confirmed zero-warning, zero-error build with -warnaserror
|
||||||
- Green light for Phase 2 pending human visual checkpoint approval
|
- Human-verified WPF shell: 8 tabs, log panel, language switching, profile CRUD all confirmed working
|
||||||
|
- Phase 1 Foundation complete — green light for Phase 2 (Permissions)
|
||||||
affects:
|
affects:
|
||||||
- 02-permissions (blocked until human-verify checkpoint approved)
|
- 02-permissions (Phase 1 complete, Phase 2 planning can begin)
|
||||||
|
|
||||||
# Tech tracking
|
# Tech tracking
|
||||||
tech-stack:
|
tech-stack:
|
||||||
@@ -25,7 +26,8 @@ tech-stack:
|
|||||||
key-files:
|
key-files:
|
||||||
created: []
|
created: []
|
||||||
modified:
|
modified:
|
||||||
- .planning/config.json (orchestrator added _auto_chain_active flag)
|
- SharepointToolbox/App.xaml.cs (DI registration fixes for ProfileRepository and SettingsRepository)
|
||||||
|
- SharepointToolbox/Localization/Strings.fr.resx (real French translations replacing English stubs)
|
||||||
|
|
||||||
key-decisions:
|
key-decisions:
|
||||||
- "Solution file is .slnx (not .sln) — dotnet build/test commands must use SharepointToolbox.slnx"
|
- "Solution file is .slnx (not .sln) — dotnet build/test commands must use SharepointToolbox.slnx"
|
||||||
@@ -48,39 +50,48 @@ requirements-completed:
|
|||||||
- FOUND-12
|
- FOUND-12
|
||||||
|
|
||||||
# Metrics
|
# Metrics
|
||||||
duration: 5min
|
duration: 15min
|
||||||
completed: 2026-04-02
|
completed: 2026-04-02
|
||||||
---
|
---
|
||||||
|
|
||||||
# Phase 1 Plan 08: Final Verification Summary
|
# Phase 1 Plan 08: Final Verification Summary
|
||||||
|
|
||||||
**Full test suite passes (44/44 non-interactive tests green) and build is warning-free under -warnaserror; awaiting human visual checkpoint to confirm WPF shell, localization, and profile UI look and behave correctly**
|
**Full test suite passes (44/44 non-interactive tests green), build warning-free under -warnaserror, and human visual checkpoint confirmed WPF shell with 8 tabs, log panel, language switching, and profile CRUD all working correctly — Phase 1 complete**
|
||||||
|
|
||||||
## Performance
|
## Performance
|
||||||
|
|
||||||
- **Duration:** ~5 min
|
- **Duration:** ~15 min (including checkpoint fixes)
|
||||||
- **Started:** 2026-04-02T10:41:13Z
|
- **Started:** 2026-04-02T10:41:13Z
|
||||||
- **Completed:** 2026-04-02T10:46:00Z (Task 1 only — checkpoint pause)
|
- **Completed:** 2026-04-02T10:52:16Z
|
||||||
- **Tasks:** 1 of 2 completed (Task 2 is a human-verify checkpoint)
|
- **Tasks:** 2 of 2 completed
|
||||||
- **Files modified:** 1 (.planning/config.json — orchestrator flag)
|
- **Files modified:** 3
|
||||||
|
|
||||||
## Accomplishments
|
## Accomplishments
|
||||||
|
|
||||||
- dotnet build SharepointToolbox.slnx with -warnaserror: 0 warnings, 0 errors
|
- dotnet build SharepointToolbox.slnx with -warnaserror: 0 warnings, 0 errors
|
||||||
- dotnet test: 44 passed, 1 skipped (interactive MSAL — expected), 0 failed
|
- dotnet test: 44 passed, 1 skipped (interactive MSAL — expected), 0 failed
|
||||||
- Build time 1.58s, test run 0.87s — fast baseline confirmed
|
- Build time 1.58s, test run 0.87s — fast baseline confirmed
|
||||||
|
- Human visual checkpoint approved: all 7 checklist items verified (shell layout, tab headers, language switch, profile management, log panel, data folder, log file)
|
||||||
|
- Fixed 3 runtime issues discovered during application launch: missing DI registrations and stub French translations
|
||||||
|
|
||||||
## Task Commits
|
## Task Commits
|
||||||
|
|
||||||
Each task committed atomically:
|
Each task committed atomically:
|
||||||
|
|
||||||
1. **Task 1: Run full test suite and verify zero failures** - `334a5f1` (chore)
|
1. **Task 1: Run full test suite and verify zero failures** - `334a5f1` (chore)
|
||||||
|
2. **Task 2: Visual/functional verification checkpoint** - Human approved (no code commit — verification task)
|
||||||
|
|
||||||
**Plan metadata commit:** pending (after human checkpoint approval)
|
**Fix commits (deviations auto-fixed before checkpoint):**
|
||||||
|
- `c66efda` — fix: register ProfileRepository and SettingsRepository in DI container
|
||||||
|
- `6211f65` — fix: provide file paths to ProfileRepository and SettingsRepository via factory registration
|
||||||
|
- `0b8a86a` — fix: add real French translations (stubs were identical to English)
|
||||||
|
|
||||||
|
**Plan metadata:** pending (this commit)
|
||||||
|
|
||||||
## Files Created/Modified
|
## Files Created/Modified
|
||||||
|
|
||||||
- `.planning/config.json` - Added `_auto_chain_active: false` flag by orchestrator (minor)
|
- `SharepointToolbox/App.xaml.cs` - Added DI registrations for ProfileRepository and SettingsRepository with correct file paths
|
||||||
|
- `SharepointToolbox/Localization/Strings.fr.resx` - Replaced English-copy stubs with actual French translations for all UI strings
|
||||||
|
|
||||||
## Decisions Made
|
## Decisions Made
|
||||||
|
|
||||||
@@ -89,11 +100,32 @@ Each task committed atomically:
|
|||||||
|
|
||||||
## Deviations from Plan
|
## Deviations from Plan
|
||||||
|
|
||||||
None - plan executed exactly as written.
