Commit Graph
7 Commits
Author SHA1 Message Date
kawa 3f03b35bf2 docs(08-03): add Phase 3 Nyquist Record to 03-VALIDATION.md
- 10 rows (one per PRNT-01..10 success criterion), all pass
- Row 3 (PRNT-03 Alpine.js IP->port) closed as pass citing Phase 9 UX-02
  Playwright fixing commits 322fc20 (test) + 37a06da (docs)
- Frontmatter: nyquist_compliant true, nyquist_audited 2026-04-13,
  nyquist_auditor Claude (gsd-executor, plan 08-03)
- Preserves Test Infrastructure, Sampling Rate, Per-Task Verification Map,
  Wave 0, Manual-Only Verifications, Validation Sign-Off verbatim
2026-04-13 16:02:13 +02:00
kawaandClaude Opus 4.6 f80f790360 docs(phase-03): complete phase execution and verification
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-10 13:14:54 +02:00
kawa 7c0ae66d39 docs(03-02): complete printer detail page plan summary
- 03-02-SUMMARY.md: printer detail page with driver info and regenerate placeholder
- STATE.md: advance position, record metrics and decisions
- ROADMAP.md: phase 03 marked complete (2/2 plans done)
- REQUIREMENTS.md: PRNT-10 marked complete
2026-04-10 13:05:55 +02:00
kawa 3b644272e7 docs(03-01): complete printer and client CRUD plan summary
- 03-01-SUMMARY.md: documents printer/client CRUD, Alpine.js port derivation,
  HTMX partials, test isolation fix, and PRNT-01 through PRNT-09 requirements
- STATE.md: updated position, decisions, metrics, session record
- ROADMAP.md: phase 03 progress updated (1/2 plans complete)
- REQUIREMENTS.md: PRNT-01 through PRNT-09 marked complete
2026-04-10 12:57:43 +02:00
kawaandClaude Opus 4.6 e27d0285ac docs(03): create phase plan for printer configuration
Two plans covering PRNT-01 through PRNT-10: printer+client CRUD with
Alpine.js port derivation (plan 01), and printer detail page with
regeneration placeholder (plan 02).

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-10 12:35:52 +02:00
kawa 17573fbf6d docs(03): add research and validation strategy 2026-04-10 12:29:02 +02:00
kawaandClaude Sonnet 4.6 4c53ecd5db docs(phase-03): research printer configuration phase
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-10 12:28:03 +02:00