docs: create milestone v1.1 roadmap (4 phases)
This commit is contained in:
+18
-18
@@ -52,27 +52,27 @@ Carried forward from v1.0 Out of Scope — no change.
|
||||
|
||||
| Requirement | Phase | Status |
|
||||
|-------------|-------|--------|
|
||||
| RTVAL-01 | TBD | Pending |
|
||||
| RTVAL-02 | TBD | Pending |
|
||||
| RTVAL-03 | TBD | Pending |
|
||||
| RTVAL-04 | TBD | Pending |
|
||||
| RTVAL-05 | TBD | Pending |
|
||||
| UX-01 | TBD | Pending |
|
||||
| UX-02 | TBD | Pending |
|
||||
| UX-03 | TBD | Pending |
|
||||
| NYQ-01 | TBD | Pending |
|
||||
| NYQ-02 | TBD | Pending |
|
||||
| NYQ-03 | TBD | Pending |
|
||||
| RWR-01 | TBD | Pending |
|
||||
| RWR-02 | TBD | Pending |
|
||||
| RWR-03 | TBD | Pending |
|
||||
| RWR-04 | TBD | Pending |
|
||||
| RTVAL-01 | Phase 10 | Pending |
|
||||
| RTVAL-02 | Phase 10 | Pending |
|
||||
| RTVAL-03 | Phase 10 | Pending |
|
||||
| RTVAL-04 | Phase 10 | Pending |
|
||||
| RTVAL-05 | Phase 10 | Pending |
|
||||
| UX-01 | Phase 9 | Pending |
|
||||
| UX-02 | Phase 9 | Pending |
|
||||
| UX-03 | Phase 9 | Pending |
|
||||
| NYQ-01 | Phase 8 | Pending |
|
||||
| NYQ-02 | Phase 8 | Pending |
|
||||
| NYQ-03 | Phase 8 | Pending |
|
||||
| RWR-01 | Phase 11 | Pending |
|
||||
| RWR-02 | Phase 11 | Pending |
|
||||
| RWR-03 | Phase 11 | Pending |
|
||||
| RWR-04 | Phase 11 | Pending |
|
||||
|
||||
**Coverage:**
|
||||
- v1.1 requirements: 15 total
|
||||
- Mapped to phases: 0 (roadmap pending)
|
||||
- Unmapped: 15 ⚠️
|
||||
- Mapped to phases: 15 ✓
|
||||
- Unmapped: 0
|
||||
|
||||
---
|
||||
*Requirements defined: 2026-04-13*
|
||||
*Last updated: 2026-04-13 after initial definition*
|
||||
*Last updated: 2026-04-13 after v1.1 roadmap creation (Phases 8–11)*
|
||||
|
||||
+55
-7
@@ -3,7 +3,7 @@
|
||||
## Milestones
|
||||
|
||||
- ✅ **v1.0 MVP** — Phases 1–7, 13 plans, 27/27 requirements (shipped 2026-04-13) — see [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
|
||||
- 📋 **v1.1** — not yet planned (`/gsd:new-milestone`)
|
||||
- 🚧 **v1.1 Hardening & Validation** — Phases 8–11, 15 requirements (in progress, started 2026-04-13)
|
||||
|
||||
## Phases
|
||||
|
||||
@@ -22,13 +22,57 @@ Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
|
||||
|
||||
</details>
|
||||
|
||||
### 📋 v1.1 (not yet planned)
|
||||
### 🚧 v1.1 Hardening & Validation (Phases 8–11)
|
||||
|
||||
Run `/gsd:new-milestone` to scope v1.1. Likely candidates from v1.0 carryover:
|
||||
- Real-world Intune tenant runtime validation
|
||||
- Driver dropdown refresh after upload
|
||||
- UI links to individual script downloads
|
||||
- Nyquist-compliant VALIDATION.md across phases
|
||||
- [ ] **Phase 8: Nyquist Validation Track** — Retro-fit Nyquist-compliant VALIDATION.md across all 7 v1.0 phases with evidence-backed checks
|
||||
- [ ] **Phase 9: UX Tech Debt Closure** — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use
|
||||
- [ ] **Phase 10: Real-World Runtime Validation** — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint
|
||||
- [ ] **Phase 11: Real-World Rollout & Feedback** — Deploy the container to a real MSP environment, push a real package, and capture structured technician feedback
|
||||
|
||||
## Phase Details
|
||||
|
||||
### Phase 8: Nyquist Validation Track
|
||||
**Goal**: Every v1.0 phase has a signed-off Nyquist-compliant validation record with cited evidence, and any blocking gaps are tracked.
|
||||
**Depends on**: Nothing (parallelizable — pure audit of shipped code, no runtime dependency)
|
||||
**Requirements**: NYQ-01, NYQ-02, NYQ-03
|
||||
**Success Criteria** (what must be TRUE):
|
||||
1. An operator can open any of the 7 v1.0 phase folders and read a `VALIDATION.md` where every success criterion maps to exactly one observable check with cited evidence (commit, test name, file path, or screenshot)
|
||||
2. An operator can open `.planning/milestones/v1.0-VALIDATION-INDEX.md` and see a single pass/fail roll-up across all 7 phases with links to each phase's validation file
|
||||
3. Any validation gap surfaced during the Nyquist pass appears in the index as either a v1.1 defect ticket (linked to the fixing phase) or an explicitly deferred item with written rationale
|
||||
**Plans**: TBD
|
||||
|
||||
### Phase 9: UX Tech Debt Closure
|
||||
**Goal**: The three carried-over UX defects are fixed and live-verified in a real browser so the rolled-out build is the polished one.
