--- gsd_state_version: 1.0 milestone: v1.1 milestone_name: Hardening & Validation status: in-progress — plan 10-02 advanced; RTVAL-01 PASS, RTVAL-02 PASS (attestation-only, no artifact); paused at Task 3 (RTVAL-03 detection rule) stopped_at: 10-02-live-intune-runtime-validation-PLAN.md — Task 3 (RTVAL-03) human-action checkpoint awaiting technician on-device install evidence last_updated: "2026-04-13T00:00:00.000Z" last_activity: 2026-04-13 — RTVAL-02 recorded PASS (attestation-only, no artifact; user approved proceeding without evidence); plan 10-02 paused at Task 3 (RTVAL-03) progress: total_phases: 4 completed_phases: 1 total_plans: 4 completed_plans: 4 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-04-13 after v1.0 milestone) **Core value:** Generate a complete, working printer deployment package (script + drivers + icon) in minutes instead of manually scripting each printer setup. **Current focus:** v1.1 Hardening & Validation — Phase 8 (Nyquist Validation Track) ## Current Position Milestone: v1.1 Hardening & Validation Phase: 10 — Real-World Runtime Validation Plan: 02 in progress — Task 1 PASS (RTVAL-01), Task 2 PASS (RTVAL-02, attestation-only); paused at Task 3 (RTVAL-03) human-action checkpoint Status: in-progress — awaiting technician evidence for RTVAL-03 (detection rule reports Installed) Decision: Resume plan 10-02 after HMAC scope + Detection.xml generator fixes landed (commits 74535ea, 7716246); ISSUE-01 resolved. RTVAL-02 accepted as attestation-only PASS per explicit user approval 2026-04-13. Last activity: 2026-04-13 — RTVAL-02 PASS (attestation, commit 870158b); plan 10-02 paused at Task 3 checkpoint ## Milestone History - **v1.0** — ImpTune MVP (shipped 2026-04-13) — see [MILESTONES.md](MILESTONES.md) ## Accumulated Context ### v1.1 Phase Structure - Phase 8: Nyquist Validation Track (NYQ-01..03) — parallelizable audit track - Phase 9: UX Tech Debt Closure (UX-01..03) — must land before rollout - Phase 10: Real-World Runtime Validation (RTVAL-01..05) — must pass before rollout - Phase 11: Real-World Rollout & Feedback (RWR-01..04) — depends on Phases 9 + 10 ### Open Concerns (now owned by v1.1 phases) - Real-world Intune tenant .intunewin acceptance → Phase 10 (RTVAL-01) - `pnputil` + `$PSScriptRoot` under SYSTEM → Phase 10 (RTVAL-02..04) - Driver dropdown refresh after upload → Phase 9 (UX-01) - PRNT-03 Alpine.js port auto-derivation live verification → Phase 9 (UX-02) - Individual script download links on printer detail page → Phase 9 (UX-03) - Nyquist-compliant VALIDATION.md across v1.0 phases → Phase 8 (NYQ-01..03) ### Decisions - **Phase ordering:** RTVAL before RWR (cannot deploy unvalidated runtime); UX before RWR (deployed build must be polished); NYQ parallel to all (pure audit, no code dependency) — placed first so v1.0 validation evidence is fresh before runtime work begins. - **RTVAL grouping:** RTVAL-01..05 combined into single Phase 10 because they share setup (same tenant, same test endpoint, same RUNTIME-VALIDATION.md report). - **NYQ as dedicated phase:** Kept standalone (not absorbed) because it audits all 7 v1.0 phases and its evidence feeds defect triage into Phases 9/10. Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions archived in `milestones/v1.0-ROADMAP.md`. - [Phase 09-ux-tech-debt-closure]: 09-03: .ps1 routes added as aliases (not renames) to preserve backward compatibility - [Phase 09-ux-tech-debt-closure]: 09-03: Shared _*_response() helper pattern used for route aliases - [Phase 09]: Sentinel field (caller=printer_form) for OOB branching: chosen over HX-Target header for clarity and testability - [Phase 09]: HTMX OOB template includes primary fragment + OOB select sibling in driver_upload_with_oob.html - [Phase 09-ux-tech-debt-closure]: 09-02: /printers route used for e2e test (full-page with Alpine.js) — no new /printers/new route needed - [Phase 09-ux-tech-debt-closure]: 09-02: conftest.py adapted — imptune.config uses string paths, init_db() takes no args - [Phase 10-real-world-runtime-validation]: 10-01: Package under test is Ricoh PCL6 Universal Print (Copieur_2eme.intunewin), ImpTune commit 1c3f458, committed to evidence/ for traceability - [Phase 10-real-world-runtime-validation]: 10-01: Commit SHA locked before runtime testing — all RTVAL results reference this exact build - [Phase 10-real-world-runtime-validation]: 10-02: RTVAL-01 FAIL — Stop plan 10-02; surface .intunewin structure defect as gap; use /gsd:debug on generator or /gsd:plan-phase 10 --gaps before retesting - [Phase 10-real-world-runtime-validation]: 10-02: RTVAL-01 PASS on re-test (2026-04-13) — ISSUE-01 resolved by commits 74535ea (HMAC over IV+ciphertext) and 7716246 (Detection.xml alignment with IntuneWinAppUtil.exe reference format); plan resumed at Task 2 - [Phase 10-real-world-runtime-validation]: 10-02: RTVAL-02 accepted as attestation-only PASS (2026-04-13) — technician verbally confirmed install succeeded on ARES-5CG5220YTM but did NOT provide IntuneManagementExtension.log excerpt or portal screenshot; user explicitly approved "Pass without evidence"; audit trail weakened for this check and flagged in RUNTIME-VALIDATION.md Notes ### Active Blockers None. BLOCKER-01 resolved 2026-04-13 via commits 74535ea (HMAC over IV+ciphertext) and 7716246 (Detection.xml aligned with IntuneWinAppUtil.exe reference format); RTVAL-01 re-tested PASS on fixed build. ### Pending Todos - Run `/gsd:plan-phase 8` to draft plans for Nyquist Validation Track - Schedule real Intune tenant + test endpoint access for Phase 10 - Identify target MSP environment for Phase 11 rollout ## Session Continuity Last session: 2026-04-13T00:00:00.000Z Stopped at: 10-02-live-intune-runtime-validation — Task 3 (RTVAL-03) human-action checkpoint; awaiting technician evidence for detection rule (Intune "Installed" + manual detect script exit 0 + printer visible) Resume file: .planning/phases/10-real-world-runtime-validation/10-02-live-intune-runtime-validation-PLAN.md