kawa 732582021a docs(08-08): human sign-off on v1.0-VALIDATION-INDEX.md (NYQ-02/03 complete)
- Flip v1.0-VALIDATION-INDEX.md frontmatter draft -> signed-off (Sébastien QUEROL, 2026-04-13)
- Tick index sign-off line (45/45 pass, 0 fail-fix-v1.1)
- Replicate dated sign-off line into all 7 per-phase VALIDATION.md Validation Sign-Off blocks
- Tick nyquist_compliant checkbox in phases 01/02/03/04/05/07 (06 already ticked)
- Upgrade Approval lines phases 01-05 from 'pending' to signed-off with index back-link
- Tick REQUIREMENTS.md NYQ-02/NYQ-03 and flip Traceability Pending -> Complete
- Phase 4 attestation-only runtime gap recorded in index Residual Risk block (not reopened per plan 10-03 sign-off)
2026-04-13 16:36:08 +02:00
kawa dff5a9c4a5 docs(08-02): add Phase 2 Nyquist Record (6 rows, all pass)
- Append Nyquist Record table to 02-VALIDATION.md (DRV-01..05 + upload-500 historical gap)
- Flip frontmatter nyquist_compliant=true; add nyquist_audited + nyquist_auditor
- Row 6 records the Phase 8 kickoff POST /drivers/upload 500 as pass via Phase 9 / UX-01 fixing commits (d1de839, 10ee09a, 72c6a98)
- Follows the 08-01 precedent (Phase 1 row 14 closed via Phase 10 RTVAL-01)
2026-04-13 15:58:52 +02:00
kawaandClaude Opus 4.6 67a1cd66ec chore: complete v1.0 milestone
Archive v1.0 MVP: 7 phases, 13 plans, 27/27 requirements.

- Archive roadmap to milestones/v1.0-ROADMAP.md
- Archive requirements to milestones/v1.0-REQUIREMENTS.md
- Move milestone audit into milestones/
- Create MILESTONES.md with v1.0 entry
- Evolve PROJECT.md: move shipped requirements to Validated,
  update Context with stack/LOC, log Key Decisions with outcomes
- Collapse ROADMAP.md to one-line milestone summary
- Update STATE.md to shipped status
- Back-fill stale requirements-completed frontmatter on
  02-01, 04-01, 05-01, 06-01 SUMMARY.md files

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-13 09:47:37 +02:00
kawaandClaude Opus 4.6 ded9d7a8c5 docs(phase-02): complete phase execution and verification
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-10 12:06:40 +02:00
kawa 0f669a90e1 docs(02-02): complete driver upload endpoint plan
- SUMMARY.md with deviations, decisions, metrics
- STATE.md: decisions logged, progress updated, session recorded
- ROADMAP.md: phase 02 marked complete (2/2 plans with summaries)
- REQUIREMENTS.md: DRV-01, DRV-03, DRV-04 marked complete
2026-04-10 12:03:43 +02:00
kawa 17db5ce1a8 docs(02-01): complete INF parser plan
- 02-01-SUMMARY.md: TDD execution summary with deviation notes
- STATE.md: updated position, decisions, metrics, session
- ROADMAP.md: phase 2 progress updated (1/2 summaries)
- REQUIREMENTS.md: DRV-02 and DRV-05 marked complete
2026-04-10 11:57:54 +02:00
kawaandClaude Opus 4.6 9f5ee24811 docs(02-driver-management): create phase plan
Two plans: INF parser TDD (wave 1), upload endpoint + UI (wave 2).
Covers DRV-01 through DRV-05.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-10 11:48:02 +02:00
kawa 7930619404 docs(phase-02): add research and validation strategy 2026-04-10 11:43:51 +02:00
kawaandClaude Sonnet 4.6 13e098e244 docs(phase-02): research driver management phase
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>