kawa
3b12b0d506
docs(12-02): complete full i18n template coverage plan — checkpoint reached
...
- 12-02-SUMMARY.md: 60+ translation keys, 13 templates fully wired, 2 test fixes
- STATE.md: session updated, span-wrapper pattern decision recorded
- ROADMAP.md: phase 12 plan progress updated
2026-04-15 15:51:48 +02:00
kawa
4e23acb586
docs(12-01): complete browser language auto-detection and port autofill test fix
...
- SUMMARY.md created with TDD execution details and test results
- STATE.md updated with decisions and session info
- ROADMAP.md updated: Phase 12 now shows 1/2 summaries (In Progress)
2026-04-15 15:45:09 +02:00
kawa and Claude Sonnet 4.6
ef8fbc9692
docs(12-i18n-bugfixes): create phase plan
...
2 plans: browser lang auto-detection + fix test_port_autofill (wave 1),
full template i18n coverage across 13 templates (wave 2).
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-04-15 15:18:53 +02:00
kawa and Claude Sonnet 4.6
b0078a4fb2
docs(phase-11): complete phase execution
...
All 4 plans complete. UIE-01..05 verified (15/15 must-haves). Human-approved.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-04-15 15:08:53 +02:00
kawa
1bec899f87
docs(11-04): complete client name navigation plan
...
- Add 11-04-SUMMARY.md with task results, decision log, self-check passed
- Add deferred-items.md logging pre-existing port_autofill E2E failure
- STATE.md: advance plan, record decisions, update session
- ROADMAP.md: Phase 11 marked 4/4 Complete
2026-04-15 14:54:16 +02:00
kawa
c00ac80e6c
docs(11-01): complete UIE-02 plan — Add Printer page separation
...
- Create 11-01-SUMMARY.md with full execution record
- Update STATE.md: advance plan to 3, add decisions, update session
- Update ROADMAP.md: phase 11 progress to 1/4 summaries (In Progress)
2026-04-15 11:05:23 +02:00
kawa and Claude Sonnet 4.6
0badba20d1
docs(11): create phase plan
...
Plan 4 plans across 3 waves covering UIE-01..05: form separation
(Plan 01), printer edit modal (Plan 02), theme+i18n toggles (Plan 03),
and client detail page (Plan 04). Wave 0 test scaffolds included in Plan 01.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-04-15 10:47:19 +02:00
kawa and Claude Sonnet 4.6
036b048705
docs(phase-09): complete phase execution and human sign-off
...
All 3 UX defects fixed, 11/11 must-haves verified, human-approved.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-04-15 09:52:43 +02:00
kawa and Claude Sonnet 4.6
70454c8e14
docs(09-02): complete playwright-port-autofill plan
...
- STATE.md: advance to plan 2, record UX-02 closure decisions
- ROADMAP.md: Phase 9 now 3/3 summaries (Complete)
- Task commits already in history: 4e9bd9b (scaffolding) + 322fc20 (test)
- 1 Playwright test green: test_port_autofill[chromium] PASSED in 5.49s
- 113 unit tests unaffected
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-04-13 17:46:38 +02:00
kawa and Claude Sonnet 4.6
fb7555e6b5
docs(09-01): complete driver-upload-fix-and-inline-oob plan
...
- STATE.md: advance to Phase 09-01 active, completed_plans=15
- ROADMAP.md: Phase 8 marked Complete 8/8, Phase 9 progress row fixed
- All 3 tasks complete: 500 regression fixed, OOB template created, printer form wired
- 113 tests passing (pytest tests/ -x -q --ignore=tests/e2e)
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-04-13 17:42:47 +02:00
kawa
dc70acf5f2
docs(08-07): complete Phase 7 Nyquist audit plan
...
