docs(roadmap): add gap closure phases 6-7

Phase 6 wires icon into .intunewin export (closes PKG-04).
Phase 7 fixes dashboard empty state and /packages 404 nav link.
PKG-04 reset to Pending in REQUIREMENTS.md traceability table.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-04-10 15:32:52 +02:00
co-authored by Claude Opus 4.6
parent 624b3f0090
commit a6d8e15210
2 changed files with 34 additions and 2 deletions
+4 -2
View File
@@ -41,7 +41,7 @@ Requirements for initial release. Each maps to roadmap phases.
- [x] **PKG-01**: User can export a complete .intunewin package (script + drivers + detection + metadata)
- [x] **PKG-02**: .intunewin is generated natively in Python (no IntuneWinAppUtil.exe dependency)
- [x] **PKG-03**: User can export a NinjaRMM ZIP package (install script + driver folder)
- [x] **PKG-04**: User can upload a custom PNG icon for Intune app display (256x256, max 750KB)
- [ ] **PKG-04**: User can upload a custom PNG icon for Intune app display (256x256, max 750KB)
- [x] **PKG-05**: User can preview and copy Intune install/uninstall command strings before export
### Infrastructure
@@ -108,12 +108,14 @@ Which phases cover which requirements. Updated during roadmap creation.
| PKG-01 | Phase 5 | Complete |
| PKG-02 | Phase 5 | Complete |
| PKG-03 | Phase 5 | Complete |
| PKG-04 | Phase 5 | Complete |
| PKG-04 | Phase 6 | Pending |
| PKG-05 | Phase 5 | Complete |
**Coverage:**
- v1 requirements: 27 total
- Mapped to phases: 27
- Satisfied: 26
- Pending (gap closure): 1 (PKG-04)
- Unmapped: 0
---
+30
View File
@@ -17,6 +17,8 @@ Decimal phases appear between their surrounding integers in numeric order.
- [x] **Phase 3: Printer Configuration** - Full printer config form, client/tenant labels, SQLite persistence (completed 2026-04-10)
- [x] **Phase 4: Script Generation** - PowerShell install/uninstall/detection scripts with all correctness guards (completed 2026-04-10)
- [x] **Phase 5: Package Export** - .intunewin and NinjaRMM ZIP export, icon upload, command preview (completed 2026-04-10)
- [ ] **Phase 6: Wire Icon into .intunewin Export** - Embed uploaded icon in .intunewin package, closing PKG-04 gap
- [ ] **Phase 7: Dashboard & Navigation Polish** - Fix /packages 404 nav link, wire dashboard recent queries
## Phase Details
@@ -97,6 +99,32 @@ Plans:
- [ ] 05-01-PLAN.md — NinjaRMM ZIP + .intunewin export endpoints (packages.py router, integration tests)
- [ ] 05-02-PLAN.md — Icon upload with Pillow validation, command preview UI, export buttons on printer detail page
### Phase 6: Wire Icon into .intunewin Export
**Goal**: The uploaded PNG icon is included in the .intunewin package so Intune displays it as the app icon
**Depends on**: Phase 5
**Requirements**: PKG-04
**Gap Closure**: Closes PKG-04 (unsatisfied), icons.py→packages.py integration gap, icon→.intunewin flow gap
**Success Criteria** (what must be TRUE):
1. `packages.py` queries Icon model for the printer's icon before building .intunewin
2. Icon file is copied into the tmpdir staging area and included in the .intunewin output
3. An integration test verifies icon presence in the exported .intunewin package
Plans:
- [ ] 06-01-PLAN.md — Wire icon lookup into packages.py, copy to tmpdir, integration test
### Phase 7: Dashboard & Navigation Polish
**Goal**: Navigation links work correctly and the dashboard shows real data instead of empty placeholders
**Depends on**: Phase 3
**Requirements**: None (UX/integration fixes)
**Gap Closure**: Closes base.html→/packages 404 integration gap, pages.py dashboard hardcoded [] integration gap
**Success Criteria** (what must be TRUE):
1. Clicking the /packages nav link does not produce a 404
2. Dashboard shows recently created printers from the database
3. Dashboard shows recently exported packages from the database
Plans:
- [ ] 07-01-PLAN.md — Add /packages route, wire dashboard queries, verify nav links
## Progress
**Execution Order:**
@@ -109,3 +137,5 @@ Phases execute in numeric order: 1 -> 2 -> 3 -> 4 -> 5
| 3. Printer Configuration | 2/2 | Complete | 2026-04-10 |
| 4. Script Generation | 2/2 | Complete | 2026-04-10 |
| 5. Package Export | 2/2 | Complete | 2026-04-10 |
| 6. Wire Icon into .intunewin Export | 0/1 | Pending | |
| 7. Dashboard & Navigation Polish | 0/1 | Pending | |