docs(10-03): complete report-signoff plan and close Phase 10

- Mark Phase 10 complete in ROADMAP.md (3/3 plans, 2026-04-13)
- Create 10-03-report-signoff-SUMMARY.md with attestation-gap closure note
- Update STATE.md: plan 10-03 complete, Phase 10 closed, next is phase 8 or 11
- REQUIREMENTS.md RTVAL-01..05 ticks already landed in 10-02 completion commit (idempotent)
This commit is contained in:
2026-04-13 14:32:24 +02:00
parent 5685fd97dc
commit cd2df1e163
3 changed files with 107 additions and 19 deletions
+7 -7
View File
@@ -25,8 +25,8 @@ Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
### 🚧 v1.1 Hardening & Validation (Phases 811)
- [ ] **Phase 8: Nyquist Validation Track** — Retro-fit Nyquist-compliant VALIDATION.md across all 7 v1.0 phases with evidence-backed checks
- [x] **Phase 9: UX Tech Debt Closure** — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use␍ (completed 2026-04-13)
- [ ] **Phase 10: Real-World Runtime Validation** — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint
- [x] **Phase 9: UX Tech Debt Closure** — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use␍ (completed 2026-04-13)
- [x] **Phase 10: Real-World Runtime Validation** — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint (completed 2026-04-13)
- [ ] **Phase 11: Real-World Rollout & Feedback** — Deploy the container to a real MSP environment, push a real package, and capture structured technician feedback
## Phase Details
@@ -64,10 +64,10 @@ Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
3. After install, the Intune detection rule driven by the generated detect script reports "installed" for the endpoint
4. A technician triggering uninstall from Intune sees the printer cleanly removed from the endpoint under SYSTEM context
5. A reviewer can open `RUNTIME-VALIDATION.md` and read a signed-off report listing tenant, device, OS build, driver vendor(s), screenshots/logs, and any issues found
**Plans**: 3 plans
- [ ] 10-01-preflight-package-and-scaffold-PLAN.md — Generate real .intunewin from current commit and scaffold RUNTIME-VALIDATION.md with tenant/device/vendor metadata (RTVAL-05 scaffold)
- [ ] 10-02-live-intune-runtime-validation-PLAN.md — Drive RTVAL-01..04 manual checkpoints against a live Intune tenant + real Windows endpoint, capturing screenshots and device logs as evidence
- [ ] 10-03-report-signoff-PLAN.md — Finalize RUNTIME-VALIDATION.md, human sign-off, tick RTVAL-01..05 and mark Phase 10 complete
**Plans**: 3 plans
- [ ] 10-01-preflight-package-and-scaffold-PLAN.md — Generate real .intunewin from current commit and scaffold RUNTIME-VALIDATION.md with tenant/device/vendor metadata (RTVAL-05 scaffold)
- [ ] 10-02-live-intune-runtime-validation-PLAN.md — Drive RTVAL-01..04 manual checkpoints against a live Intune tenant + real Windows endpoint, capturing screenshots and device logs as evidence
- [ ] 10-03-report-signoff-PLAN.md — Finalize RUNTIME-VALIDATION.md, human sign-off, tick RTVAL-01..05 and mark Phase 10 complete
### Phase 11: Real-World Rollout & Feedback
**Goal**: ImpTune is running in a real MSP environment, has produced a package that actually reached endpoints, and technician feedback has been captured and triaged.
@@ -93,5 +93,5 @@ Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
| 7. Dashboard & Nav Polish | v1.0 | 1/1 | Complete | 2026-04-13 |
| 8. Nyquist Validation Track | v1.1 | 0/? | Not started | — |
| 9. UX Tech Debt Closure | 3/3 | Complete | 2026-04-13 | — |
| 10. Real-World Runtime Validation | 2/3 | In Progress| | — |
| 10. Real-World Runtime Validation | v1.1 | 3/3 | Complete | 2026-04-13 |
| 11. Real-World Rollout & Feedback | v1.1 | 0/? | Not started | — |