|
||||
**Depends on**: Nothing (independent of validation and rollout — but must complete before Phase 11)
|
||||
**Requirements**: UX-01, UX-02, UX-03
|
||||
**Success Criteria** (what must be TRUE):
|
||||
1. A technician uploading a new driver on the printer form sees the new DriverDesc appear in the dropdown without manually reloading the page
|
||||
2. A technician typing an IP address into the printer form sees the port field auto-populate via the PRNT-03 Alpine.js handler, observed live in a real browser and recorded in VALIDATION.md
|
||||
3. A technician on the printer detail page can click direct download links for the install, uninstall, and detect scripts individually, in addition to the existing package export buttons
|
||||
**Plans**: TBD
|
||||
|
||||
### Phase 10: Real-World Runtime Validation
|
||||
**Goal**: Generated .intunewin, install, detect, and uninstall artifacts are proven to work end-to-end on a real Intune tenant against a real Windows endpoint, with evidence recorded.
|
||||
**Depends on**: Phase 9 (rollout uses the validated-AND-polished build; validation itself only strictly needs v1.0, but running it on the polished build avoids re-doing the pass)
|
||||
**Requirements**: RTVAL-01, RTVAL-02, RTVAL-03, RTVAL-04, RTVAL-05
|
||||
**Success Criteria** (what must be TRUE):
|
||||
1. A generated `.intunewin` package is uploaded to a real Microsoft Intune tenant and accepted without format errors, with the tenant ingestion confirmation captured as evidence
|
||||
2. A technician assigning the package to a real Intune-managed Windows endpoint observes the install script succeed under SYSTEM context, with `pnputil` driver staging and `$PSScriptRoot` path resolution verified in the device log
|
||||
3. After install, the Intune detection rule driven by the generated detect script reports "installed" for the endpoint
|
||||
4. A technician triggering uninstall from Intune sees the printer cleanly removed from the endpoint under SYSTEM context
|
||||
5. A reviewer can open `RUNTIME-VALIDATION.md` and read a signed-off report listing tenant, device, OS build, driver vendor(s), screenshots/logs, and any issues found
|
||||
**Plans**: TBD
|
||||
|
||||
### Phase 11: Real-World Rollout & Feedback
|
||||
**Goal**: ImpTune is running in a real MSP environment, has produced a package that actually reached endpoints, and technician feedback has been captured and triaged.
|
||||
**Depends on**: Phase 9 (UX tech debt), Phase 10 (runtime validation passed)
|
||||
**Requirements**: RWR-01, RWR-02, RWR-03, RWR-04
|
||||
**Success Criteria** (what must be TRUE):
|
||||
1. ImpTune is running in its single Docker container inside at least one real MSP environment serving real printers, with the host/URL recorded in the feedback document
|
||||
2. At least one printer deployment package generated by the deployed instance has been pushed to real endpoints via Intune or NinjaRMM end-to-end
|
||||
3. A reviewer can open `.planning/feedback/v1.1-rollout.md` and read structured feedback from the deploying technician covering what worked, what blocked, and what's missing
|
||||
4. Every feedback item in that document is tagged fix-in-v1.1, defer-to-v1.2, or won't-do with written rationale
|
||||
**Plans**: TBD
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -41,3 +85,7 @@ Run `/gsd:new-milestone` to scope v1.1. Likely candidates from v1.0 carryover:
|
||||
| 5. Package Export | v1.0 | 2/2 | Complete | 2026-04-10 |
|
||||
| 6. Wire Icon into .intunewin | v1.0 | 1/1 | Complete | 2026-04-10 |
|
||||
| 7. Dashboard & Nav Polish | v1.0 | 1/1 | Complete | 2026-04-13 |
|
||||
| 8. Nyquist Validation Track | v1.1 | 0/? | Not started | — |
|
||||
| 9. UX Tech Debt Closure | v1.1 | 0/? | Not started | — |
|
||||
| 10. Real-World Runtime Validation | v1.1 | 0/? | Not started | — |
|
||||
| 11. Real-World Rollout & Feedback | v1.1 | 0/? | Not started | — |
|
||||
|
||||
+34
-19
@@ -2,15 +2,17 @@
|
||||
gsd_state_version: 1.0
|
||||
milestone: v1.1
|
||||
milestone_name: Hardening & Validation
|
||||
status: defining-requirements
|
||||
last_updated: "2026-04-13T10:00:00Z"
|
||||
last_activity: "2026-04-13 — Milestone v1.1 started"
|
||||
status: pending
|
||||
last_updated: "2026-04-13T12:00:00Z"
|
||||
last_activity: "2026-04-13 — v1.1 roadmap created (Phases 8–11)"
|
||||
progress:
|
||||
total_phases: 0
|
||||
total_phases: 4
|
||||
completed_phases: 0
|
||||
total_plans: 0
|
||||
completed_plans: 0
|
||||
percent: 0
|
||||
current_phase: 8
|
||||
current_phase_name: Nyquist Validation Track
|
||||
---
|
||||
|
||||
# Project State
|
||||
@@ -20,15 +22,15 @@ progress:
|
||||
See: .planning/PROJECT.md (updated 2026-04-13 after v1.0 milestone)
|
||||
|
||||
**Core value:** Generate a complete, working printer deployment package (script + drivers + icon) in minutes instead of manually scripting each printer setup.
