docs(08-02): complete phase 8 — Task 3 approved, STATE and SUMMARY updated
- Mark Task 3 (human-verify checkpoint) as user-approved - Update SUMMARY.md to reflect all 3 tasks complete - Update STATE.md: Phase 8 complete, THEME-01/THEME-02 satisfied - Progress: 50% (2 of 4 v1.2 phases complete) Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
+17
-17
@@ -2,16 +2,16 @@
|
|||||||
gsd_state_version: 1.0
|
gsd_state_version: 1.0
|
||||||
milestone: v1.2
|
milestone: v1.2
|
||||||
milestone_name: UI Polish & Clarity
|
milestone_name: UI Polish & Clarity
|
||||||
status: planning
|
status: in-progress
|
||||||
stopped_at: "Paused at 08-02 Task 3 checkpoint:human-verify — Tasks 1 and 2 complete"
|
stopped_at: "Completed 08-02 — Phase 8 (Theme Foundation) fully complete"
|
||||||
last_updated: "2026-04-01T03:11:29.243Z"
|
last_updated: "2026-04-01T05:15:00Z"
|
||||||
last_activity: 2026-03-31 — Roadmap created for v1.2
|
last_activity: 2026-04-01 — Phase 8 complete (theme tokens + component migration)
|
||||||
progress:
|
progress:
|
||||||
total_phases: 4
|
total_phases: 4
|
||||||
completed_phases: 1
|
completed_phases: 2
|
||||||
total_plans: 2
|
total_plans: 4
|
||||||
completed_plans: 2
|
completed_plans: 4
|
||||||
percent: 0
|
percent: 50
|
||||||
---
|
---
|
||||||
|
|
||||||
# Project State
|
# Project State
|
||||||
@@ -25,12 +25,12 @@ See: .planning/PROJECT.md (updated 2026-03-31)
|
|||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
Phase: 8 of 11 (Theme Foundation) — not yet started
|
Phase: 8 of 11 (Theme Foundation) — COMPLETE
|
||||||
Plan: —
|
Plan: 08-02 (complete)
|
||||||
Status: Ready to plan Phase 8
|
Status: Phase 8 complete, ready for Phase 9
|
||||||
Last activity: 2026-03-31 — Roadmap created for v1.2
|
Last activity: 2026-04-01 — Phase 8 complete (THEME-01, THEME-02 satisfied)
|
||||||
|
|
||||||
Progress: [░░░░░░░░░░] 0% (v1.2)
|
Progress: [█████░░░░░] 50% (v1.2)
|
||||||
|
|
||||||
## Accumulated Context
|
## Accumulated Context
|
||||||
|
|
||||||
@@ -46,6 +46,7 @@ Recent decisions affecting current work:
|
|||||||
- [Phase 08-01]: vi.stubGlobal for localStorage/matchMedia in tests — Node v25 experimental WebStorage breaks standard Storage API in jsdom environment
|
- [Phase 08-01]: vi.stubGlobal for localStorage/matchMedia in tests — Node v25 experimental WebStorage breaks standard Storage API in jsdom environment
|
||||||
- [Phase 08-02]: Mechanical migration only — zero DOM structure changes, only className strings replaced
|
- [Phase 08-02]: Mechanical migration only — zero DOM structure changes, only className strings replaced
|
||||||
- [Phase 08-02]: Post-migration grep check is mandatory — replace_all can miss occurrences in dual-branch components with identical className strings
|
- [Phase 08-02]: Post-migration grep check is mandatory — replace_all can miss occurrences in dual-branch components with identical className strings
|
||||||
|
- [Phase 08-02]: User visually confirmed light/dark theme renders correctly across all 4 wizard steps — THEME-01 and THEME-02 complete
|
||||||
|
|
||||||
### Pending Todos
|
### Pending Todos
|
||||||
|
|
||||||
@@ -53,11 +54,10 @@ None yet.
