- Flip v1.0-VALIDATION-INDEX.md frontmatter draft -> signed-off (Sébastien QUEROL, 2026-04-13)
- Tick index sign-off line (45/45 pass, 0 fail-fix-v1.1)
- Replicate dated sign-off line into all 7 per-phase VALIDATION.md Validation Sign-Off blocks
- Tick nyquist_compliant checkbox in phases 01/02/03/04/05/07 (06 already ticked)
- Upgrade Approval lines phases 01-05 from 'pending' to signed-off with index back-link
- Tick REQUIREMENTS.md NYQ-02/NYQ-03 and flip Traceability Pending -> Complete
- Phase 4 attestation-only runtime gap recorded in index Residual Risk block (not reopened per plan 10-03 sign-off)
- Create 05-02-SUMMARY.md with full execution details
- Update STATE.md progress to 100%, add 4 key decisions, record metrics
- Update ROADMAP.md phase 5 status to Complete
- Mark requirements PKG-04 and PKG-05 complete
- Update printer_detail() to pass install_cmd, uninstall_cmd, has_driver, has_icon to template
- Rewrite printer_detail.html with Intune Commands, Export, and Icon sections
- Show command strings with Alpine.js copy-to-clipboard buttons (install-cmd, uninstall-cmd)
- Show NinjaRMM ZIP and .intunewin download links when driver assigned
- Add HTMX icon upload form with #icon-status swap target
- Remove disabled placeholder Regenerate Package button
- Add TestCommandPreview class (4 tests) to test_packages.py
- All 94 tests pass