Commit Graph
8 Commits
Author SHA1 Message Date
kawa 732582021a docs(08-08): human sign-off on v1.0-VALIDATION-INDEX.md (NYQ-02/03 complete)
- Flip v1.0-VALIDATION-INDEX.md frontmatter draft -> signed-off (Sébastien QUEROL, 2026-04-13)
- Tick index sign-off line (45/45 pass, 0 fail-fix-v1.1)
- Replicate dated sign-off line into all 7 per-phase VALIDATION.md Validation Sign-Off blocks
- Tick nyquist_compliant checkbox in phases 01/02/03/04/05/07 (06 already ticked)
- Upgrade Approval lines phases 01-05 from 'pending' to signed-off with index back-link
- Tick REQUIREMENTS.md NYQ-02/NYQ-03 and flip Traceability Pending -> Complete
- Phase 4 attestation-only runtime gap recorded in index Residual Risk block (not reopened per plan 10-03 sign-off)
2026-04-13 16:36:08 +02:00
kawa bb62174917 docs(08-06): Phase 6 Nyquist audit - PKG-04 icon embedding 1/1 pass
- Add ## Nyquist Record (1 row) to 06-VALIDATION.md
- PKG-04 row cites TestIntunewinIconInclusion (2 tests) + commits 2723cc8/6310be5
- Supporting transitive evidence: Phase 10 RTVAL-01 artifact-backed PASS (same build_intunewin path)
- Manual-Only residue: icon-tile visual check deferred to Phase 11 rollout polish
- Frontmatter nyquist_compliant true, nyquist_audited 2026-04-13, nyquist_auditor set
- Sign-Off checkboxes ticked
2026-04-13 16:14:09 +02:00
kawaandClaude Opus 4.6 67a1cd66ec chore: complete v1.0 milestone
Archive v1.0 MVP: 7 phases, 13 plans, 27/27 requirements.

- Archive roadmap to milestones/v1.0-ROADMAP.md
- Archive requirements to milestones/v1.0-REQUIREMENTS.md
- Move milestone audit into milestones/
- Create MILESTONES.md with v1.0 entry
- Evolve PROJECT.md: move shipped requirements to Validated,
  update Context with stack/LOC, log Key Decisions with outcomes
- Collapse ROADMAP.md to one-line milestone summary
- Update STATE.md to shipped status
- Back-fill stale requirements-completed frontmatter on
  02-01, 04-01, 05-01, 06-01 SUMMARY.md files

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-13 09:47:37 +02:00
kawaandClaude Opus 4.6 9ba8743144 docs(phase-06): complete phase execution and verification
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-10 16:24:21 +02:00
kawa 906f3ca101 docs(06-01): complete wire-icon-intunewin plan
- SUMMARY.md: icon lookup + copy into .intunewin staging
- STATE.md: advanced to 06-01 complete, 100% progress, PKG-04 decision recorded
- ROADMAP.md: phase 06 marked Complete (1/1 plans)
- REQUIREMENTS.md: PKG-04 marked complete
2026-04-10 16:22:22 +02:00
kawaandClaude Opus 4.6 9f3d35b72f docs(06): create phase plan for wiring icon into intunewin export
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-10 15:41:05 +02:00
kawa 9912378563 docs(06): add research and validation strategy 2026-04-10 15:39:22 +02:00
kawaandClaude Sonnet 4.6 ba106eecbe docs(06): research phase — wire icon into .intunewin export
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 15:38:22 +02:00