|
|||||||
|
|
||||||
### Blockers/Concerns
|
### Blockers/Concerns
|
||||||
|
|
||||||
- 73 hardcoded color classes need migration to semantic tokens (Phase 9 risk)
|
- 131 test selectors could break during component restyling — one-component-at-a-time discipline required (ongoing, Phase 9+)
|
||||||
- 131 test selectors could break during component restyling — one-component-at-a-time discipline required
|
|
||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-04-01T03:11:29.240Z
|
Last session: 2026-04-01T05:15:00Z
|
||||||
Stopped at: Paused at 08-02 Task 3 checkpoint:human-verify — Tasks 1 and 2 complete
|
Stopped at: Completed 08-02 — Phase 8 (Theme Foundation) fully complete
|
||||||
Resume file: None
|
Resume file: None
|
||||||
|
|||||||
@@ -59,7 +59,7 @@ completed: 2026-04-01
|
|||||||
- **Duration:** 6 min
|
- **Duration:** 6 min
|
||||||
- **Started:** 2026-04-01T05:03:01Z
|
- **Started:** 2026-04-01T05:03:01Z
|
||||||
- **Completed:** 2026-04-01T05:09:00Z
|
- **Completed:** 2026-04-01T05:09:00Z
|
||||||
- **Tasks:** 2 completed (Task 3 is a human-verify checkpoint — paused)
|
- **Tasks:** 3 (2 auto + 1 human-verify checkpoint — user approved)
|
||||||
- **Files modified:** 9
|
- **Files modified:** 9
|
||||||
|
|
||||||
## Accomplishments
|
## Accomplishments
|
||||||
@@ -75,7 +75,7 @@ Each task was committed atomically:
|
|||||||
|
|
||||||
1. **Task 1: Migrate UI primitives (BackendCard, FieldRenderer, PasswordField)** - `4e30f2e` (feat)
|
1. **Task 1: Migrate UI primitives (BackendCard, FieldRenderer, PasswordField)** - `4e30f2e` (feat)
|
||||||
2. **Task 2: Migrate wizard components (toggles, steps, output block)** - `1ac32ea` (feat)
|
2. **Task 2: Migrate wizard components (toggles, steps, output block)** - `1ac32ea` (feat)
|
||||||
3. **Task 3: Visual verification** - checkpoint: human-verify (pending)
|
3. **Task 3: Visual verification** - checkpoint: human-verify (user approved)
|
||||||
|
|
||||||
**Plan metadata:** _(docs commit follows)_
|
**Plan metadata:** _(docs commit follows)_
|
||||||
|
|
||||||
@@ -125,8 +125,8 @@ None — no external service configuration required.
|
|||||||
|
|
||||||
- Zero hardcoded Tailwind color classes remain in `src/components/` and `src/App.tsx`
|
- Zero hardcoded Tailwind color classes remain in `src/components/` and `src/App.tsx`
|
||||||
- The entire UI is now driven by CSS custom properties — light/dark theme switching is fully functional via the `.dark` class on `<html>`
|
- The entire UI is now driven by CSS custom properties — light/dark theme switching is fully functional via the `.dark` class on `<html>`
|
||||||
- Task 3 is a human-verify checkpoint: user must visually confirm both light and dark themes render correctly in the browser (`npm run dev`, http://localhost:5173)
|
- Visual verification approved: user confirmed both light and dark themes render correctly across all 4 wizard steps including backend cards, form inputs, code output blocks, success/warning notices, and navigation buttons
|
||||||
- After visual approval, Phase 8 is complete (THEME-01 and THEME-02 requirements satisfied)
|
- Phase 8 is complete (THEME-01 and THEME-02 requirements satisfied)
|
||||||
- No blockers for Phase 9+ (content refinement, polish)
|
- No blockers for Phase 9+ (content refinement, polish)
|
||||||
|
|
||||||
---
|
---
|
||||||
|
|||||||
Reference in New Issue
Block a user