- 4/4 pass (3 in-scope + 1 UX-03 carry-over to Phase 9)
- per-phase NYQ-01 coverage complete (7/7 v1.0 phases, 45 rows, 0 roll-forward)
- STATE advanced to plan 8 (final 08-08 rollup remaining)
2026-04-13 16:20:34 +02:00
kawa
7b37bdbb4a
docs(phase-08): create Nyquist validation track phase plan (8 plans, sequential)
2026-04-13 15:45:52 +02:00
kawa and Claude Opus 4.6
442b7d680a
docs(phase-11): close rollout phase on operator attestation
...
Technician confirmed real-world rollout: ImpTune ran in its local Docker
container, generated printer packages were delivered end-to-end via BOTH
Intune and NinjaRMM to real endpoints, and all tested installs succeeded
with no blocking items to triage.
Closes RWR-01..04. Attestation-only (mirrors Phase 10 accepted gap) -
no artifact evidence captured.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-13 14:50:05 +02:00
kawa
43081c6828
docs(phase-11): create rollout phase plan (deploy, push, feedback triage)
2026-04-13 14:42:20 +02:00
kawa
cd2df1e163
docs(10-03): complete report-signoff plan and close Phase 10
...
- Mark Phase 10 complete in ROADMAP.md (3/3 plans, 2026-04-13)
- Create 10-03-report-signoff-SUMMARY.md with attestation-gap closure note
- Update STATE.md: plan 10-03 complete, Phase 10 closed, next is phase 8 or 11
- REQUIREMENTS.md RTVAL-01..05 ticks already landed in 10-02 completion commit (idempotent)
2026-04-13 14:32:24 +02:00
kawa
206648c360
docs(10-02): complete live-intune-runtime-validation plan
...
- SUMMARY.md documents all 4 RTVAL runtime checks recorded on rubis.fr / ARES-5CG5220YTM
- RTVAL-01 artifact-backed PASS (after fixing HMAC scope + Detection.xml defects)
- RTVAL-02/03/04 attestation-only PASSes — three consecutive; user warned twice, approved
- SUMMARY.md flags attestation-only audit-trail damage prominently for wave-3 + phase verifiers
- STATE.md advanced; next plan is 10-03 (sign-off and phase closure)
- ROADMAP.md plan progress updated for phase 10
- REQUIREMENTS.md: RTVAL-01..04 marked complete
2026-04-13 14:25:19 +02:00
kawa
93a4e30bd4
docs(10-01): complete preflight-package-and-scaffold plan
...
- Add 10-01-preflight-package-and-scaffold-SUMMARY.md
- Update STATE.md: position moved to Phase 10 plan 01 complete
- Update ROADMAP.md: Phase 10 shows 1/3 summaries (In Progress)
- Mark RTVAL-05 complete in REQUIREMENTS.md
2026-04-13 11:33:23 +02:00
kawa
de24e1d18e
docs(phase-10): finalize Phase 10 plan list in ROADMAP
2026-04-13 11:20:35 +02:00
kawa
37a06dac89
docs(09-02): complete playwright-port-autofill plan
...
- Create 09-02-SUMMARY.md with Playwright e2e evidence for UX-02
- Update STATE.md: decisions, session continuity, progress bar
- Update ROADMAP.md: phase 9 marked complete (3/3 plans with summaries)
- Update REQUIREMENTS.md: UX-02 marked complete
2026-04-13 10:58:51 +02:00
kawa
9902e2a5b8
docs(09-01): complete driver-upload-fix-and-inline-oob plan
...
- Create 09-01-SUMMARY.md: documents OOB swap fix, file changes, TDD outcomes
- Update STATE.md: advance session, add decisions, update progress (94%)
- Update ROADMAP.md: phase 9 in progress (2/3 summaries)
- Update REQUIREMENTS.md: mark UX-01 complete
2026-04-13 10:53:13 +02:00
kawa
c6fe284e28
docs(09-03): complete script-download-links plan
...
- Add 09-03-SUMMARY.md documenting .ps1 routes + detail-page links
- Update STATE.md with decisions and session info
- Update ROADMAP.md phase 9 progress (1/3 summaries)
- Mark UX-03 complete in REQUIREMENTS.md
2026-04-13 10:49:47 +02:00
kawa
71c808601c
docs(09): create phase plan for UX tech debt closure
...