|
### Auto-fixed Issues
|
||||||
|
|
||||||
|
**1. [Rule 3 - Blocking] ProfileRepository and SettingsRepository not registered in DI container**
|
||||||
|
- **Found during:** Task 2 (application launch for visual verification)
|
||||||
|
- **Issue:** App crashed on startup — IProfileRepository and ISettingsRepository not registered in the DI container; MainWindowViewModel constructor injection failed with a missing service exception
|
||||||
|
- **Fix:** Registered both repositories in App.xaml.cs using factory lambdas that provide the correct AppData file paths for profiles.json and settings.json
|
||||||
|
- **Files modified:** SharepointToolbox/App.xaml.cs
|
||||||
|
- **Verification:** Application launched successfully after fix
|
||||||
|
- **Committed in:** c66efda + 6211f65 (two-step fix — registration then path injection)
|
||||||
|
|
||||||
|
**2. [Rule 1 - Bug] French translations were identical to English (stub copy)**
|
||||||
|
- **Found during:** Task 2 (language switch verification step)
|
||||||
|
- **Issue:** Switching language to French showed English text — Strings.fr.resx contained English strings copied verbatim from Strings.resx with no actual translations
|
||||||
|
- **Fix:** Replaced all 27 stub entries with correct French translations for all UI strings (tab headers, toolbar labels, dialog buttons, settings labels, log messages)
|
||||||
|
- **Files modified:** SharepointToolbox/Localization/Strings.fr.resx
|
||||||
|
- **Verification:** Language switch in Settings tab now shows French tab headers and UI labels correctly
|
||||||
|
- **Committed in:** 0b8a86a
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
**Total deviations:** 3 commits auto-fixed (1 Rule 3 blocking crash + 1 Rule 1 bug — stub translations)
|
||||||
|
**Impact on plan:** All fixes were necessary for the application to function correctly. DI registration was a blocking runtime crash; French translations were a correctness bug that would have left FR locale non-functional. No scope creep.
|
||||||
|
|
||||||
## Issues Encountered
|
## Issues Encountered
|
||||||
|
|
||||||
None — build and tests clean on first run.
|
None beyond the auto-fixed deviations above.
|
||||||
|
|
||||||
## User Setup Required
|
## User Setup Required
|
||||||
|
|
||||||
@@ -101,13 +133,19 @@ None - no external service configuration required.
|
|||||||
|
|
||||||
## Next Phase Readiness
|
## Next Phase Readiness
|
||||||
|
|
||||||
- All automated checks passed
|
- Phase 1 Foundation is complete — all 11 requirements (FOUND-01 through FOUND-12 excluding FOUND-11) delivered
|
||||||
- Awaiting human visual verification checkpoint (Task 2) to confirm:
|
- Human visual checkpoint confirmed: shell, tabs, log panel, language switching, profile management all working
|
||||||
- WPF shell launches with 8 tabs, log panel, status bar
|
- Ready to begin Phase 2 (Permissions): PermissionsService, scan logic, CSV/HTML export
|
||||||
- Language switching (EN/FR) works without restart
|
- FOUND-11 (self-contained EXE packaging) is deferred to Phase 5 as planned
|
||||||
- Profile management dialog (add/rename/delete) functions correctly
|
|
||||||
- Log panel shows timestamped colored entries
|
## Self-Check: PASSED
|
||||||
- Once human approves checkpoint: Phase 1 is complete, ready to begin Phase 2 (Permissions)
|
|
||||||
|
- FOUND: SharepointToolbox/App.xaml.cs (contains ProfileRepository + SettingsRepository DI registrations)
|
||||||
|
- FOUND: SharepointToolbox/Localization/Strings.fr.resx (contains real French translations)
|
||||||
|
- Commit 334a5f1: chore(01-08): run full test suite — 44 passed, 1 skipped, 0 failed
|
||||||
|
- Commit c66efda: fix(01-08): register ProfileRepository and SettingsRepository in DI container
|
||||||
|
- Commit 6211f65: fix(01-08): provide file paths to ProfileRepository and SettingsRepository via factory registration
|
||||||
|
- Commit 0b8a86a: fix(01-08): add real French translations (stubs were identical to English)
|
||||||
|
|
||||||
---
|
---
|
||||||
*Phase: 01-foundation*
|
*Phase: 01-foundation*
|
||||||
|
|||||||
Reference in New Issue
Block a user