--- phase: 10-real-world-runtime-validation plan: 03 subsystem: validation/reporting tags: [runtime-validation, sign-off, phase-closure, rtval] requirements: [RTVAL-05] dependency_graph: requires: [10-01, 10-02] provides: [signed-off RUNTIME-VALIDATION.md, Phase 10 closure] affects: [.planning/REQUIREMENTS.md, .planning/ROADMAP.md, .planning/STATE.md] tech_stack: added: [] patterns: [human sign-off checkpoint, attestation gap acknowledgement] key_files: created: - .planning/phases/10-real-world-runtime-validation/10-03-report-signoff-SUMMARY.md modified: - .planning/phases/10-real-world-runtime-validation/RUNTIME-VALIDATION.md - .planning/ROADMAP.md - .planning/REQUIREMENTS.md decisions: - Phase 10 closed with RTVAL-02/03/04 as attestation-only PASSes (only RTVAL-01 artifact-backed); reviewer explicitly acknowledged the audit-trail gap at sign-off rather than blocking closure for a re-run. metrics: completed_date: 2026-04-13 --- # Phase 10 Plan 03: Report Sign-off Summary Finalized RUNTIME-VALIDATION.md, obtained human sign-off with explicit attestation-gap acknowledgement, and flipped Phase 10 tracking docs to complete. ## What Was Done ### Task 1 — Finalize RUNTIME-VALIDATION.md report body Completed in the 10-02 → 10-03 handoff window: all RTVAL-01..04 sections carry concrete PASS/FAIL verdicts, evidence links, and notes; top-level Status was flipped to READY FOR SIGN-OFF by the prior agent. ### Task 2 — Human review and sign-off (checkpoint) Reviewer Sébastien QUEROL read the report, acknowledged the attestation-only audit-trail gap for RTVAL-02/03/04, and signed off on 2026-04-13: - Top-level **Status:** flipped to `SIGNED OFF` - **Signed off by:** Sébastien QUEROL - **Signed off date:** 2026-04-13 - All three sign-off checkboxes ticked `[x]` - Reviewer explicitly accepted that only RTVAL-01 is artifact-backed; RTVAL-02/03/04 rest on technician verbal attestation. Compensating controls listed in the report (known device, known tenant, single session, known-good generator) stand in for missing log/screenshot evidence. Commit: `5685fd9` — `docs(phase-10): human sign-off on RUNTIME-VALIDATION.md (attestation gap acknowledged)` ### Task 3 — Tick requirements, mark Phase 10 complete - `.planning/REQUIREMENTS.md` already had RTVAL-01..05 ticked `[x]` and the Traceability table showing `Complete` for each (landed in the 10-02 completion commit `206648c`). Idempotent confirmation only — no edits needed. - `.planning/ROADMAP.md`: - Phase 10 entry flipped from `[ ]` to `[x]` with `(completed 2026-04-13)` appended. - Progress table row for Phase 10 set to `v1.1 | 3/3 | Complete | 2026-04-13`. ## Verification - `grep "^\*\*Status:\*\* SIGNED OFF" RUNTIME-VALIDATION.md` → hit - `grep "Signed off by:\*\* Sébastien QUEROL" RUNTIME-VALIDATION.md` → hit - Zero `Status: PENDING` lines in the report - `grep "\[x\] \*\*RTVAL-05\*\*" REQUIREMENTS.md` → hit - `grep "\[x\] \*\*Phase 10" ROADMAP.md` → hit - ROADMAP.md Progress row for Phase 10 shows `3/3 | Complete | 2026-04-13` All verification checks from the plan pass. ## Deviations from Plan None. Task 3 REQUIREMENTS.md edits were already present from plan 10-02's completion commit, making that step a no-op confirmation rather than a mutation. No deviation rules (1-4) triggered. ## Phase 10 Closure Note — Attestation-Only Audit Trail Phase 10 closes with a structurally weakened runtime audit trail that downstream consumers must be aware of: - **RTVAL-01** (tenant ingestion): PASS, artifact-backed (screenshots + exact .intunewin package committed under `evidence/`), re-tested on the fixed build after ISSUE-01 was resolved (commits `74535ea` + `7716246`). - **RTVAL-02** (install under SYSTEM): PASS, **attestation-only** — no `IntuneManagementExtension.log` excerpt, no portal screenshot. - **RTVAL-03** (detection rule): PASS, **attestation-only, 2nd consecutive** — no portal screenshot, no manual detect transcript. - **RTVAL-04** (uninstall under SYSTEM): PASS, **attestation-only, 3rd consecutive** — no uninstall log, no portal screenshot. RTVAL-02/03/04 together form an attestation-only runtime half for the phase. The user was warned twice during plan 10-02 (on RTVAL-03 and again on RTVAL-04) that consecutive attestation-only checks damage the audit trail, and chose to proceed both times. At sign-off the user again explicitly acknowledged the gap and accepted Phase 10 closure on that basis. **Implication for future work:** If a regression, incident, or customer escalation touches SYSTEM-context install, detection, or uninstall, RTVAL-02/03/04 must be treated as soft PASSes — the "it worked once" claim for this build cannot be independently re-derived from evidence files and must be re-validated with full artifact capture. Phase 11 rollout proceeds at the reviewer's risk. ## Self-Check: PASSED - FOUND: `.planning/phases/10-real-world-runtime-validation/RUNTIME-VALIDATION.md` (SIGNED OFF) - FOUND: `.planning/phases/10-real-world-runtime-validation/10-03-report-signoff-SUMMARY.md` - FOUND: REQUIREMENTS.md RTVAL-01..05 ticked + Traceability Complete - FOUND: ROADMAP.md Phase 10 ticked with 3/3 Complete 2026-04-13 - FOUND commit: `5685fd9` (Task 2 sign-off)