docs(11): create phase plan
Plan 4 plans across 3 waves covering UIE-01..05: form separation (Plan 01), printer edit modal (Plan 02), theme+i18n toggles (Plan 03), and client detail page (Plan 04). Wave 0 test scaffolds included in Plan 01. Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
+17
-15
@@ -3,7 +3,7 @@
|
||||
## Milestones
|
||||
|
||||
- ✅ **v1.0 MVP** — Phases 1–7, 13 plans, 27/27 requirements (shipped 2026-04-13) — see [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
|
||||
- 🚧 **v1.1 Hardening & Validation** — Phases 8–11, 15 requirements (in progress, started 2026-04-13)
|
||||
- 🚧 **v1.1 Hardening & Validation** — Phases 8–11, 15 requirements + UI enhancements (in progress, started 2026-04-13)
|
||||
|
||||
## Phases
|
||||
|
||||
@@ -28,7 +28,7 @@ Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
|
||||
- [x] **Phase 9: UX Tech Debt Closure** — Fix the three carried-over UX gaps so the deployed build is the polished one technicians actually use
|
||||
(completed 2026-04-13)
|
||||
- [x] **Phase 10: Real-World Runtime Validation** — Validate generated artifacts end-to-end against a live Intune tenant and a real managed endpoint (completed 2026-04-13)
|
||||
- [x] **Phase 11: Real-World Rollout & Feedback** — Deploy the container to a real MSP environment, push a real package, and capture structured technician feedback (completed 2026-04-13)
|
||||
- [ ] **Phase 11: UI Enhancements** — Add printer edit, separate form from list, clickable client names, dark/light mode toggle, and French/English language switch
|
||||
|
||||
## Phase Details
|
||||
|
||||
@@ -78,19 +78,21 @@ Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
|
||||
- [ ] 10-02-live-intune-runtime-validation-PLAN.md — Drive RTVAL-01..04 manual checkpoints against a live Intune tenant + real Windows endpoint, capturing screenshots and device logs as evidence
|
||||
- [ ] 10-03-report-signoff-PLAN.md — Finalize RUNTIME-VALIDATION.md, human sign-off, tick RTVAL-01..05 and mark Phase 10 complete
|
||||
|
||||
### Phase 11: Real-World Rollout & Feedback
|
||||
**Goal**: ImpTune is running in a real MSP environment, has produced a package that actually reached endpoints, and technician feedback has been captured and triaged.
|
||||
**Depends on**: Phase 9 (UX tech debt), Phase 10 (runtime validation passed)
|
||||
**Requirements**: RWR-01, RWR-02, RWR-03, RWR-04
|
||||
### Phase 11: UI Enhancements
|
||||
**Goal**: Improve the daily usability of ImpTune with printer editing, better form/list layout, client-scoped navigation, dark/light theme, and bilingual (FR/EN) support.
|
||||
**Depends on**: Phase 9 (polished base build), Phase 10 (runtime validation passed)
|
||||
**Requirements**: UIE-01, UIE-02, UIE-03, UIE-04, UIE-05
|
||||
**Success Criteria** (what must be TRUE):
|
||||
1. ImpTune is running in its single Docker container inside at least one real MSP environment serving real printers, with the host/URL recorded in the feedback document
|
||||
2. At least one printer deployment package generated by the deployed instance has been pushed to real endpoints via Intune or NinjaRMM end-to-end
|
||||
3. A reviewer can open `.planning/feedback/v1.1-rollout.md` and read structured feedback from the deploying technician covering what worked, what blocked, and what's missing
|
||||
4. Every feedback item in that document is tagged fix-in-v1.1, defer-to-v1.2, or won't-do with written rationale
|
||||
**Plans**: 3 plans
|
||||
- [x] 11-01-deploy-container-to-msp-PLAN.md — Build + deploy ImpTune container into real MSP environment and record host/URL/commit (RWR-01) — closed by operator attestation (local Docker host) 2026-04-13
|
||||
- [x] 11-02-push-real-package-PLAN.md — Generate a real package via the deployed instance and push to a real endpoint via Intune/NinjaRMM (RWR-02) — delivered end-to-end via BOTH Intune and NinjaRMM, operator attestation 2026-04-13
|
||||
- [x] 11-03-capture-and-triage-feedback-PLAN.md — Capture structured technician feedback in .planning/feedback/v1.1-rollout.md and triage every item (RWR-03, RWR-04) — feedback doc written, zero items to triage (all worked) 2026-04-13
|
||||
1. Every printer in the list has an Edit button that opens a pre-filled form and saves changes in-place without losing other printer data
|
||||
2. The new-printer form is visually separated from the printer list (distinct section, card, or page) so adding a printer doesn't feel buried in the list
|
||||
3. Every client name in the interface is a clickable link that navigates to a filtered page showing only that client's printers
|
||||
4. A toggle lets the user switch between Dark mode, Light mode, and Follow system — the chosen preference persists across page reloads
|
||||
5. A toggle lets the user switch the UI language between French and English — all labels, buttons, and messages update immediately and the choice persists
|
||||
**Plans**: 4 plans
|
||||
- [ ] 11-01-PLAN.md — Wave 0 test scaffolds + UIE-02: dedicated /printers/new page + POST redirect (UIE-02)
|
||||
- [ ] 11-02-PLAN.md — Printer edit modal: PATCH /printers/{id} + native dialog + Edit button per row (UIE-01)
|
||||
- [ ] 11-03-PLAN.md — Theme toggle + FR/EN language toggle in base.html via Alpine.js stores (UIE-04, UIE-05)
|
||||
- [ ] 11-04-PLAN.md — Client detail page /clients/{id} + clickable client names everywhere (UIE-03)
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -106,4 +108,4 @@ Full details: [`milestones/v1.0-ROADMAP.md`](milestones/v1.0-ROADMAP.md)
|
||||
| 8. Nyquist Validation Track | v1.1 | 8/8 | Complete | 2026-04-13 |
|
||||
| 9. UX Tech Debt Closure | 3/3 | Complete | 2026-04-13 | 2026-04-13 |
|
||||
| 10. Real-World Runtime Validation | v1.1 | 3/3 | Complete | 2026-04-13 |
|
||||
| 11. Real-World Rollout & Feedback | v1.1 | 3/3 | Complete | 2026-04-13 |
|
||||
| 11. UI Enhancements | v1.1 | 0/4 | Planned | |
|
||||
|
||||
Reference in New Issue
Block a user