|
||||
**Current focus:** v1.1 Hardening & Validation — defining requirements
|
||||
**Current focus:** v1.1 Hardening & Validation — Phase 8 (Nyquist Validation Track)
|
||||
|
||||
## Current Position
|
||||
|
||||
Milestone: v1.1 Hardening & Validation
|
||||
Phase: Not started (defining requirements)
|
||||
Phase: 8 — Nyquist Validation Track
|
||||
Plan: —
|
||||
Status: Defining requirements
|
||||
Last activity: 2026-04-13 — Milestone v1.1 started
|
||||
Status: Pending (roadmap approved, plans not yet drafted)
|
||||
Last activity: 2026-04-13 — v1.1 roadmap created, 15/15 requirements mapped across Phases 8–11
|
||||
|
||||
## Milestone History
|
||||
|
||||
@@ -36,25 +38,38 @@ Last activity: 2026-04-13 — Milestone v1.1 started
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
### Open Concerns (carry into v1.1)
|
||||
### v1.1 Phase Structure
|
||||
|
||||
- Real-world Intune tenant runtime validation for .intunewin byte-level compliance
|
||||
- `pnputil` + `$PSScriptRoot` path resolution under SYSTEM context on a real Intune-managed device
|
||||
- Printer form driver dropdown requires manual page reload after new driver upload (Phase 2 tech debt)
|
||||
- PRNT-03 Alpine.js port auto-derivation — code verified, needs live browser test
|
||||
- No UI links to individual script downloads (only via package export)
|
||||
- Nyquist-compliant VALIDATION.md missing on all 7 phases (separate validation track)
|
||||
- Phase 8: Nyquist Validation Track (NYQ-01..03) — parallelizable audit track
|
||||
- Phase 9: UX Tech Debt Closure (UX-01..03) — must land before rollout
|
||||
- Phase 10: Real-World Runtime Validation (RTVAL-01..05) — must pass before rollout
|
||||
- Phase 11: Real-World Rollout & Feedback (RWR-01..04) — depends on Phases 9 + 10
|
||||
|
||||
### Open Concerns (now owned by v1.1 phases)
|
||||
|
||||
- Real-world Intune tenant .intunewin acceptance → Phase 10 (RTVAL-01)
|
||||
- `pnputil` + `$PSScriptRoot` under SYSTEM → Phase 10 (RTVAL-02..04)
|
||||
- Driver dropdown refresh after upload → Phase 9 (UX-01)
|
||||
- PRNT-03 Alpine.js port auto-derivation live verification → Phase 9 (UX-02)
|
||||
- Individual script download links on printer detail page → Phase 9 (UX-03)
|
||||
- Nyquist-compliant VALIDATION.md across v1.0 phases → Phase 8 (NYQ-01..03)
|
||||
|
||||
### Decisions
|
||||
|
||||
- **Phase ordering:** RTVAL before RWR (cannot deploy unvalidated runtime); UX before RWR (deployed build must be polished); NYQ parallel to all (pure audit, no code dependency) — placed first so v1.0 validation evidence is fresh before runtime work begins.
|
||||
- **RTVAL grouping:** RTVAL-01..05 combined into single Phase 10 because they share setup (same tenant, same test endpoint, same RUNTIME-VALIDATION.md report).
|
||||
- **NYQ as dedicated phase:** Kept standalone (not absorbed) because it audits all 7 v1.0 phases and its evidence feeds defect triage into Phases 9/10.
|
||||
|
||||
Full decision log in PROJECT.md Key Decisions table. Milestone v1.0 decisions archived in `milestones/v1.0-ROADMAP.md`.
|
||||
|
||||
### Pending Todos
|
||||
|
||||
None.
|
||||
- Run `/gsd:plan-phase 8` to draft plans for Nyquist Validation Track
|
||||
- Schedule real Intune tenant + test endpoint access for Phase 10
|
||||
- Identify target MSP environment for Phase 11 rollout
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-04-13 — v1.0 milestone completion
|
||||
Stopped at: Milestone v1.0 shipped
|
||||
Resume file: None
|
||||
Last session: 2026-04-13 — v1.1 roadmap creation
|
||||
Stopped at: Roadmap written, requirements traceability updated, awaiting `/gsd:plan-phase 8`
|
||||
Resume file: `.planning/ROADMAP.md`
|
||||
|
||||
Reference in New Issue
Block a user