Three plans covering UX-01 (driver upload 500 fix + inline HTMX OOB
refresh on printer form), UX-02 (Playwright headless test for PRNT-03
IP->port auto-fill), and UX-03 (.ps1 script download routes + detail
page links). VALIDATION.md finalized with real task IDs and
nyquist_compliant=true. ROADMAP Phase 9 plan list filled in.
2026-04-13 10:29:43 +02:00
kawa
d2f66d4b43
docs: create milestone v1.1 roadmap (4 phases)
2026-04-13 09:58:23 +02:00
kawa and Claude Opus 4.6
67a1cd66ec
chore: complete v1.0 milestone
...
Archive v1.0 MVP: 7 phases, 13 plans, 27/27 requirements.
- Archive roadmap to milestones/v1.0-ROADMAP.md
- Archive requirements to milestones/v1.0-REQUIREMENTS.md
- Move milestone audit into milestones/
- Create MILESTONES.md with v1.0 entry
- Evolve PROJECT.md: move shipped requirements to Validated,
update Context with stack/LOC, log Key Decisions with outcomes
- Collapse ROADMAP.md to one-line milestone summary
- Update STATE.md to shipped status
- Back-fill stale requirements-completed frontmatter on
02-01, 04-01, 05-01, 06-01 SUMMARY.md files
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-13 09:47:37 +02:00
kawa
14293a8443
docs(07-01): complete dashboard and navigation polish plan
...
- SUMMARY.md documents /packages route, dashboard live queries, 99 tests green
- STATE.md advanced to 7/7 phases complete (100%)
- ROADMAP.md marks Phase 7 and plan 07-01 complete
2026-04-13 09:00:01 +02:00
kawa
906f3ca101
docs(06-01): complete wire-icon-intunewin plan
...
- SUMMARY.md: icon lookup + copy into .intunewin staging
- STATE.md: advanced to 06-01 complete, 100% progress, PKG-04 decision recorded
- ROADMAP.md: phase 06 marked Complete (1/1 plans)
- REQUIREMENTS.md: PKG-04 marked complete
2026-04-10 16:22:22 +02:00
kawa and Claude Opus 4.6
a6d8e15210
docs(roadmap): add gap closure phases 6-7
...
Phase 6 wires icon into .intunewin export (closes PKG-04).
Phase 7 fixes dashboard empty state and /packages 404 nav link.
PKG-04 reset to Pending in REQUIREMENTS.md traceability table.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-10 15:32:52 +02:00
kawa
fba03b5241
docs(05-02): complete icon upload and export UI plan
...
- Create 05-02-SUMMARY.md with full execution details
- Update STATE.md progress to 100%, add 4 key decisions, record metrics
- Update ROADMAP.md phase 5 status to Complete
- Mark requirements PKG-04 and PKG-05 complete
2026-04-10 15:08:02 +02:00
kawa
f96ea6fec9
feat(05-02): printer detail page with export buttons and command preview
...
- Update printer_detail() to pass install_cmd, uninstall_cmd, has_driver, has_icon to template
- Rewrite printer_detail.html with Intune Commands, Export, and Icon sections
- Show command strings with Alpine.js copy-to-clipboard buttons (install-cmd, uninstall-cmd)
- Show NinjaRMM ZIP and .intunewin download links when driver assigned
- Add HTMX icon upload form with #icon-status swap target
- Remove disabled placeholder Regenerate Package button
- Add TestCommandPreview class (4 tests) to test_packages.py
- All 94 tests pass
2026-04-10 15:06:45 +02:00
kawa and Claude Opus 4.6
f2d12e53d9
docs(05): create phase 5 package export plans
...
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-10 13:53:31 +02:00
kawa
ed0f0a0607
docs(04-02): complete uninstall+detect templates and script API endpoints plan
...
- 04-02-SUMMARY.md: TDD execution, 3 commits, 6 files, 75 tests green
- STATE.md: advanced to 04-02 complete, added 3 new decisions
- ROADMAP.md: phase 4 marked complete (2/2 plans done)
- REQUIREMENTS.md: SCRPT-02 and SCRPT-03 marked complete
2026-04-10 13:37:53 +02:00
kawa
8cb420107f
docs(04-01): complete script generator install plan summary
...
- SUMMARY.md for phase 04 plan 01 (TDD install script generator)
- STATE.md: progress updated to 89%, decisions recorded, session updated
- ROADMAP.md: phase 4 plan progress updated (1/2 summaries)
- REQUIREMENTS.md: SCRPT-01, SCRPT-04, SCRPT-05 marked complete
2026-04-10 13:33:08 +02:00
kawa and Claude Opus 4.6
c7361bef18
docs(04): create phase plan for script generation
...
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-10 13:27:14 +02:00
kawa
7c0ae66d39
docs(03-02): complete printer detail page plan summary
...
- 03-02-SUMMARY.md: printer detail page with driver info and regenerate placeholder
- STATE.md: advance position, record metrics and decisions
- ROADMAP.md: phase 03 marked complete (2/2 plans done)
- REQUIREMENTS.md: PRNT-10 marked complete
2026-04-10 13:05:55 +02:00
kawa and Claude Opus 4.6
e27d0285ac
docs(03): create phase plan for printer configuration
...
Two plans covering PRNT-01 through PRNT-10: printer+client CRUD with
Alpine.js port derivation (plan 01), and printer detail page with
regeneration placeholder (plan 02).
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-10 12:35:52 +02:00
kawa
17db5ce1a8
docs(02-01): complete INF parser plan
...
- 02-01-SUMMARY.md: TDD execution summary with deviation notes
- STATE.md: updated position, decisions, metrics, session
- ROADMAP.md: phase 2 progress updated (1/2 summaries)
- REQUIREMENTS.md: DRV-02 and DRV-05 marked complete
2026-04-10 11:57:54 +02:00
kawa and Claude Opus 4.6
9f5ee24811
docs(02-driver-management): create phase plan
...
Two plans: INF parser TDD (wave 1), upload endpoint + UI (wave 2).
Covers DRV-01 through DRV-05.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-10 11:48:02 +02:00
kawa
4d57528963
docs(01-02): complete database schema and driver storage plan
...
- 01-02-SUMMARY.md: TDD execution results, decisions, self-check passed
- STATE.md: progress updated (100% phase 1), 3 decisions recorded
- ROADMAP.md: phase 1 marked Complete (3/3 summaries)
2026-04-10 11:33:20 +02:00
kawa
f614a3e480
docs(01-01): complete Docker scaffold and app shell plan
...
- 01-01-SUMMARY.md: FastAPI app shell, offline static assets, sidebar, 3-test suite
- STATE.md: advance plan to 01-01 complete, add TemplateResponse and lifespan decisions
- ROADMAP.md: mark 01-01 complete, update progress table (2/3 plans in Phase 1)
- REQUIREMENTS.md: mark INFRA-01 complete
2026-04-10 11:28:49 +02:00
kawa
139503944b
docs(01-03): complete .intunewin builder plan
...
- Add 01-03-SUMMARY.md with byte-level format validation results
- Update STATE.md: progress 33%, decisions recorded, session updated
- Update ROADMAP.md: phase 1 in progress (1/3 summaries)
- Mark INFRA-02 complete in REQUIREMENTS.md
2026-04-10 11:26:44 +02:00
kawa and Claude Opus 4.6
a8a27a44d3
docs(01): create phase 1 foundation plans
...
Three plans covering Docker scaffold, SQLite schema, and .intunewin spike.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-10 11:19:05 +02:00
kawa
92c22dce8a
docs: create roadmap (5 phases)
2026-04-10 10:45:42 +02:00